[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"blog-post-nl-zonnepanelen-laadpaal-eendraadschema":3,"blog-alternates-blog-post-nl-zonnepanelen-laadpaal-eendraadschema-pv-ev-charger-single-line-diagram":544,"blog-next-steps-blog-post-nl-zonnepanelen-laadpaal-eendraadschema-pv-ev-charger-single-line-diagram":2322},{"id":4,"title":5,"articleId":6,"body":7,"category":519,"date":520,"description":521,"extension":522,"image":24,"lastUpdated":523,"locale":524,"meta":525,"navigation":526,"ogImage":527,"path":528,"publishDate":520,"readTime":529,"refreshInterval":530,"seo":531,"seoTitle":532,"slug":533,"stem":534,"tags":535,"__hash__":543},"blog\u002Fblog\u002Fpv-ev-charger-single-line-diagram.nl.md","Zonnepanelen en laadpaal combineren op het eendraadschema","pv-ev-charger-single-line-diagram",{"type":8,"value":9,"toc":501},"minimark",[10,18,25,28,33,42,109,122,126,129,151,154,158,161,172,175,179,182,206,213,217,220,223,246,254,258,261,278,281,285,288,296,299,316,319,323,326,329,333,336,339,359,363,371,374,394,397,400,404,407,410,413,417,420,423,440,443,447,454,457,460,463,467,475,479,498],[11,12,13,17],"p",{},[14,15,16],"strong",{},"Zonnepanelen en laadpaal zijn op het eendraadschema twee afzonderlijke takken van hetzelfde verdeelbord."," De omvormer injecteert aan zijn AC-zijde; een gewone laadpaal neemt energie af via een eigen eindkring. Een energiemanager meet en regelt beide, maar schakelt ze niet in serie. Zo teken je ze ook: twee aftakkingen, duidelijke stroomrichtingen, beveiligingen op de juiste plaats en het lastbeheer als sturing.",[11,19,20],{},[21,22],"img",{"alt":23,"src":24},"Een elektricien controleert een laadpaal naast een elektrische auto, met zonnepanelen op het dak op de achtergrond.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-pv-ev-charger-single-line-diagram-editorial.webp",[11,26,27],{},"Een sterk gecombineerd schema toont bronnen, mogelijke stroomrichtingen, beveiligingsgrenzen en meetpunten. Wat alleen de berekening, de fabrikant of de netbeheerder kan bevestigen, haal je eerst als bewijs op en teken je pas daarna in.",[29,30,32],"h2",{"id":31},"voorbeeldopdracht-voortzetten-ev1-aan-db1-toevoegen","Voorbeeldopdracht voortzetten: EV1 aan DB1 toevoegen",[11,34,35,36,41],{},"In de gezamenlijke fictieve opdracht uit de ",[37,38,40],"a",{"href":39},"\u002Fblog\u002Fzonnepanelen-schema","PV-gids"," blijven S1 en S2 via INV1 verbonden met DB1. EV1 is een nieuw unidirectioneel laadpunt aan de parkeerplaats. Teken de laadtak tot zijn werkelijke aansluitpunt in DB1; EV1 staat niet in serie met INV1. De namen verduidelijken het voorbeeld en zijn geen verplichte referenties.",[43,44,45,61],"table",{},[46,47,48],"thead",{},[49,50,51,55,58],"tr",{},[52,53,54],"th",{},"Aanvulling op de opdracht",[52,56,57],{},"Te controleren bewijs",[52,59,60],{},"Gevolg voor de documenten",[62,63,64,76,87,98],"tbody",{},[49,65,66,70,73],{},[67,68,69],"td",{},"EV1 en aansluitkabel",[67,71,72],{},"Handleiding, opname en dimensionering",[67,74,75],{},"Eigen laadtak, leiding en locatie",[49,77,78,81,84],{},[67,79,80],{},"Bijbehorende beveiliging",[67,82,83],{},"Ontwerp en bewijs van ingebouwde\u002Fexterne toestellen",[67,85,86],{},"Werkelijke functies zonder dubbeltelling",[49,88,89,92,95],{},[67,90,91],{},"Meting of lastbeheer",[67,93,94],{},"Meetpunt, fasen en fabrikantconfiguratie",[67,96,97],{},"Besturing gescheiden van vermogenspaden",[49,99,100,103,106],{},[67,101,102],{},"DB1 met PV en laadpunt",[67,104,105],{},"Herziene stroom- en beveiligingsbeoordeling",[67,107,108],{},"Gemeenschappelijke bordversie bijwerken",[11,110,111,112,116,117,121],{},"Het ",[37,113,115],{"href":114},"\u002Fblog\u002Fzonnepanelen-situatieschema","PV-situatieplan"," plaatst dezelfde referenties ruimtelijk. Met de ",[37,118,120],{"href":119},"\u002Fhelp\u002Finstallatie-plannen-en-onderverdelers-vormen","installatiehandleiding"," controleer je de ingevoerde elektrische verbindingen in het model. De stroombelastbaarheid van leidingen en toestellen bewijs je met dimensionering en datasheet, niet met een schermwaarde van het lastbeheer.",[29,123,125],{"id":124},"drie-niveaus-afzonderlijk-inventariseren","Drie niveaus afzonderlijk inventariseren",[11,127,128],{},"Breng eerst deze niveaus in kaart:",[130,131,132,139,145],"ol",{},[133,134,135,138],"li",{},[14,136,137],{},"Net en hoofdverdeling:"," aansluiting, meter, hoofdbeveiliging, aarding en betrokken borden.",[133,140,141,144],{},[14,142,143],{},"PV-productie:"," panelen of strings, DC-componenten, omvormer, AC-beveiliging en aansluitpunt.",[133,146,147,150],{},[14,148,149],{},"Laadverbruiker:"," afzonderlijke kring, overstroombeveiliging, differentieelschakelaar, leiding, laadpunt en eventuele vermogenssturing.",[11,152,153],{},"Levert de fabrikant een ander toegelaten systeemconcept, bijvoorbeeld een bidirectionele lader of een geïntegreerd hybride toestel, dan teken je precies die topologie. Model-, firmware- en systeemdocumentatie horen dan in het dossier.",[29,155,157],{"id":156},"gebruikelijke-gemeenschappelijke-ac-structuur","Gebruikelijke gemeenschappelijke AC-structuur",[11,159,160],{},"Een conventionele opstelling ziet er vereenvoudigd zo uit:",[162,163,169],"pre",{"className":164,"code":166,"language":167,"meta":168},[165],"language-text","Distributienet ↔ meter ↔ hoofdverdeelbord\n                           ├─ PV-AC-tak ↔ AC-beveiliging ↔ omvormer ↔ PV-DC-zijde\n                           └─ laadtak → beveiliging → leiding → laadpaal → voertuig\n                                      └─ meting\u002Flaststuring, indien geplaatst\n","text","",[170,171,166],"code",{"__ignoreMap":168},[11,173,174],{},"De dubbele pijl toont een mogelijke energierichting; de beveiligingsgegevens staan nog altijd bij het toestel. Een unidirectionele laadpaal blijft een verbruiker, ook wanneer de sturing “laden op zonne-overschot” heet. Teken hem dus niet als producent.",[29,176,178],{"id":177},"de-pv-tak-volledig-weergeven","De PV-tak volledig weergeven",[11,180,181],{},"Voor huishoudelijke laagspannings-PV tot en met 10 kVA vult hoofdstuk 7.112 van AREI Boek 1 V06 de algemene regels aan met specifieke maatregelen: markering van de gelijkstroomgeleiders en de actieve wisselstroomgeleiders, waarschuwingsborden (“Niet onderbreken bij belasting”, “Elektrische installatie altijd onder spanning”) en de aarding van de metalen moduleramen, tenzij de fabrikant dat verbiedt (afdeling 7.112.2). Maak de geïnstalleerde keten traceerbaar:",[183,184,185,188,191,194,197,200,203],"ul",{},[133,186,187],{},"PV-generator en relevante string- of moduleopbouw;",[133,189,190],{},"DC-leidingen met polariteit en doorsnede;",[133,192,193],{},"DC-scheiding en beschermingen wanneer geplaatst of in de omvormer geïntegreerd;",[133,195,196],{},"exact omvormermodel en maximaal AC-vermogen;",[133,198,199],{},"AC-leiding, overstroombeveiliging, differentieelschakelaar en overige ontworpen bescherming;",[133,201,202],{},"duidelijk aansluitpunt in het bord;",[133,204,205],{},"bijbehorende waarschuwingen en identificatie.",[11,207,208,209,212],{},"De gids ",[37,210,211],{"href":39},"zonnepanelen op het eendraadschema"," behandelt deze tak uitgebreider. Vul concrete fabrikantgegevens in, geen generiek vak “PV-beveiliging”.",[29,214,216],{"id":215},"de-laadpaal-als-afzonderlijke-kring","De laadpaal als afzonderlijke kring",[11,218,219],{},"AREI 7.22.3 vraagt een toegekende stroombaan, dus een afzonderlijke kring, voor elk verbindingspunt van een laadinrichting; een laadinrichting via een stopcontact op de vaste installatie aansluiten is verboden. Bij actieve bescherming met automatische onderbreking beschermt volgens 7.22.4.1 b een eigen differentieelschakelaar van ten hoogste 30 mA elke afzonderlijke wisselstroomkring. Daarnaast moet de bescherming blijven werken bij isolatiefouten met een storende gelijkstroomcomponent: via een daarvoor gebouwde differentieelschakelaar of via een differentieelschakelaar in coördinatie met een detectietoestel voor DC-foutstroom dat de laadpaal uitschakelt. Volgens 7.22.4.2 krijgt elke afzonderlijke kring ook zijn eigen overstroombeveiliging. Die toestellen mogen in het bord, in de laadpaal of in een combinatie van beide zitten.",[11,221,222],{},"Vermeld dus minstens:",[183,224,225,228,231,234,237,240,243],{},[133,226,227],{},"kringreferentie en fasen;",[133,229,230],{},"overstroombeveiliging met aantal polen en nominale stroom;",[133,232,233],{},"differentieelschakelaar met type, aanspreekstroom en eventuele gecoördineerde DC-detectie;",[133,235,236],{},"kabeltype, geleideraantal en doorsnede;",[133,238,239],{},"laadpaal en aantal aansluitpunten;",[133,241,242],{},"nominaal vermogen of maximale laadstroom;",[133,244,245],{},"vaste stuur-, meet- of afschakelcomponenten.",[11,247,248,249,253],{},"Staat de laadpaal in open lucht, dan vraagt 7.22.5.1 voor het materieel minstens IP44. De toegelaten combinatie volgt uit AREI, productnormen en de handleiding van het concrete toestel samen. ",[37,250,252],{"href":251},"\u002Fblog\u002Fdifferentieel-type-a-vs-type-b","Differentieel type A versus type B"," geeft je de achtergrond; de goedkeuring van het concrete model haal je uit de fabrikantdocumentatie.",[29,255,257],{"id":256},"energiemanagement-correct-positioneren","Energiemanagement correct positioneren",[11,259,260],{},"Laden op PV-overschot of het begrenzen van netafname vraagt meting en regeling. Een systeem kan een energiemeter, stroomtransformatoren, controller, dataverbinding en regelbare laadpaal bevatten. Plaats de elektrisch relevante vaste delen op hun echte positie:",[183,262,263,266,269,272,275],{},[133,264,265],{},"meetpunt aan de aansluiting of het betrokken bord;",[133,267,268],{},"stroomtransformatoren met correcte faserichting;",[133,270,271],{},"voeding van de energiemanager;",[133,273,274],{},"contactor of stuurcontact als dit elektrisch schakelt of vrijgeeft;",[133,276,277],{},"datalijn voor zover nodig om de functie te begrijpen.",[11,279,280],{},"Een gestippelde lijn onderscheidt communicatie van energiegeleiders; definieer ze in de legende. “100% zonnestroom” hoort niet op het schema: productie, woningverbruik, laadvermogen en regeling veranderen voortdurend.",[29,282,284],{"id":283},"fasen-en-vermogensbalans","Fasen en vermogensbalans",[11,286,287],{},"Teken de werkelijke fasebezetting van omvormer en laadpaal. Een eenfasige omvormer en een driefasige lader worden niet dezelfde tak omdat een meter saldeert. Softwarematige stroombegrenzing stuurt de werking; doorsnede en overstroombeveiliging bewijs je nog altijd afzonderlijk.",[11,289,290,291,295],{},"De ",[37,292,294],{"href":293},"\u002Fblog\u002Fkabeldoorsnede-automaat","combinatie van kabeldoorsnede en automaat"," bepaal je daarom voor de PV-tak en de laadkring elk volledig.",[11,297,298],{},"Controleer bij het ontwerp onder meer:",[183,300,301,304,307,310,313],{},[133,302,303],{},"aansluitvermogen en toegelaten fasebelasting;",[133,305,306],{},"gelijktijdige productie en afname;",[133,308,309],{},"belasting van rails en bovenliggende toestellen bij alle mogelijke stroomrichtingen;",[133,311,312],{},"kortsluit-, selectiviteits- en spanningsvalvoorwaarden;",[133,314,315],{},"meetbereik en fabrikantgrenzen van de sturing.",[11,317,318],{},"Het schema legt de gekozen uitvoering vast; het is niet de berekening zelf.",[29,320,322],{"id":321},"bidirectioneel-laden-is-een-ander-systeem","Bidirectioneel laden is een ander systeem",[11,324,325],{},"Kan de laadpaal energie uit het voertuig terugleveren aan de installatie of het net, dan is ze niet langer alleen verbruiker. AREI 7.22.5.4 vraagt dan dat je voldoet aan de voorschriften voor decentrale productie-eenheden – voor de bescherming tegen elektrische schokken, tegen overstroom en voor de veiligheidsonderbreking – en dat de waarschuwing “Opgelet: mogelijke teruglevering van elektrische energie in de installatie” op de laadinrichting en op de gevoede verdeelborden hangt. Synergrid vermeldt dat bidirectionele of technisch bidirectioneel geschikte laadinfrastructuur onder C10\u002F11 en C10\u002F26-homologatie valt; een zuiver unidirectionele lader niet.",[11,327,328],{},"Toon stroomrichtingen en scheidings- en beschermingsfuncties exact volgens het goedgekeurde systeemconcept. Het schema van een gewone wallbox past niet op Vehicle-to-Home of Vehicle-to-Grid.",[29,330,332],{"id":331},"situatieplan-en-dossier","Situatieplan en dossier",[11,334,335],{},"Lokaliseer panelen, omvormer, relevante scheiders, verdeelborden, vaste meetapparatuur, laadpaal en bijbehorende parkeerplaats. Gebruik dezelfde kringreferenties als op het eendraadschema. Datasheets, toestelverklaringen, instellingen en latere wijzigingen horen in het installatiedossier.",[11,337,338],{},"Bij je eindcontrole check je minstens:",[183,340,341,344,347,350,353,356],{},[133,342,343],{},"overeenstemming tussen schema, bordlabels en as-built installatie;",[133,345,346],{},"volledige traceerbaarheid van beide takken tot hun gemeenschappelijke punt;",[133,348,349],{},"correcte pijlrichting voor elk energiepad;",[133,351,352],{},"bescherming aan de juiste zijde en zonder fictieve dubbels;",[133,354,355],{},"lastbeheer als regeling, niet als beveiliging;",[133,357,358],{},"duidelijke aanduiding van uni- of bidirectionele laadfunctie.",[29,360,362],{"id":361},"latere-uitbreidingen-correct-verwerken","Latere uitbreidingen correct verwerken",[11,364,365,366,370],{},"Een gecombineerd energiesysteem verandert vaak na de eerste oplevering. Een andere omvormer, extra panelen, een tweede laadconnector, een thuisbatterij of een nieuwe meetmethode verwerk je niet door alleen een toestelnaam te wijzigen. Volg elke gewijzigde tak opnieuw tot het gemeenschappelijke verdeelbord. Hoe je een thuisbatterij als bron in de installatie integreert, lees je in ",[37,367,369],{"href":368},"\u002Fblog\u002Fthuisbatterij-arei","Thuisbatterij en AREI",".",[11,372,373],{},"Leg bij een uitbreiding minstens vast:",[183,375,376,379,382,385,388,391],{},[133,377,378],{},"bijkomende bron of nieuw aansluitpunt;",[133,380,381],{},"gewijzigde maximale AC-waarde en mogelijke stroomrichting;",[133,383,384],{},"nieuwe of anders gecoördineerde beveiligingen;",[133,386,387],{},"nieuwe sensorpositie en fasekoppeling van de lastregeling;",[133,389,390],{},"aangepaste leiding, bordkring en fysieke labels;",[133,392,393],{},"softwarelimieten altijd samen met toestelversie en bewaarde instellingen.",[11,395,396],{},"Een batterij of bidirectioneel voertuig is geen onzichtbare appfunctie. Zodra energie vanuit een bijkomende bron de vaste installatie kan bereiken, staan bron, scheiding, bescherming en waarschuwing in de technische documentatie. Bewaar de vervangen planversie en markeer ondubbelzinnig welke versie de actuele toestand weergeeft. Werk ook het situatieplan bij: een verplaatste meter of een nieuw toestel raakt meer dan alleen het eendraadschema.",[11,398,399],{},"Leg bij overdracht bovendien vast wie de vermogensregeling mag wijzigen en waar de actuele instellingen bewaard worden. Zo blijft een latere interventie controleerbaar.",[29,401,403],{"id":402},"praktijkvoorbeeld-een-tweede-laadpunt-bij-bestaande-pv","Praktijkvoorbeeld: een tweede laadpunt bij bestaande PV",[11,405,406],{},"Een gebouw heeft al een PV-omvormer en een unidirectionele wallbox; nu komt er een tweede aansluitpunt bij. Kopieer niet gewoon het eerste symbool. Bepaal of het om een tweede toestel, één station met twee aansluitpunten of een andere fabrikantarchitectuur gaat en waar overstroombeveiliging en differentieelschakelaar werkelijk zitten. AREI 7.22.4.2 laat bij meerdere verbindingspunten die niet tegelijk gebruikt worden een gemeenschappelijke overstroombeveiliging toe, op voorwaarde dat elk punt de vereiste bescherming behoudt – bijvoorbeeld wanneer de nominale stroom van de gemeenschappelijke beveiliging niet hoger is dan de laagste nominale stroom van de verbindingspunten. Die uitzondering geldt alleen voor de overstroombeveiliging, niet voor gedeelde differentieelschakelaars of leidingen.",[11,408,409],{},"Werk vervolgens aansluitvermogen, fasetoewijzing en lastbeheer bij. Beide punten mogen de beschikbare stroom dynamisch verdelen, maar het schema toont nog steeds elk aansluitpunt, de echte elektrische onderverdeling en de maximaal toegelaten belasting. Stroomsensoren horen bij de gemeten geleiders en de juiste richting. De as-built bekabeling bewijs je met opname en toesteldocumentatie, niet met een softwarescherm met twee parkeerplaatsen.",[11,411,412],{},"Controleer ook de PV-tak opnieuw. Verandert alleen het verbruik, dan blijven modules en omvormer gelijk, maar het gemeenschappelijke bord en de mogelijke stroomrichtingen kunnen een nieuwe beoordeling vragen. Komt er tegelijk een hybride omvormer of batterij bij, dan ontstaat een bijkomende bron of bedrijfsmodus met eigen traceerbare beveiliging, scheiding en documentatie.",[29,414,416],{"id":415},"bouw-een-bewijsreeks-voor-ingebruikname","Bouw een bewijsreeks voor ingebruikname",[11,418,419],{},"Koppel elk belangrijk grenspunt op het schema aan bewijs: typeplaat of fiche voor vermogenswaarden, fabrikantschema voor geïntegreerde beveiligingen, meetverslag voor de uitgevoerde installatie en configuratie-export voor relevante begrenzingen. Markeer aannames als open. Een differentieeltype of DC-foutstroomdetectie teken je pas als aanwezig wanneer toestel en inbouw dat aantonen.",[11,421,422],{},"Doorloop bij de eindcontrole meerdere energietoestanden:",[130,424,425,428,431,434,437],{},[133,426,427],{},"'s nachts laden zonder PV-productie;",[133,429,430],{},"PV-productie bij lage gebouwbelasting;",[133,432,433],{},"PV en laden tegen een dynamische importlimiet;",[133,435,436],{},"uitval van meting of communicatie van het lastbeheer;",[133,438,439],{},"bij bidirectionele techniek, energie die uit het voertuig terugvloeit.",[11,441,442],{},"Voor elke toestand moeten stroompad, limiet, bescherming en veilige terugval uit ontwerp en fabrikantconcept verklaarbaar zijn. Het eendraadschema toont niet elke softwarebeslissing, wel elke elektrisch relevante component en elke mogelijke bronrichting.",[29,444,446],{"id":445},"houd-netprocedure-en-producthomologatie-apart","Houd netprocedure en producthomologatie apart",[11,448,449,450,370],{},"AREI-documentatie, Synergrid-typehomologatie en de aansluitprocedure van de bevoegde distributienetbeheerder beantwoorden verschillende vragen. Een deskundig ontworpen beveiligingsconcept bewijst geen C10\u002F26-vermelding; een vermeld product bewijst geen correcte installatie in dit gebouw. Synergrid stelt momenteel dat zuiver unidirectionele laders onder C10\u002F11 ed.2.4 geen C10\u002F26-homologatie nodig hebben; andere technische of netvoorwaarden kunnen wel gelden. Wat je doet als het toestel niet op de lijst staat, lees je in ",[37,451,453],{"href":452},"\u002Fblog\u002Fsynergrid-c10-26-lijst-omvormer","Synergrid-lijst C10\u002F26",[11,455,456],{},"Bewaar toestelmodel, firmware, uni- of bidirectionele capaciteit, communicatie met de netbeheerder en de echte inbedrijfstellingsinstellingen bij de planrevisie. Zo blijft zichtbaar op welke technische toestand een goedkeuring of controle betrekking had.",[11,458,459],{},"Noteer bij een latere firmwarewijziging of alleen de bediening verandert, of ook maximale stroom, terugvoedingsmogelijkheid of beveiligingsgedrag. In het tweede geval beoordeelt de vakpersoon ontwerp, netvoorwaarden en documentatie opnieuw. Een automatische update mag de technische basis niet ongemerkt verschuiven.",[11,461,462],{},"Label in het verdeelbord PV- en laadaftakking met dezelfde referenties als op het plan. Bij mogelijke terugvoeding hangen de vereiste waarschuwingen op de werkelijk betrokken plaatsen; een melding alleen in de app volstaat niet. Vergelijk vóór overdracht elk bordlabel, toesteltype en de mogelijke energierichting met de eindversie van het schema.",[29,464,466],{"id":465},"uitwerken-in-planelec","Uitwerken in PlanElec",[11,468,469,470,474],{},"In ",[37,471,473],{"href":472},"\u002F","PlanElec"," leg je PV- en laadtak vast in één projectmodel: strings per MPPT, omvormer, AC-scheiding en bronbeveiliging aan de ene kant, de wallbox met eigen kring aan de andere. Eendraadschema en situatieplan ontstaan uit dezelfde gegevens en exporteer je als pdf. De AREI\u002FRGIE-zelfcontrole meldt onder meer wanneer een wallbox geen eigen kring, geen differentieelschakelaar van 30 mA of geen passende bescherming tegen DC-foutstromen heeft, en toont ontbrekende stringkoppelingen. De rollen zijn duidelijk: de zelfcontrole toont je bevindingen binnen de ondersteunde regels; beveiligingscoördinatie en netgoedkeuring regel je met berekening en netbeheerder, de keuring doet het erkende organisme.",[29,476,478],{"id":477},"officiële-bronnen","Officiële bronnen",[183,480,481,490],{},[133,482,483,489],{},[37,484,488],{"href":485,"rel":486},"https:\u002F\u002Feconomie.fgov.be\u002Ffr\u002Fpublications\u002Freglement-general-sur-les",[487],"nofollow","AREI\u002FRGIE Boek 1 bij de FOD Economie",": hoofdstukken 7.22 en 7.112 en delen 3 en 9, gecontroleerd volgens V06.",[133,491,492,497],{},[37,493,496],{"href":494,"rel":495},"https:\u002F\u002Fwww.synergrid.be\u002Fnl\u002Fhomologatie\u002Felektriciteit\u002Fdecentrale-productie-eenheden",[487],"Synergrid: homologatie van decentrale productie-eenheden",": C10\u002F11 ed.2.4, C10\u002F26 en de afbakening voor bidirectioneel laden.",[11,499,500],{},"Inhoudelijk nagekeken op 5 oktober 2026. Controleer vóór uitvoering altijd de actuele aansluitvoorwaarden en de fabrikantversie.",{"title":168,"searchDepth":502,"depth":502,"links":503},2,[504,505,506,507,508,509,510,511,512,513,514,515,516,517,518],{"id":31,"depth":502,"text":32},{"id":124,"depth":502,"text":125},{"id":156,"depth":502,"text":157},{"id":177,"depth":502,"text":178},{"id":215,"depth":502,"text":216},{"id":256,"depth":502,"text":257},{"id":283,"depth":502,"text":284},{"id":321,"depth":502,"text":322},{"id":331,"depth":502,"text":332},{"id":361,"depth":502,"text":362},{"id":402,"depth":502,"text":403},{"id":415,"depth":502,"text":416},{"id":445,"depth":502,"text":446},{"id":465,"depth":502,"text":466},{"id":477,"depth":502,"text":478},"tutorial","2026-08-29","Zo teken je PV-omvormer, laadpaal, afzonderlijke kringen, beveiligingen, energiemeting en mogelijke terugvoeding correct in één gemeenschappelijk eendraadschema.","md","2026-10-05","nl",{},true,"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-pv-ev-charger-single-line-diagram-editorial.jpg","\u002Fblog\u002Fpv-ev-charger-single-line-diagram.nl","11 min",12,{"title":5,"description":521},null,"zonnepanelen-laadpaal-eendraadschema","blog\u002Fpv-ev-charger-single-line-diagram.nl",[536,537,538,539,540,541,542],"Zonnepanelen","Laadpaal","Eendraadschema","AREI","Energiemanagement","Terugvoeding","België","J0OXi5vzs0PnYhkrJctfkTHHn-Tfh6J7NM_E1pk335I",[545,1046,1518,1994],{"id":546,"title":547,"articleId":6,"body":548,"category":519,"date":520,"description":1031,"extension":522,"image":24,"lastUpdated":523,"locale":1032,"meta":1033,"navigation":526,"ogImage":527,"path":1034,"publishDate":520,"readTime":529,"refreshInterval":530,"seo":1035,"seoTitle":532,"slug":1036,"stem":1037,"tags":1038,"__hash__":1045},"blog\u002Fblog\u002Fpv-ev-charger-single-line-diagram.de.md","PV-Anlage und Ladestation im Eindrahtschema kombinieren",{"type":8,"value":549,"toc":1014},[550,556,561,564,568,576,637,650,654,657,677,680,684,687,693,696,700,703,726,733,737,740,743,766,774,778,785,802,805,809,812,820,823,840,843,847,850,853,857,860,863,883,887,894,897,917,920,924,927,930,933,937,940,943,960,963,967,974,977,980,984,990,994,1011],[11,551,552,555],{},[14,553,554],{},"PV-Anlage und Ladestation sind im Eindrahtschema zwei getrennte Zweige am selben Verteiler."," Der PV-Wechselrichter speist auf seiner AC-Seite ein, die Ladestation bezieht Energie über einen eigenen Endstromkreis. Ein Energiemanagement misst und steuert beide, schaltet sie aber nicht in Reihe. Genau so zeichnest du sie auch: zwei Abgänge, klare Stromrichtungen, Schutzgeräte an der richtigen Stelle und das Lastmanagement als Steuerung.",[11,557,558],{},[21,559],{"alt":560,"src":24},"Ein Elektriker prüft eine Wallbox neben einem Elektroauto; im Hintergrund liegen PV-Module auf dem Dach.",[11,562,563],{},"Ein gutes gemeinsames Schema zeigt Energiequellen, mögliche Stromrichtungen, Schutzgrenzen und Messpunkte. Was nur Hersteller, Netzbetreiber oder die konkrete Auslegung bestätigen können, holst du dir als Nachweis und trägst es erst dann ein.",[29,565,567],{"id":566},"beispielauftrag-fortsetzen-ev1-an-db1-ergänzen","Beispielauftrag fortsetzen: EV1 an DB1 ergänzen",[11,569,570,571,575],{},"Im gemeinsamen fiktiven Auftrag aus dem ",[37,572,574],{"href":573},"\u002Fde\u002Fblog\u002Fpv-anlage-schema","PV-Leitfaden"," bleiben S1 und S2 über INV1 mit DB1 verbunden. EV1 ist ein neuer unidirektionaler Ladepunkt am Stellplatz. Zeichne den Ladezweig bis zu seiner tatsächlichen Anschlussstelle in DB1; EV1 liegt nicht in Reihe mit INV1. Die Namen dienen der Erklärung und sind keine verpflichtenden Referenzen.",[43,577,578,591],{},[46,579,580],{},[49,581,582,585,588],{},[52,583,584],{},"Nachtrag im Auftrag",[52,586,587],{},"Zu prüfender Beleg",[52,589,590],{},"Auswirkung auf die Dokumente",[62,592,593,604,615,626],{},[49,594,595,598,601],{},[67,596,597],{},"EV1 und Anschlussleitung",[67,599,600],{},"Geräteanleitung, Aufnahme und Dimensionierung",[67,602,603],{},"Eigener Ladezweig, Leitung und Standort",[49,605,606,609,612],{},[67,607,608],{},"Zugehörige Schutzfunktionen",[67,610,611],{},"Planung und Nachweis integrierter\u002Fexterner Geräte",[67,613,614],{},"Tatsächlich vorhandene Funktionen ohne Doppelzählung",[49,616,617,620,623],{},[67,618,619],{},"Messung oder Lastmanagement",[67,621,622],{},"Messstelle, Phasen und Herstellerkonfiguration",[67,624,625],{},"Steuerung klar von Energiepfaden getrennt",[49,627,628,631,634],{},[67,629,630],{},"DB1 mit PV und Ladepunkt",[67,632,633],{},"Überarbeitete Strom- und Schutzbewertung",[67,635,636],{},"Gemeinsamen Verteilerstand aktualisieren",[11,638,639,640,644,645,649],{},"Der ",[37,641,643],{"href":642},"\u002Fde\u002Fblog\u002Fpv-anlage-situationsplan","PV-Positionsplan"," ordnet dieselben Referenzen räumlich zu. Mit der ",[37,646,648],{"href":647},"\u002Fde\u002Fhelp\u002Finstallation-planen-und-unterverteilungen-bilden","Installations-Anleitung"," prüfst du die erfassten elektrischen Verbindungen im Modell. Die Belastbarkeit von Leitern und Geräten belegst du mit Dimensionierung und Datenblatt, nicht mit einem Anzeigewert des Lastmanagements.",[29,651,653],{"id":652},"die-drei-ebenen-auseinanderhalten","Die drei Ebenen auseinanderhalten",[11,655,656],{},"Erfasse zuerst drei zusammenhängende, aber getrennte Ebenen:",[130,658,659,665,671],{},[133,660,661,664],{},[14,662,663],{},"Netz und Hauptverteilung:"," Anschluss, Zähler, Hauptschutz, Erdung und relevante Verteiler.",[133,666,667,670],{},[14,668,669],{},"PV-Erzeugung:"," Module oder Strings, DC-Komponenten, Wechselrichter, AC-Schutz und Einspeisepunkt.",[133,672,673,676],{},[14,674,675],{},"Ladeverbraucher:"," eigener Stromkreis, Überstromschutz, Differenzialschalter, Leitung, Ladepunkt und gegebenenfalls Laststeuerung.",[11,678,679],{},"Gibt der Hersteller ein anderes, zugelassenes Systemkonzept vor – etwa einen bidirektionalen Ladepunkt oder ein integriertes Hybridgerät –, zeichnest du genau diese Topologie. Herstellerunterlagen und Geräteversionen gehören dann ins Dossier.",[29,681,683],{"id":682},"typische-gemeinsame-ac-topologie","Typische gemeinsame AC-Topologie",[11,685,686],{},"Eine konventionelle Anlage sieht vereinfacht so aus:",[162,688,691],{"className":689,"code":690,"language":167,"meta":168},[165],"Verteilnetz ↔ Zähler ↔ Hauptverteiler\n                         ├─ PV-AC-Zweig ↔ AC-Schutz ↔ Wechselrichter ↔ PV-DC-Seite\n                         └─ Ladezweig → Schutz → Leitung → Ladestation → Fahrzeug\n                                      └─ Messung\u002FLastmanagement, falls vorhanden\n",[170,692,690],{"__ignoreMap":168},[11,694,695],{},"Der Doppelpfeil am Netz und am PV-Zweig zeigt mögliche Energieflüsse; die Schutzangabe steht trotzdem am Gerät. Eine übliche unidirektionale Wallbox ist ein Verbraucherzweig. Sie bleibt das auch dann, wenn die Software „PV-Überschussladen“ anbietet – zeichne sie nicht als Erzeuger.",[29,697,699],{"id":698},"pv-zweig-vollständig-dokumentieren","PV-Zweig vollständig dokumentieren",[11,701,702],{},"Für hauswirtschaftliche Niederspannungs-PV-Anlagen bis 10 kVA ergänzt Kapitel 7.112 von AREI Buch 1 V06 die allgemeinen Anforderungen um besondere Maßnahmen: Kennzeichnung der DC-Leiter und der aktiven AC-Leiter, Warnschilder („Nicht unter Last ausschalten“, „Elektrische Anlage steht immer unter Spannung“) und die Erdung der Modulrahmen, sofern der Hersteller sie nicht verbietet (Abschnitt 7.112.2). Im Schema beziehungsweise Dossier bleiben die tatsächlich vorhandenen Komponenten nachvollziehbar:",[183,704,705,708,711,714,717,720,723],{},[133,706,707],{},"PV-Generator mit String- und Modulstruktur, soweit für die elektrische Dokumentation erforderlich;",[133,709,710],{},"DC-Leitungen, Polarität und Querschnitt;",[133,712,713],{},"DC-Trenn- und Schutzeinrichtungen, wenn installiert oder im Wechselrichter integriert;",[133,715,716],{},"Wechselrichter mit Modell und maximaler AC-Leistung;",[133,718,719],{},"AC-Leitung, Überstromschutz, Differenzialschalter und weitere Schutzgeräte nach Auslegung und Hersteller;",[133,721,722],{},"eindeutiger Anschlusspunkt am Verteiler;",[133,724,725],{},"Warn- und Kennzeichnungsinformationen der ausgeführten Anlage.",[11,727,728,729,732],{},"Der Leitfaden ",[37,730,731],{"href":573},"PV-Anlage im Eindrahtschema"," vertieft diesen Zweig. Trage konkrete Herstellerdaten ein, keine Sammelbezeichnung wie „PV-Sicherung“.",[29,734,736],{"id":735},"ladezweig-als-getrennten-stromkreis-zeigen","Ladezweig als getrennten Stromkreis zeigen",[11,738,739],{},"AREI 7.22.3 verlangt für jeden Anschlusspunkt einer Ladestation einen getrennten Stromkreis; eine Ladestation über eine Steckvorrichtung an die feste Anlage anzuschließen ist verboten. Beim Schutz durch automatische Abschaltung schützt nach 7.22.4.1 b ein eigener Differenzialschalter mit höchstens 30 mA jeden getrennten Wechselstromkreis. Zusätzlich muss der Schutz bei Isolationsfehlern mit störendem Gleichstromanteil funktionieren: entweder über einen dafür gebauten Differenzialschalter oder über einen Differenzialschalter in Koordination mit einer Fehlergleichstrom-Nachweiseinrichtung, die die Ladestation abschaltet. Nach 7.22.4.2 hat außerdem jeder getrennte Stromkreis seinen eigenen Überstromschutz. Diese Einrichtungen dürfen im Verteiler, in der Ladestation oder kombiniert sitzen.",[11,741,742],{},"Im Schema stehen deshalb mindestens:",[183,744,745,748,751,754,757,760,763],{},[133,746,747],{},"Stromkreisreferenz und Phasen;",[133,749,750],{},"Überstrom-Schutzeinrichtung mit Polzahl und Bemessungsstrom;",[133,752,753],{},"Differenzialschalter mit Typ, Bemessungsdifferenzstrom und gegebenenfalls koordinierter DC-Erkennung;",[133,755,756],{},"Leitungstyp, Leiterzahl und Querschnitt;",[133,758,759],{},"Ladestation und Anzahl der Anschlusspunkte;",[133,761,762],{},"Nennleistung beziehungsweise maximaler Ladestrom;",[133,764,765],{},"fest installierte Steuer- oder Abschaltkomponenten.",[11,767,768,769,773],{},"Steht die Ladestation im Freien, verlangt 7.22.5.1 für die Betriebsmittel mindestens IP44. Welche Kombination im konkreten Gerät zulässig ist, entscheiden AREI, Produktnormen und Herstellerdokumentation gemeinsam. Hintergrund liefert die ",[37,770,772],{"href":771},"\u002Fde\u002Fblog\u002Ffi-typ-a-vs-typ-b","Gegenüberstellung von FI Typ A und Typ B","; die Freigabe des konkreten Geräts holst du dir aus dessen Unterlagen.",[29,775,777],{"id":776},"lastmanagement-sichtbar-aber-nicht-überladen-darstellen","Lastmanagement sichtbar, aber nicht überladen darstellen",[11,779,780,781,784],{},"PV-Überschussladen oder eine Begrenzung des Netzbezugs braucht Messwerte und eine Steuerlogik. Je nach System sind Energiezähler, Stromsensoren, Controller, Datenleitungen und ein steuerbarer Ladepunkt beteiligt. Im Eindrahtschema stehen die ",[14,782,783],{},"elektrisch relevanten festen Komponenten"," an ihrem richtigen Ort:",[183,786,787,790,793,796,799],{},[133,788,789],{},"Messpunkt am Netzanschluss oder am betroffenen Verteiler;",[133,791,792],{},"Stromwandler mit korrekter Phasenzuordnung, wenn fest eingebaut;",[133,794,795],{},"Versorgung des Energiemanagers;",[133,797,798],{},"Schütz oder Steuerkontakt, wenn er eine elektrische Trenn- oder Freigabefunktion hat;",[133,800,801],{},"Datenverbindung nur so weit, wie sie zum Verständnis der Funktion nötig ist.",[11,803,804],{},"Eine gestrichelte Steuerlinie trennt Kommunikations- von Energiepfaden; definiere sie in der Legende. „100 % Solarstrom“ gehört nicht ins Schema: Netzbezug, PV-Leistung, Fahrzeugbedarf und Regelstrategie ändern sich laufend.",[29,806,808],{"id":807},"einphasig-dreiphasig-und-leistungsbilanz","Einphasig, dreiphasig und Leistungsbilanz",[11,810,811],{},"Dokumentiere die wirkliche Phasenbelegung von Wechselrichter und Ladestation. Bei einphasiger PV und dreiphasigem Laden ist eine saldierende Messung wirtschaftlich interessant, an der physikalischen Phasenbelegung ändert sie nichts. Eine Softwarebegrenzung der Leistung steuert den Betrieb; Leiterdimensionierung und Überstromschutz weist du trotzdem eigenständig nach.",[11,813,814,815,819],{},"Die ",[37,816,818],{"href":817},"\u002Fde\u002Fblog\u002Fkabelquerschnitt-sicherungsautomat","Zuordnung von Kabelquerschnitt und Schutzorgan"," belegst du deshalb für PV- und Ladezweig jeweils separat und vollständig.",[11,821,822],{},"Prüfe für die Planung unter anderem:",[183,824,825,828,831,834,837],{},[133,826,827],{},"Anschlussleistung und zulässige Phasenbelastung;",[133,829,830],{},"gleichzeitige Verbraucher und Erzeuger;",[133,832,833],{},"Bemessung von Sammelschienen und vorgeschalteten Geräten für alle möglichen Stromrichtungen;",[133,835,836],{},"Kurzschluss-, Selektivitäts- und Spannungsfallbedingungen;",[133,838,839],{},"Herstellergrenzen der Mess- und Steuereinrichtungen.",[11,841,842],{},"Das Schema dokumentiert das Ergebnis dieser Berechnung, nicht die Berechnung selbst.",[29,844,846],{"id":845},"bidirektionales-laden-gesondert-behandeln","Bidirektionales Laden gesondert behandeln",[11,848,849],{},"Kann eine Ladestation Energie aus dem Fahrzeug in die feste Anlage oder ins Netz zurückspeisen, ist sie nicht mehr nur Verbraucher. AREI 7.22.5.4 verlangt dann, die Vorschriften für dezentrale Erzeugungseinheiten zu erfüllen – insbesondere Schutz gegen elektrischen Schlag, Überstromschutz und Sicherheitsabschaltung –, und das Warnschild „Achtung: Mögliche Rückspeisung elektrischer Energie in die Anlage“ an der Ladestation und an den versorgenden Verteilern. Nach Synergrid fällt bidirektionale oder technisch bidirektional fähige Ladeinfrastruktur in den Anwendungsbereich von C10\u002F11 und der C10\u002F26-Homologation; rein unidirektionale Ladegeräte nicht.",[11,851,852],{},"Zeichne bei bidirektionalen Systemen Stromrichtungen, Trenn- und Schutzfunktionen exakt nach dem genehmigten Systemkonzept. Die Topologie einer normalen Wallbox passt nicht auf Vehicle-to-Home oder Vehicle-to-Grid.",[29,854,856],{"id":855},"positionsplan-und-dossier","Positionsplan und Dossier",[11,858,859],{},"Der Positionsplan lokalisiert Module, Wechselrichter, relevante Trennstellen, Verteiler, feste Messgeräte, Ladestation und Stellplatz. Verwende dieselben Stromkreisreferenzen wie im Eindrahtschema. Datenblätter, Einstellungen, Konformitätsunterlagen der Geräte und Änderungen gehören ins Installationsdossier.",[11,861,862],{},"Vor Abschluss prüfst du als Planer oder Installateur:",[183,864,865,868,871,874,877,880],{},[133,866,867],{},"Stimmen Schema, Verteilerbeschriftung und Ist-Anlage überein?",[133,869,870],{},"Sind beide Zweige bis zum gemeinsamen Anschlusspunkt nachvollziehbar?",[133,872,873],{},"Zeigt jeder Energiepfad in die richtige Richtung?",[133,875,876],{},"Sitzen die Schutzgeräte auf der richtigen Seite und ohne Doppelzählung?",[133,878,879],{},"Ist das Lastmanagement als Steuerung dargestellt und nicht als Schutz?",[133,881,882],{},"Ist die Ladefunktion eindeutig als unidirektional oder bidirektional dokumentiert?",[29,884,886],{"id":885},"änderungen-später-sauber-nachführen","Änderungen später sauber nachführen",[11,888,889,890,370],{},"Gekoppelte Energiesysteme bleiben selten so, wie sie zuerst gebaut wurden. Ein neuer Wechselrichter, eine zweite Modulfläche, ein stärkerer Ladepunkt, ein Batteriespeicher oder eine geänderte Messmethode verändern die Topologie. Aktualisiere deshalb nicht nur den Gerätenamen, sondern verfolge den ganzen Pfad bis zum gemeinsamen Verteiler. Wie du einen Heimspeicher als Quelle in die Installation integrierst, steht in ",[37,891,893],{"href":892},"\u002Fde\u002Fblog\u002Fheimspeicher-arei","Heimspeicher und AREI",[11,895,896],{},"Bei einer Erweiterung erfasst du insbesondere neu:",[183,898,899,902,905,908,911,914],{},[133,900,901],{},"zusätzliche Quelle oder zusätzlichen Anschlusspunkt;",[133,903,904],{},"geänderte maximale AC-Leistung und mögliche Stromrichtung;",[133,906,907],{},"neue oder anders koordinierte Schutzgeräte;",[133,909,910],{},"geänderte Sensorposition und Phasenzuordnung des Lastmanagements;",[133,912,913],{},"neue Leitungsdaten, Verteilerabgänge und Beschriftungen;",[133,915,916],{},"Softwarebegrenzungen immer zusammen mit Geräte- und Einstellungsdokumentation.",[11,918,919],{},"Ein Batteriespeicher oder ein bidirektionales Fahrzeug ist keine unsichtbare Softwarefunktion. Sobald Energie aus einer weiteren Quelle in die feste Installation gelangen kann, müssen Quelle, Trennung, Schutz und Warnhinweise in der technischen Dokumentation stehen. Archiviere die ersetzte Fassung und kennzeichne die aktuelle Version eindeutig.",[29,921,923],{"id":922},"praxisbeispiel-zweiter-ladepunkt-an-einer-bestehenden-pv-anlage","Praxisbeispiel: zweiter Ladepunkt an einer bestehenden PV-Anlage",[11,925,926],{},"Ein Gebäude hat bereits einen PV-Wechselrichter und eine unidirektionale Wallbox; jetzt kommt ein zweiter Anschlusspunkt dazu. Kopiere nicht einfach das erste Symbol. Kläre, ob ein separates Gerät, eine Ladestation mit zwei Anschlusspunkten oder eine andere Herstellerarchitektur zum Einsatz kommt und wo Überstromschutz und Differenzialschalter tatsächlich sitzen. AREI 7.22.4.2 erlaubt für mehrere nicht gleichzeitig benutzte Anschlusspunkte gemeinsame Überstrom-Schutzeinrichtungen, sofern jeder Anschlusspunkt den erforderlichen Schutz behält – etwa wenn der Bemessungsstrom der gemeinsamen Einrichtung den niedrigsten Bemessungsstrom der Anschlusspunkte nicht überschreitet. Diese Ausnahme betrifft nur den Überstromschutz; gemeinsame Differenzialschalter oder Leitungen deckt sie nicht ab.",[11,928,929],{},"Aktualisiere anschließend Anschlussleistung, Phasenbelegung und Lastmanagement. Beide Punkte dürfen sich die verfügbare Leistung dynamisch teilen, die Zeichnung zeigt aber weiterhin jeden Anschlusspunkt, seine reale elektrische Unterteilung und die maximal freigegebene Belastung. Sensoren passen zum gemessenen Leiter und zur Flussrichtung. Die as-built Verdrahtung belegst du mit Aufnahme und Geräteunterlagen, nicht mit einer Softwareansicht mit zwei Ladeplätzen.",[11,931,932],{},"Prüfe auch den PV-Pfad neu. Hat sich nur der Verbrauch geändert, bleiben Module und Wechselrichter gleich, die Bewertung des gemeinsamen Verteilers und der Stromrichtungen kann sich aber ändern. Kommt gleichzeitig ein Hybridwechselrichter oder Speicher dazu, ist das eine zusätzliche Quelle beziehungsweise Betriebsart mit eigener Schutz-, Trenn- und Dokumentationslogik.",[29,934,936],{"id":935},"von-der-zeichnung-zur-prüfbaren-inbetriebnahmeakte","Von der Zeichnung zur prüfbaren Inbetriebnahmeakte",[11,938,939],{},"Ordne jedem gezeichneten Grenzpunkt einen Nachweis zu: Typenschild oder Datenblatt für Leistungswerte, Herstellerplan für integrierte Schutzfunktionen, Messprotokoll für die ausgeführte Anlage und Konfigurationsauszug für relevante Leistungsgrenzen. Offene Annahmen kennzeichnest du ausdrücklich. Einen Differenzialschalter-Typ oder eine DC-Erkennung trägst du erst als vorhanden ein, wenn Gerät und Einbau das belegen.",[11,941,942],{},"Für die Abschlusskontrolle spielst du mehrere Energiezustände durch:",[130,944,945,948,951,954,957],{},[133,946,947],{},"nachts laden ohne PV-Erzeugung;",[133,949,950],{},"PV erzeugt bei geringem Gebäudeverbrauch;",[133,952,953],{},"PV und Fahrzeug laufen gleichzeitig an einer dynamischen Netzbegrenzung;",[133,955,956],{},"Kommunikation oder Messung des Lastmanagements fällt aus;",[133,958,959],{},"bei bidirektionaler Technik fließt Energie aus dem Fahrzeug zurück.",[11,961,962],{},"Für jeden Zustand müssen Strompfad, Begrenzung, Schutz und Fail-safe-Verhalten aus Herstellerkonzept und Planung nachvollziehbar sein. Das Eindrahtschema muss nicht jede Softwareentscheidung abbilden, zeigt aber jede mögliche Speiserichtung und jede elektrisch relevante Komponente.",[29,964,966],{"id":965},"netz-und-produktfreigabe-nicht-vermischen","Netz- und Produktfreigabe nicht vermischen",[11,968,969,970,370],{},"AREI-Dokumentation, Synergrid-Typgenehmigung und das Verfahren des zuständigen Verteilnetzbetreibers beantworten verschiedene Fragen. Ein sauber geplantes Schutzkonzept belegt keine C10\u002F26-Listung, und ein gelistetes Gerät belegt nicht die korrekte Installation im konkreten Gebäude. Für rein unidirektionale Ladegeräte stellt Synergrid aktuell klar, dass sie wegen C10\u002F11 ed.2.4 keine C10\u002F26-Homologation benötigen; andere technische oder netzbezogene Bedingungen können trotzdem gelten. Was du tust, wenn das Gerät nicht auf der Liste steht, steht in ",[37,971,973],{"href":972},"\u002Fde\u002Fblog\u002Fsynergrid-c10-26-liste-wechselrichter","Synergrid-Liste C10\u002F26",[11,975,976],{},"Halte deshalb Gerätetyp, Firmware, Uni- oder Bidirektionalität, Kommunikation mit dem Netzbetreiber und die tatsächlichen Inbetriebnahmeeinstellungen zusammen mit der Planrevision fest. So bleibt erkennbar, auf welchem technischen Stand eine Freigabe oder Kontrolle beruhte.",[11,978,979],{},"Beschrifte am Verteiler PV- und Ladeabgang mit denselben Referenzen wie im Plan. Bei möglicher Rückspeisung hängen die vorgeschriebenen Warnschilder an den tatsächlich betroffenen Stellen; eine Notiz in der App reicht nicht. Vergleiche vor der Übergabe Schild, Stromkreisreferenz, Gerätetyp und Energieflussrichtung mit der Endfassung des Schemas.",[29,981,983],{"id":982},"mit-planelec-arbeiten","Mit PlanElec arbeiten",[11,985,469,986,989],{},[37,987,473],{"href":988},"\u002Fde\u002F"," erfasst du PV- und Ladezweig im gemeinsamen Projektmodell: Strings je MPPT, Wechselrichter, AC-Trennstelle und Quellenschutz auf der einen Seite, die Wallbox mit eigenem Stromkreis auf der anderen. Eindrahtschema und Positionsplan entstehen aus denselben Daten und lassen sich als PDF exportieren. Die AREI\u002FRGIE-Selbstprüfung meldet unter anderem, wenn eine Wallbox keinen eigenen Stromkreis, keinen 30-mA-Differenzialschalter oder keinen passenden Schutz gegen Gleichfehlerströme hat, und zeigt fehlende String-Zuordnungen. Die Rollen sind klar verteilt: Die Selbstprüfung zeigt dir Befunde in den unterstützten Regeln; Schutzkoordination und Netzbetreiberfreigabe klärst du mit Auslegung und Netzbetreiber, die Abnahme macht die zugelassene Kontrollstelle.",[29,991,993],{"id":992},"amtliche-quellen","Amtliche Quellen",[183,995,996,1003],{},[133,997,998,1002],{},[37,999,1001],{"href":485,"rel":1000},[487],"AREI\u002FRGIE Buch 1 beim FÖD Wirtschaft",": Kapitel 7.22, 7.112 sowie Teile 3 und 9, geprüfter Stand V06.",[133,1004,1005,1010],{},[37,1006,1009],{"href":1007,"rel":1008},"https:\u002F\u002Fwww.synergrid.be\u002Ffr\u002Fhomologation\u002Felectricite\u002Funites-de-production-decentralisee",[487],"Synergrid: Homologation dezentraler Erzeugungseinheiten",": C10\u002F11 ed.2.4, C10\u002F26 und Abgrenzung bidirektionaler Ladeinfrastruktur.",[11,1012,1013],{},"Fachlicher Prüfstand: 05.10.2026. Netzanschlussbedingungen und Herstellerstände prüfst du vor der Ausführung aktuell beim zuständigen Netzbetreiber beziehungsweise Hersteller.",{"title":168,"searchDepth":502,"depth":502,"links":1015},[1016,1017,1018,1019,1020,1021,1022,1023,1024,1025,1026,1027,1028,1029,1030],{"id":566,"depth":502,"text":567},{"id":652,"depth":502,"text":653},{"id":682,"depth":502,"text":683},{"id":698,"depth":502,"text":699},{"id":735,"depth":502,"text":736},{"id":776,"depth":502,"text":777},{"id":807,"depth":502,"text":808},{"id":845,"depth":502,"text":846},{"id":855,"depth":502,"text":856},{"id":885,"depth":502,"text":886},{"id":922,"depth":502,"text":923},{"id":935,"depth":502,"text":936},{"id":965,"depth":502,"text":966},{"id":982,"depth":502,"text":983},{"id":992,"depth":502,"text":993},"So zeichnest du PV-Wechselrichter, Ladestation, getrennte Stromkreise, Schutzgeräte, Lastmanagement und mögliche Rückspeisung sauber in ein gemeinsames Eindrahtschema.","de",{},"\u002Fblog\u002Fpv-ev-charger-single-line-diagram.de",{"title":547,"description":1031},"pv-ladestation-eindrahtschema","blog\u002Fpv-ev-charger-single-line-diagram.de",[1039,1040,1041,1042,539,1043,1044],"Photovoltaik","Ladestation","Wallbox","Eindrahtschema","Lastmanagement","Belgien","UbXo2l96DeiBeil4cZ7qB_80oht2C8S-cwbBQpVKtdg",{"id":1047,"title":1048,"articleId":6,"body":1049,"category":519,"date":520,"description":1502,"extension":522,"image":24,"lastUpdated":523,"locale":1503,"meta":1504,"navigation":526,"ogImage":527,"path":1505,"publishDate":520,"readTime":529,"refreshInterval":530,"seo":1506,"seoTitle":1507,"slug":1508,"stem":1509,"tags":1510,"__hash__":1517},"blog\u002Fblog\u002Fpv-ev-charger-single-line-diagram.en.md","Combining Solar PV and an EV Charger on a Single-Line Diagram",{"type":8,"value":1050,"toc":1485},[1051,1057,1062,1065,1069,1077,1138,1151,1155,1158,1178,1181,1185,1188,1194,1197,1201,1204,1227,1233,1237,1240,1243,1266,1274,1278,1281,1298,1301,1305,1308,1315,1318,1335,1338,1342,1345,1348,1352,1355,1358,1378,1382,1389,1392,1396,1399,1402,1405,1409,1412,1415,1432,1435,1439,1446,1449,1452,1456,1462,1466,1482],[11,1052,1053,1056],{},[14,1054,1055],{},"On a single-line diagram, solar PV and an EV charger are two separate branches of the same distribution board."," The inverter feeds in on its AC side; a normal charger draws energy through its own final circuit. An energy manager measures and controls both, but never puts them in series. That is how you draw them: two outgoing ways, clear power-flow directions, protection in the right place and load management shown as control.",[11,1058,1059],{},[21,1060],{"alt":1061,"src":24},"An electrician checks a charger beside an electric car, with rooftop solar panels in the background.",[11,1063,1064],{},"A strong combined diagram shows sources, possible current directions, protection boundaries and measuring points. Anything only the design calculation, the manufacturer or the network operator can confirm, you document as evidence first and enter afterwards.",[29,1066,1068],{"id":1067},"continue-the-example-add-ev1-to-db1","Continue the example: add EV1 to DB1",[11,1070,1071,1072,1076],{},"In the shared fictional job from the ",[37,1073,1075],{"href":1074},"\u002Fen\u002Fblog\u002Fpv-system-diagram","PV guide",", S1 and S2 remain connected to DB1 through INV1. EV1 is a new unidirectional charging point at the parking space. Trace its branch to the actual connection in DB1; EV1 is not in series with INV1. The names explain the case without prescribing mandatory references.",[43,1078,1079,1092],{},[46,1080,1081],{},[49,1082,1083,1086,1089],{},[52,1084,1085],{},"Job addition",[52,1087,1088],{},"Evidence to check",[52,1090,1091],{},"Effect on the documents",[62,1093,1094,1105,1116,1127],{},[49,1095,1096,1099,1102],{},[67,1097,1098],{},"EV1 and supply cable",[67,1100,1101],{},"Manual, survey and sizing",[67,1103,1104],{},"Dedicated branch, cable and location",[49,1106,1107,1110,1113],{},[67,1108,1109],{},"Associated protection",[67,1111,1112],{},"Design and proof of integrated\u002Fexternal devices",[67,1114,1115],{},"Actual functions without double counting",[49,1117,1118,1121,1124],{},[67,1119,1120],{},"Metering or load control",[67,1122,1123],{},"Measuring point, phases and manufacturer setup",[67,1125,1126],{},"Control kept separate from power paths",[49,1128,1129,1132,1135],{},[67,1130,1131],{},"DB1 with PV and charger",[67,1133,1134],{},"Revised current and protection assessment",[67,1136,1137],{},"Shared board revision updated",[11,1139,1140,1141,1145,1146,1150],{},"The ",[37,1142,1144],{"href":1143},"\u002Fen\u002Fblog\u002Fsolar-pv-situation-plan","PV situation plan"," locates the same references. Use the ",[37,1147,1149],{"href":1148},"\u002Fen\u002Fhelp\u002Fplan-installation-and-distribution-boards","installation planning guide"," to review the entered electrical connections in the model. You prove conductor and equipment current capacity with sizing and datasheets, not with a value shown by load management.",[29,1152,1154],{"id":1153},"inventory-three-related-systems","Inventory three related systems",[11,1156,1157],{},"Separate these levels first:",[130,1159,1160,1166,1172],{},[133,1161,1162,1165],{},[14,1163,1164],{},"Grid and main distribution:"," connection, meter, main protection, earthing and relevant boards.",[133,1167,1168,1171],{},[14,1169,1170],{},"PV generation:"," modules or strings, DC components, inverter, AC protection and point of connection.",[133,1173,1174,1177],{},[14,1175,1176],{},"Charging load:"," dedicated circuit, overcurrent protection, residual current device (RCD), cable, connection point and any load control.",[11,1179,1180],{},"If the manufacturer specifies a different approved system concept, such as a bidirectional charger or an integrated hybrid unit, you draw exactly that topology. Model, firmware and system documentation then go into the dossier.",[29,1182,1184],{"id":1183},"a-typical-common-ac-topology","A typical common AC topology",[11,1186,1187],{},"A conventional installation looks like this in simplified form:",[162,1189,1192],{"className":1190,"code":1191,"language":167,"meta":168},[165],"Distribution grid ↔ meter ↔ main board\n                             ├─ PV AC branch ↔ AC protection ↔ inverter ↔ PV DC side\n                             └─ charging branch → protection → cable → charger → vehicle\n                                              └─ metering\u002Fload control, if installed\n",[170,1193,1191],{"__ignoreMap":168},[11,1195,1196],{},"The two-way arrow shows a possible energy direction; the protection details still sit at the device. A unidirectional wallbox is a load branch, and it stays one even when its software offers “solar surplus charging”. Do not draw it as a generator.",[29,1198,1200],{"id":1199},"document-the-pv-branch-completely","Document the PV branch completely",[11,1202,1203],{},"For household low-voltage PV installations up to 10 kVA, Chapter 7.112 of AREI Book 1 V06 adds specific measures to the general rules: marking of DC conductors and live AC conductors, warning signs (“Do not disconnect under load”, “Electrical installation always live”) and earthing of the module frames unless the manufacturer forbids it (Section 7.112.2). Make the installed chain traceable:",[183,1205,1206,1209,1212,1215,1218,1221,1224],{},[133,1207,1208],{},"PV generator and relevant string or module arrangement;",[133,1210,1211],{},"DC cables, polarity and cross-section;",[133,1213,1214],{},"DC isolation and protection when installed or integrated;",[133,1216,1217],{},"exact inverter model and maximum AC output;",[133,1219,1220],{},"AC cable, overcurrent protection, RCD and other designed protection;",[133,1222,1223],{},"precise connection point in the board;",[133,1225,1226],{},"associated warnings and identification.",[11,1228,1140,1229,1232],{},[37,1230,1231],{"href":1074},"PV system diagram guide"," covers this branch in more detail. Enter the manufacturer's actual data rather than a generic “PV protection” box.",[29,1234,1236],{"id":1235},"keep-the-charger-on-its-dedicated-circuit","Keep the charger on its dedicated circuit",[11,1238,1239],{},"AREI 7.22.3 requires a dedicated circuit for every connection point of a charging station, and connecting a charging station to the fixed installation through a plug and socket is prohibited. Where protection relies on automatic disconnection, 7.22.4.1 b requires each dedicated AC circuit to be protected individually by an RCD of no more than 30 mA. Protection must also keep working during insulation faults with a disturbing DC component: either through an RCD built for that purpose or through an RCD coordinated with a residual direct current detection device that takes the charger out of service. Under 7.22.4.2, each dedicated circuit also has its own overcurrent protection. These devices may sit in the board, in the charger or in a combination of both.",[11,1241,1242],{},"Show at least:",[183,1244,1245,1248,1251,1254,1257,1260,1263],{},[133,1246,1247],{},"circuit reference and phases;",[133,1249,1250],{},"overcurrent device, number of poles and rated current;",[133,1252,1253],{},"RCD type, rated residual current and any coordinated DC detection;",[133,1255,1256],{},"cable type, number of conductors and cross-section;",[133,1258,1259],{},"charger and number of connection points;",[133,1261,1262],{},"rated power or maximum charging current;",[133,1264,1265],{},"fixed control, metering or switching components.",[11,1267,1268,1269,1273],{},"If the charger is installed outdoors, 7.22.5.1 requires at least IP44 for the equipment. The acceptable combination follows from AREI, product standards and the exact manual together. ",[37,1270,1272],{"href":1271},"\u002Fen\u002Fblog\u002Frcd-type-a-vs-b","RCD Type A versus Type B"," gives you the background; approval of the specific charger comes from its documentation.",[29,1275,1277],{"id":1276},"put-energy-management-in-the-right-place","Put energy management in the right place",[11,1279,1280],{},"Solar surplus charging or import limitation needs measurement and control. A system can include an energy meter, current transformers, controller, data link and controllable charger. Place the electrically relevant fixed parts where they are actually connected:",[183,1282,1283,1286,1289,1292,1295],{},[133,1284,1285],{},"measuring point at the supply or relevant board;",[133,1287,1288],{},"current transformers with correct phase and direction;",[133,1290,1291],{},"controller supply;",[133,1293,1294],{},"contactor or control contact if it performs electrical switching or enabling;",[133,1296,1297],{},"data link only as far as needed to explain the function.",[11,1299,1300],{},"A dashed line separates communication from power conductors; define it in the legend. “100% solar” does not belong on the diagram: production, building load, vehicle demand and control strategy change constantly.",[29,1302,1304],{"id":1303},"phases-and-power-balance","Phases and power balance",[11,1306,1307],{},"Draw the real phase allocation of inverter and charger. A single-phase inverter and a three-phase charger do not become one branch because a meter nets their energy. A software current limit controls operation; cable sizing and overcurrent protection are still proven separately.",[11,1309,1140,1310,1314],{},[37,1311,1313],{"href":1312},"\u002Fen\u002Fblog\u002Fcable-cross-section-breaker","cable cross-section and breaker relationship"," is therefore established fully and separately for the PV and charging branches.",[11,1316,1317],{},"The design review checks, among other things:",[183,1319,1320,1323,1326,1329,1332],{},[133,1321,1322],{},"supply capacity and permissible phase loading;",[133,1324,1325],{},"simultaneous generation and demand;",[133,1327,1328],{},"busbar and upstream device loading for every possible current direction;",[133,1330,1331],{},"short-circuit, selectivity and voltage-drop conditions;",[133,1333,1334],{},"measuring ranges and manufacturer limits of the control system.",[11,1336,1337],{},"The diagram records the chosen result; it is not the calculation itself.",[29,1339,1341],{"id":1340},"treat-bidirectional-charging-separately","Treat bidirectional charging separately",[11,1343,1344],{},"If the charger can export energy from the vehicle to the installation or grid, it is no longer only a load. AREI 7.22.5.4 then requires compliance with the rules for distributed generation units – protection against electric shock, overcurrent protection and safety disconnection – and the warning “Caution: possible feedback of electrical energy into the installation” on the charger and on the boards that supply it. Synergrid states that bidirectional, or technically bidirectional-capable, charging infrastructure falls under C10\u002F11 and C10\u002F26 approval; purely unidirectional chargers do not.",[11,1346,1347],{},"Show directions, isolation and protection functions exactly according to the approved system concept. A normal wallbox diagram does not fit Vehicle-to-Home or Vehicle-to-Grid.",[29,1349,1351],{"id":1350},"situation-plan-and-dossier","Situation plan and dossier",[11,1353,1354],{},"Locate modules, inverter, relevant isolators, boards, fixed metering, charger and associated parking space. Repeat the circuit references from the single-line diagram. Datasheets, declarations, settings and later changes belong in the installation dossier.",[11,1356,1357],{},"Your final review confirms:",[183,1359,1360,1363,1366,1369,1372,1375],{},[133,1361,1362],{},"the diagram, board labels and as-built installation agree;",[133,1364,1365],{},"both branches can be traced to their common point;",[133,1367,1368],{},"every energy-flow arrow points the right way;",[133,1370,1371],{},"protection sits on the correct side without fictitious duplicates;",[133,1373,1374],{},"load management is shown as control, never as protection;",[133,1376,1377],{},"the charging function is clearly identified as unidirectional or bidirectional.",[29,1379,1381],{"id":1380},"carry-later-changes-through-the-whole-system","Carry later changes through the whole system",[11,1383,1384,1385,370],{},"Combined systems often change after first handover: a different inverter, more panels, a second charging connector, a home battery or a new metering method. Update more than the device name; follow every affected branch back to the common board. How to integrate a home battery as a source in the installation is covered in ",[37,1386,1388],{"href":1387},"\u002Fen\u002Fblog\u002Fhome-battery-arei","Home battery and AREI",[11,1390,1391],{},"Record the added source or point, new AC values and possible directions, revised protection, sensor position and phases, cables, board ways and labels. A software limit always travels with the device version and stored settings. A battery or bidirectional vehicle is not an invisible app feature: as soon as energy from another source can reach the fixed installation, source, isolation, protection and warnings are in the technical documentation. Archive the old drawing and identify the current revision unambiguously.",[29,1393,1395],{"id":1394},"worked-case-adding-a-second-charging-point-to-existing-pv","Worked case: adding a second charging point to existing PV",[11,1397,1398],{},"A building already has a PV inverter and a unidirectional wallbox; now a second connection point is added. Do not just copy the first symbol. Establish whether this is another device, one station with two connection points or a different manufacturer architecture, and where overcurrent protection and RCD actually sit. AREI 7.22.4.2 allows shared overcurrent protection for several connection points that are not used simultaneously, provided each point keeps the required protection – for example when the rated current of the shared device does not exceed the lowest rated current of the connection points. That exception covers overcurrent protection only; it does not cover shared RCDs or cables.",[11,1400,1401],{},"Then update supply capacity, phase allocation and load management. The points may share the available power dynamically, but the drawing still identifies each one, its real electrical subdivision and its maximum permitted load. Current sensors match the measured conductors and direction. You prove the as-built wiring with the survey and device documentation, not with a software screen showing two parking bays.",[11,1403,1404],{},"Review the PV branch as well. If only demand changes, modules and inverter stay the same, but the common board and possible current directions may need reassessment. Adding a hybrid inverter or battery at the same time introduces another source or operating mode with its own protection, isolation and documentation logic.",[29,1406,1408],{"id":1407},"build-an-evidence-chain-for-commissioning","Build an evidence chain for commissioning",[11,1410,1411],{},"Link every important boundary on the diagram to evidence: rating plate or datasheet for power values, manufacturer architecture for integrated protection, test records for the completed installation and a configuration export for relevant limits. Mark assumptions as open. An RCD type or DC detection is shown as installed only once device and installation confirm it.",[11,1413,1414],{},"During the final review, walk through several energy states:",[130,1416,1417,1420,1423,1426,1429],{},[133,1418,1419],{},"charging at night without PV generation;",[133,1421,1422],{},"PV generation with low building demand;",[133,1424,1425],{},"PV and vehicle against a dynamic import limit;",[133,1427,1428],{},"loss of load-management metering or communication;",[133,1430,1431],{},"for bidirectional equipment, energy returning from the vehicle.",[11,1433,1434],{},"For each state, path, limit, protection and fail-safe behaviour follow from the design and manufacturer concept. The single-line diagram does not show every software decision, but it shows every electrically relevant component and every possible source direction.",[29,1436,1438],{"id":1437},"keep-grid-and-product-approvals-distinct","Keep grid and product approvals distinct",[11,1440,1441,1442,370],{},"AREI documentation, Synergrid type approval and the distribution system operator's procedure answer different questions. A well-designed protection concept does not prove C10\u002F26 listing; a listed product does not prove correct installation in this building. Synergrid currently states that purely unidirectional chargers do not need C10\u002F26 approval because of C10\u002F11 ed.2.4; other technical or grid conditions may still apply. What to do if the device is not on the list is explained in ",[37,1443,1445],{"href":1444},"\u002Fen\u002Fblog\u002Fsynergrid-c10-26-list-inverter","Synergrid C10\u002F26 list",[11,1447,1448],{},"Keep model, firmware, uni- or bidirectional capability, network-operator correspondence and actual commissioning settings with the drawing revision. That shows which technical state an approval or inspection relied on.",[11,1450,1451],{},"Label the PV and charging ways in the board with the same references as the drawing. Where reverse power flow is possible, the required warning signs go on the locations actually affected; a note in the app is not enough. Before handover, compare every label, circuit reference, device type and energy direction with the final diagram.",[29,1453,1455],{"id":1454},"building-the-documents-in-planelec","Building the documents in PlanElec",[11,1457,469,1458,1461],{},[37,1459,473],{"href":1460},"\u002Fen\u002F",", you record the PV and charging branches in one project model: strings per MPPT, inverter, AC isolation point and source protection on one side, the wallbox on its own circuit on the other. The single-line diagram and situation plan come from the same data and export as PDFs. The AREI\u002FRGIE self-check flags, among other things, a wallbox without its own circuit, without a 30 mA RCD or without suitable protection against DC fault currents, and it shows unassigned strings. The roles are clear: the self-check shows you findings within the supported rules; protection coordination and grid permission are settled through your design and the network operator, and the official inspection is carried out by an approved inspection body.",[29,1463,1465],{"id":1464},"official-sources","Official sources",[183,1467,1468,1475],{},[133,1469,1470,1474],{},[37,1471,1473],{"href":485,"rel":1472},[487],"AREI\u002FRGIE Book 1 from the FPS Economy",": Chapters 7.22 and 7.112 and Parts 3 and 9, reviewed at V06.",[133,1476,1477,1481],{},[37,1478,1480],{"href":1007,"rel":1479},[487],"Synergrid: decentralised generation unit approval",": C10\u002F11 ed.2.4, C10\u002F26 and the distinction for bidirectional charging.",[11,1483,1484],{},"Technical review: 5 October 2026. Check current connection conditions with the network operator and manufacturer versions before execution.",{"title":168,"searchDepth":502,"depth":502,"links":1486},[1487,1488,1489,1490,1491,1492,1493,1494,1495,1496,1497,1498,1499,1500,1501],{"id":1067,"depth":502,"text":1068},{"id":1153,"depth":502,"text":1154},{"id":1183,"depth":502,"text":1184},{"id":1199,"depth":502,"text":1200},{"id":1235,"depth":502,"text":1236},{"id":1276,"depth":502,"text":1277},{"id":1303,"depth":502,"text":1304},{"id":1340,"depth":502,"text":1341},{"id":1350,"depth":502,"text":1351},{"id":1380,"depth":502,"text":1381},{"id":1394,"depth":502,"text":1395},{"id":1407,"depth":502,"text":1408},{"id":1437,"depth":502,"text":1438},{"id":1454,"depth":502,"text":1455},{"id":1464,"depth":502,"text":1465},"Draw the PV inverter, EV charger, dedicated circuits, protection, energy metering and possible reverse power flow correctly on one shared single-line diagram.","en",{},"\u002Fblog\u002Fpv-ev-charger-single-line-diagram.en",{"title":1048,"description":1502},"Solar PV and EV Charger on One Single-Line Diagram","solar-pv-ev-charger-single-line-diagram","blog\u002Fpv-ev-charger-single-line-diagram.en",[1511,1512,1513,539,1514,1515,1516],"Solar PV","EV charger","Single-line diagram","Load management","Reverse power flow","Belgium","Q3gfuSDr8QMNgvhqSXRsyNQ4sD9RxNUSCVSBm3XDjx4",{"id":1519,"title":1520,"articleId":6,"body":1521,"category":519,"date":520,"description":1977,"extension":522,"image":24,"lastUpdated":523,"locale":1978,"meta":1979,"navigation":526,"ogImage":527,"path":1980,"publishDate":520,"readTime":529,"refreshInterval":530,"seo":1981,"seoTitle":1982,"slug":1983,"stem":1984,"tags":1985,"__hash__":1993},"blog\u002Fblog\u002Fpv-ev-charger-single-line-diagram.fr.md","Combiner photovoltaïque et borne de recharge sur le schéma unifilaire",{"type":8,"value":1522,"toc":1960},[1523,1529,1534,1537,1541,1549,1610,1623,1627,1630,1650,1653,1657,1660,1666,1669,1673,1676,1699,1706,1710,1713,1716,1739,1747,1751,1754,1771,1774,1778,1781,1789,1792,1809,1812,1816,1819,1822,1826,1829,1832,1852,1856,1863,1866,1870,1873,1876,1879,1883,1886,1889,1906,1909,1913,1920,1923,1926,1930,1937,1941,1957],[11,1524,1525,1528],{},[14,1526,1527],{},"Sur le schéma unifilaire, l’installation photovoltaïque et la borne de recharge forment deux branches distinctes du même tableau."," L’onduleur injecte côté AC ; une borne classique consomme via son propre circuit terminal. Un gestionnaire d’énergie mesure et pilote les deux, sans les mettre en série. C’est ainsi que vous les dessinez : deux départs, des directions d’énergie claires, des protections au bon endroit et la gestion de charge représentée comme une commande.",[11,1530,1531],{},[21,1532],{"alt":1533,"src":24},"Un électricien vérifie une borne près d’une voiture électrique, avec des panneaux photovoltaïques en toiture à l’arrière-plan.",[11,1535,1536],{},"Un bon schéma commun montre les sources, les directions possibles, les limites de protection et les points de mesure. Ce que seuls le fabricant, le gestionnaire de réseau ou le dimensionnement réel peuvent confirmer, vous le documentez d’abord par une pièce justificative, puis vous l’inscrivez.",[29,1538,1540],{"id":1539},"poursuivre-la-mission-ajouter-ev1-à-db1","Poursuivre la mission : ajouter EV1 à DB1",[11,1542,1543,1544,1548],{},"Dans la mission fictive commune du ",[37,1545,1547],{"href":1546},"\u002Ffr\u002Fblog\u002Fpanneaux-solaires-schema","guide PV",", S1 et S2 restent reliées à DB1 via INV1. EV1 est un nouveau point de recharge unidirectionnel au stationnement. Tracez sa branche jusqu’au raccordement réel dans DB1 ; EV1 n’est pas en série avec INV1. Les noms illustrent le cas, sans imposer une désignation.",[43,1550,1551,1564],{},[46,1552,1553],{},[49,1554,1555,1558,1561],{},[52,1556,1557],{},"Complément à la mission",[52,1559,1560],{},"Pièce à vérifier",[52,1562,1563],{},"Effet sur les documents",[62,1565,1566,1577,1588,1599],{},[49,1567,1568,1571,1574],{},[67,1569,1570],{},"EV1 et canalisation",[67,1572,1573],{},"Notice, relevé et dimensionnement",[67,1575,1576],{},"Branche dédiée, câble et emplacement",[49,1578,1579,1582,1585],{},[67,1580,1581],{},"Protections associées",[67,1583,1584],{},"Étude et preuve des appareils intégrés\u002Fexternes",[67,1586,1587],{},"Fonctions réelles sans doublons",[49,1589,1590,1593,1596],{},[67,1591,1592],{},"Mesure ou gestion de charge",[67,1594,1595],{},"Point de mesure, phases et configuration fabricant",[67,1597,1598],{},"Commande distincte des chemins de puissance",[49,1600,1601,1604,1607],{},[67,1602,1603],{},"DB1 avec PV et borne",[67,1605,1606],{},"Analyse révisée des courants et protections",[67,1608,1609],{},"Mise à jour du tableau commun",[11,1611,1612,1613,1617,1618,1622],{},"Le ",[37,1614,1616],{"href":1615},"\u002Ffr\u002Fblog\u002Fphotovoltaique-plan-situation","plan de position PV"," localise les mêmes repères. Le ",[37,1619,1621],{"href":1620},"\u002Ffr\u002Fhelp\u002Fplanifier-installation-et-tableaux-secondaires","guide de planification"," vous permet d’examiner les connexions saisies dans le modèle. Le courant admissible des conducteurs et appareils se prouve par le dimensionnement et la fiche technique, pas par une valeur affichée par la gestion de charge.",[29,1624,1626],{"id":1625},"inventorier-trois-sous-ensembles","Inventorier trois sous-ensembles",[11,1628,1629],{},"Séparez d’abord :",[130,1631,1632,1638,1644],{},[133,1633,1634,1637],{},[14,1635,1636],{},"Réseau et distribution principale :"," raccordement, compteur, protection générale, terre et tableaux concernés.",[133,1639,1640,1643],{},[14,1641,1642],{},"Production PV :"," modules ou chaînes, partie DC, onduleur, protection AC et point d’injection.",[133,1645,1646,1649],{},[14,1647,1648],{},"Recharge :"," circuit dédié, protection contre les surintensités, dispositif différentiel, câble, point de connexion et éventuelle gestion de charge.",[11,1651,1652],{},"Si le fabricant impose une autre architecture autorisée, par exemple une borne bidirectionnelle ou un appareil hybride intégré, vous dessinez exactement celle-là. Les références de modèle et de version vont alors au dossier.",[29,1654,1656],{"id":1655},"architecture-ac-courante","Architecture AC courante",[11,1658,1659],{},"Une installation conventionnelle se lit ainsi :",[162,1661,1664],{"className":1662,"code":1663,"language":167,"meta":168},[165],"Réseau ↔ compteur ↔ tableau principal\n                    ├─ branche PV AC ↔ protection ↔ onduleur ↔ partie PV DC\n                    └─ branche recharge → protection → câble → borne → véhicule\n                                        └─ mesure\u002Fgestion de charge, si présente\n",[170,1665,1663],{"__ignoreMap":168},[11,1667,1668],{},"La double flèche indique une direction d’énergie possible ; la protection reste indiquée à l’appareil. Une borne unidirectionnelle demeure un récepteur, même si son logiciel propose la « recharge au surplus solaire ». Ne la dessinez pas comme une source.",[29,1670,1672],{"id":1671},"détailler-la-branche-photovoltaïque","Détailler la branche photovoltaïque",[11,1674,1675],{},"Pour les installations photovoltaïques domestiques à basse tension jusqu’à 10 kVA, le chapitre 7.112 du RGIE Livre 1 V06 complète les règles générales par des mesures spécifiques : repérage des conducteurs en courant continu et des conducteurs actifs en courant alternatif, panneaux d’avertissement (« Ne pas déconnecter en charge », « Installation électrique toujours sous tension ») et mise à la terre des cadres métalliques des modules, sauf interdiction du fabricant (section 7.112.2). Le schéma et le dossier permettent d’identifier :",[183,1677,1678,1681,1684,1687,1690,1693,1696],{},[133,1679,1680],{},"générateur PV et organisation utile des chaînes ou modules ;",[133,1682,1683],{},"canalisations DC, polarité et section ;",[133,1685,1686],{},"sectionnement et protections DC installés ou intégrés ;",[133,1688,1689],{},"modèle exact d’onduleur et puissance AC maximale ;",[133,1691,1692],{},"canalisation AC, protection contre les surintensités, différentiel et autres dispositifs prévus ;",[133,1694,1695],{},"point de raccordement précis au tableau ;",[133,1697,1698],{},"avertissements et identifications de l’installation réalisée.",[11,1700,1701,1702,1705],{},"Le guide ",[37,1703,1704],{"href":1546},"panneaux photovoltaïques sur le schéma"," développe cette branche. Inscrivez les données concrètes du fabricant plutôt qu’une case générique « protection PV ».",[29,1707,1709],{"id":1708},"prévoir-un-circuit-dédié-pour-la-borne","Prévoir un circuit dédié pour la borne",[11,1711,1712],{},"Le RGIE 7.22.3 impose un circuit dédié pour chaque point de connexion d’une borne de charge ; raccorder une borne à l’installation fixe au moyen d’une prise de courant est interdit. En protection active avec coupure automatique, le point 7.22.4.1 b exige que chaque circuit dédié en courant alternatif soit protégé individuellement par un différentiel de 30 mA au maximum. La protection doit en outre rester efficace en cas de défaut d’isolement avec composante continue perturbatrice : soit par un différentiel conçu à cet effet, soit par un différentiel coordonné avec un dispositif de détection de courant de défaut continu qui met la borne hors service. Selon 7.22.4.2, chaque circuit dédié dispose aussi de sa propre protection contre les surintensités. Ces dispositifs peuvent se trouver dans le tableau, dans la borne ou dans une combinaison des deux.",[11,1714,1715],{},"Indiquez donc au minimum :",[183,1717,1718,1721,1724,1727,1730,1733,1736],{},[133,1719,1720],{},"repère du circuit et phases utilisées ;",[133,1722,1723],{},"protection contre les surintensités, nombre de pôles et courant assigné ;",[133,1725,1726],{},"différentiel avec type, sensibilité et éventuelle détection DC coordonnée ;",[133,1728,1729],{},"type de câble, nombre de conducteurs et section ;",[133,1731,1732],{},"borne et nombre de points de connexion ;",[133,1734,1735],{},"puissance nominale ou courant maximal de recharge ;",[133,1737,1738],{},"équipements fixes de commande, mesure ou coupure.",[11,1740,1741,1742,1746],{},"Si la borne est installée à ciel ouvert, le point 7.22.5.1 exige pour le matériel un degré de protection d’au moins IP44. La combinaison acceptable découle à la fois du RGIE, des normes produit et de la notice de l’appareil. Le guide ",[37,1743,1745],{"href":1744},"\u002Ffr\u002Fblog\u002Fdifferentiel-type-a-vs-type-b","type A ou type B"," vous donne le contexte ; la validation du modèle concret vient de sa documentation.",[29,1748,1750],{"id":1749},"montrer-la-gestion-dénergie-à-sa-juste-place","Montrer la gestion d’énergie à sa juste place",[11,1752,1753],{},"La recharge au surplus PV ou la limitation du prélèvement nécessite une mesure et une régulation. Le système peut comporter compteur d’énergie, transformateurs de courant, contrôleur, communication et borne pilotable. Placez les éléments électriques fixes là où ils sont réellement raccordés :",[183,1755,1756,1759,1762,1765,1768],{},[133,1757,1758],{},"point de mesure au raccordement ou au tableau concerné ;",[133,1760,1761],{},"capteurs de courant avec phases et sens corrects ;",[133,1763,1764],{},"alimentation du contrôleur ;",[133,1766,1767],{},"contacteur ou contact de commande s’il réalise une coupure ou une autorisation électrique ;",[133,1769,1770],{},"liaison de données uniquement dans la mesure utile à la compréhension.",[11,1772,1773],{},"Une ligne pointillée distingue la communication des conducteurs de puissance ; définissez-la dans la légende. « 100 % solaire » n’a pas sa place sur le schéma : production, consommation du bâtiment, demande du véhicule et stratégie varient en permanence.",[29,1775,1777],{"id":1776},"phases-et-bilan-de-puissance","Phases et bilan de puissance",[11,1779,1780],{},"Représentez l’affectation réelle des phases. Un onduleur monophasé et une borne triphasée ne deviennent pas une même branche parce qu’un compteur effectue un bilan. Une limite configurée dans le logiciel pilote le fonctionnement ; le dimensionnement des conducteurs et la protection contre les surintensités se justifient séparément.",[11,1782,1783,1784,1788],{},"La ",[37,1785,1787],{"href":1786},"\u002Ffr\u002Fblog\u002Fsection-cable-disjoncteur","coordination entre section et disjoncteur"," s’établit donc complètement et séparément pour la branche PV et pour la branche recharge.",[11,1790,1791],{},"L’étude vérifie notamment :",[183,1793,1794,1797,1800,1803,1806],{},[133,1795,1796],{},"puissance de raccordement et charges admissibles par phase ;",[133,1798,1799],{},"production et consommation simultanées ;",[133,1801,1802],{},"courant dans les jeux de barres et appareils amont pour toutes les directions possibles ;",[133,1804,1805],{},"court-circuit, sélectivité et chute de tension ;",[133,1807,1808],{},"plages de mesure et limites constructeur de la régulation.",[11,1810,1811],{},"Le schéma consigne le résultat retenu, pas le calcul lui-même.",[29,1813,1815],{"id":1814},"identifier-clairement-la-recharge-bidirectionnelle","Identifier clairement la recharge bidirectionnelle",[11,1817,1818],{},"Si la borne peut réinjecter l’énergie du véhicule dans l’installation ou le réseau, elle n’est plus seulement réceptrice. Le RGIE 7.22.5.4 impose alors de répondre aux prescriptions des unités de production décentralisées – protection contre les chocs électriques, protection contre les surintensités et coupure de sécurité – et d’apposer l’avertissement « Attention : réinjection possible de l’énergie électrique dans l’installation » sur la borne et sur les tableaux qui l’alimentent. Synergrid précise qu’une infrastructure bidirectionnelle, ou techniquement capable de l’être, relève de C10\u002F11 et de l’homologation C10\u002F26 ; une borne strictement unidirectionnelle n’en relève pas.",[11,1820,1821],{},"Représentez directions, sectionnement et protections exactement selon le concept approuvé. Le schéma d’une wallbox classique ne convient pas pour le Vehicle-to-Home ou le Vehicle-to-Grid.",[29,1823,1825],{"id":1824},"plan-de-position-et-dossier","Plan de position et dossier",[11,1827,1828],{},"Localisez modules, onduleur, sectionneurs pertinents, tableaux, mesure fixe, borne et place de stationnement associée. Reprenez les repères de circuits de l’unifilaire. Fiches techniques, déclarations, paramètres et modifications vont au dossier de l’installation.",[11,1830,1831],{},"Votre revue finale vérifie :",[183,1833,1834,1837,1840,1843,1846,1849],{},[133,1835,1836],{},"concordance du schéma, des étiquettes et de l’as-built ;",[133,1838,1839],{},"continuité lisible des deux branches jusqu’au point commun ;",[133,1841,1842],{},"directions d’énergie correctes ;",[133,1844,1845],{},"protections placées du bon côté, sans doublons fictifs ;",[133,1847,1848],{},"gestion de charge représentée comme commande, jamais comme protection ;",[133,1850,1851],{},"fonction uni- ou bidirectionnelle clairement identifiée.",[29,1853,1855],{"id":1854},"répercuter-les-évolutions-ultérieures","Répercuter les évolutions ultérieures",[11,1857,1858,1859,370],{},"Ces systèmes évoluent souvent après la réception : nouvel onduleur, modules supplémentaires, second point de recharge, batterie ou nouvelle mesure. Ne changez pas seulement le nom d’un appareil ; retracez chaque branche jusqu’au tableau commun. La manière d’intégrer une batterie domestique comme source dans l’installation est décrite dans ",[37,1860,1862],{"href":1861},"\u002Ffr\u002Fblog\u002Fbatterie-domestique-rgie","Batterie domestique et RGIE",[11,1864,1865],{},"Consignez la source ou le point ajouté, la nouvelle valeur AC et les directions possibles, les protections révisées, la position et les phases des capteurs, les canalisations, les départs et les étiquettes. Une limite logicielle s’accompagne toujours de la version d’appareil et des paramètres conservés. Une batterie ou un véhicule bidirectionnel n’est pas une fonction invisible de l’application : dès qu’une autre source peut alimenter l’installation fixe, source, sectionnement, protection et avertissements figurent dans la documentation technique. Archivez l’ancien plan et identifiez clairement la révision en vigueur.",[29,1867,1869],{"id":1868},"exemple-ajouter-un-second-point-de-recharge-à-une-installation-pv","Exemple : ajouter un second point de recharge à une installation PV",[11,1871,1872],{},"Un bâtiment possède déjà un onduleur PV et une borne unidirectionnelle ; un second point de connexion s’ajoute. Ne copiez pas simplement le premier symbole. Déterminez s’il s’agit d’un autre appareil, d’une station à deux points ou d’une architecture différente, puis localisez la protection contre les surintensités et le différentiel réellement présents. Le RGIE 7.22.4.2 admet, pour plusieurs points de connexion non utilisés simultanément, une protection commune contre les surintensités, à condition qu’elle offre la protection requise pour chaque point – par exemple lorsque son courant assigné ne dépasse pas le plus faible courant assigné des points de connexion. Cette dérogation vise uniquement les surintensités ; elle ne couvre ni différentiels ni canalisations partagés.",[11,1874,1875],{},"Mettez ensuite à jour puissance de raccordement, affectation des phases et gestion de charge. Les points peuvent partager dynamiquement la puissance disponible, mais le dessin identifie toujours chacun d’eux, sa subdivision électrique réelle et la charge maximale autorisée. Les capteurs de courant correspondent aux bons conducteurs et au bon sens. Le câblage as-built se prouve par le relevé et la documentation de l’appareil, pas par une interface logicielle montrant deux places.",[11,1877,1878],{},"Réexaminez aussi la branche PV. Si seule la consommation évolue, modules et onduleur restent identiques, mais le tableau commun et les directions de courant peuvent demander une nouvelle étude. L’ajout simultané d’un onduleur hybride ou d’une batterie introduit une autre source ou un autre mode, avec sa propre logique de protection, de sectionnement et de documentation.",[29,1880,1882],{"id":1881},"constituer-les-preuves-de-mise-en-service","Constituer les preuves de mise en service",[11,1884,1885],{},"Associez chaque frontière importante du schéma à une preuve : plaque ou fiche pour les puissances, architecture fabricant pour les protections intégrées, relevés d’essai pour l’installation exécutée et export de configuration pour les limites pertinentes. Marquez les hypothèses comme ouvertes. Un type de différentiel ou une détection DC n’est indiqué comme installé qu’une fois l’appareil et son montage vérifiés.",[11,1887,1888],{},"Lors de la revue finale, parcourez plusieurs états d’énergie :",[130,1890,1891,1894,1897,1900,1903],{},[133,1892,1893],{},"recharge nocturne sans production PV ;",[133,1895,1896],{},"production PV avec faible consommation du bâtiment ;",[133,1898,1899],{},"PV et véhicule face à une limite dynamique d’importation ;",[133,1901,1902],{},"perte de mesure ou de communication du gestionnaire de charge ;",[133,1904,1905],{},"pour un appareil bidirectionnel, retour d’énergie du véhicule.",[11,1907,1908],{},"Pour chaque état, chemin, limite, protection et comportement de repli s’expliquent par la conception et le système fabricant. L’unifilaire ne reproduit pas chaque décision logicielle, mais il montre chaque composant électrique pertinent et chaque direction possible d’une source.",[29,1910,1912],{"id":1911},"distinguer-homologation-produit-et-procédure-réseau","Distinguer homologation produit et procédure réseau",[11,1914,1915,1916,370],{},"Documentation RGIE, homologation Synergrid et procédure du gestionnaire de réseau de distribution répondent à des questions différentes. Une protection correctement étudiée ne prouve pas l’inscription C10\u002F26 ; un produit homologué ne prouve pas son installation correcte dans ce bâtiment. Synergrid précise actuellement qu’une borne strictement unidirectionnelle ne requiert pas l’homologation C10\u002F26 au titre de C10\u002F11 éd.2.4 ; d’autres conditions techniques ou réseau peuvent subsister. Que faire si l’appareil ne figure pas sur la liste, vous le lisez dans ",[37,1917,1919],{"href":1918},"\u002Ffr\u002Fblog\u002Fliste-synergrid-c10-26-onduleur","Liste Synergrid C10\u002F26",[11,1921,1922],{},"Conservez modèle, firmware, capacité uni- ou bidirectionnelle, échanges avec le gestionnaire et réglages réels avec l’indice du plan. Le dossier montre ainsi l’état technique auquel un contrôle ou une autorisation se rapportait.",[11,1924,1925],{},"Au tableau, étiquetez les départs PV et recharge avec les mêmes repères que sur le plan. En cas de réinjection possible, les avertissements requis sont apposés aux endroits réellement concernés ; une mention dans l’application ne suffit pas. Avant la remise, comparez étiquette, repère de circuit, type d’appareil et direction d’énergie avec la version finale du schéma.",[29,1927,1929],{"id":1928},"réaliser-les-documents-dans-planelec","Réaliser les documents dans PlanElec",[11,1931,1932,1933,1936],{},"Dans ",[37,1934,473],{"href":1935},"\u002Ffr\u002F",", vous saisissez les branches PV et recharge dans un seul modèle de projet : chaînes par MPPT, onduleur, point de sectionnement AC et protection de source d’un côté, borne sur circuit dédié de l’autre. Schéma unifilaire et plan de position naissent des mêmes données et s’exportent en PDF. L’autocontrôle RGIE signale notamment une borne sans circuit dédié, sans différentiel de 30 mA ou sans protection adaptée contre les courants de défaut continus, ainsi que les chaînes non affectées. Les rôles sont clairs : l’autocontrôle vous montre les constats dans les règles prises en charge ; coordination des protections et accord réseau relèvent de l’étude et du gestionnaire de réseau, et le contrôle officiel revient à l’organisme agréé.",[29,1938,1940],{"id":1939},"sources-officielles","Sources officielles",[183,1942,1943,1950],{},[133,1944,1945,1949],{},[37,1946,1948],{"href":485,"rel":1947},[487],"RGIE Livre 1 publié par le SPF Économie"," : chapitres 7.22 et 7.112, parties 3 et 9, version V06 examinée.",[133,1951,1952,1956],{},[37,1953,1955],{"href":1007,"rel":1954},[487],"Synergrid : homologation des unités de production décentralisée"," : C10\u002F11 éd.2.4, C10\u002F26 et distinction de la recharge bidirectionnelle.",[11,1958,1959],{},"Revue de fond au 5 octobre 2026. Vérifiez avant exécution les conditions de raccordement actuelles auprès du gestionnaire de réseau et les versions constructeur.",{"title":168,"searchDepth":502,"depth":502,"links":1961},[1962,1963,1964,1965,1966,1967,1968,1969,1970,1971,1972,1973,1974,1975,1976],{"id":1539,"depth":502,"text":1540},{"id":1625,"depth":502,"text":1626},{"id":1655,"depth":502,"text":1656},{"id":1671,"depth":502,"text":1672},{"id":1708,"depth":502,"text":1709},{"id":1749,"depth":502,"text":1750},{"id":1776,"depth":502,"text":1777},{"id":1814,"depth":502,"text":1815},{"id":1824,"depth":502,"text":1825},{"id":1854,"depth":502,"text":1855},{"id":1868,"depth":502,"text":1869},{"id":1881,"depth":502,"text":1882},{"id":1911,"depth":502,"text":1912},{"id":1928,"depth":502,"text":1929},{"id":1939,"depth":502,"text":1940},"Représentez onduleur PV, borne, circuits dédiés, protections, mesure d’énergie et réinjection possible correctement dans un schéma unifilaire commun.","fr",{},"\u002Fblog\u002Fpv-ev-charger-single-line-diagram.fr",{"title":1520,"description":1977},"Photovoltaïque et borne de recharge sur le schéma unifilaire","photovoltaique-borne-recharge-schema-unifilaire","blog\u002Fpv-ev-charger-single-line-diagram.fr",[1986,1987,1988,1989,1990,1991,1992],"Photovoltaïque","Borne de recharge","Schéma unifilaire","RGIE","Gestion de puissance","Réinjection","Belgique","YxH_CgLxpZlG3TzKHWqzLWCtH25_yba6vEKoiLhVals",{"id":4,"title":5,"articleId":6,"body":1995,"category":519,"date":520,"description":521,"extension":522,"image":24,"lastUpdated":523,"locale":524,"meta":2319,"navigation":526,"ogImage":527,"path":528,"publishDate":520,"readTime":529,"refreshInterval":530,"seo":2320,"seoTitle":532,"slug":533,"stem":534,"tags":2321,"__hash__":543},{"type":8,"value":1996,"toc":2302},[1997,2001,2005,2007,2009,2013,2059,2065,2067,2069,2083,2085,2087,2089,2094,2096,2098,2100,2116,2120,2122,2124,2126,2142,2146,2148,2150,2162,2164,2166,2168,2172,2174,2186,2188,2190,2192,2194,2196,2198,2200,2214,2216,2220,2222,2236,2238,2240,2242,2244,2246,2248,2250,2252,2254,2266,2268,2270,2274,2276,2278,2280,2282,2286,2288,2300],[11,1998,1999,17],{},[14,2000,16],{},[11,2002,2003],{},[21,2004],{"alt":23,"src":24},[11,2006,27],{},[29,2008,32],{"id":31},[11,2010,35,2011,41],{},[37,2012,40],{"href":39},[43,2014,2015,2025],{},[46,2016,2017],{},[49,2018,2019,2021,2023],{},[52,2020,54],{},[52,2022,57],{},[52,2024,60],{},[62,2026,2027,2035,2043,2051],{},[49,2028,2029,2031,2033],{},[67,2030,69],{},[67,2032,72],{},[67,2034,75],{},[49,2036,2037,2039,2041],{},[67,2038,80],{},[67,2040,83],{},[67,2042,86],{},[49,2044,2045,2047,2049],{},[67,2046,91],{},[67,2048,94],{},[67,2050,97],{},[49,2052,2053,2055,2057],{},[67,2054,102],{},[67,2056,105],{},[67,2058,108],{},[11,2060,111,2061,116,2063,121],{},[37,2062,115],{"href":114},[37,2064,120],{"href":119},[29,2066,125],{"id":124},[11,2068,128],{},[130,2070,2071,2075,2079],{},[133,2072,2073,138],{},[14,2074,137],{},[133,2076,2077,144],{},[14,2078,143],{},[133,2080,2081,150],{},[14,2082,149],{},[11,2084,153],{},[29,2086,157],{"id":156},[11,2088,160],{},[162,2090,2092],{"className":2091,"code":166,"language":167,"meta":168},[165],[170,2093,166],{"__ignoreMap":168},[11,2095,174],{},[29,2097,178],{"id":177},[11,2099,181],{},[183,2101,2102,2104,2106,2108,2110,2112,2114],{},[133,2103,187],{},[133,2105,190],{},[133,2107,193],{},[133,2109,196],{},[133,2111,199],{},[133,2113,202],{},[133,2115,205],{},[11,2117,208,2118,212],{},[37,2119,211],{"href":39},[29,2121,216],{"id":215},[11,2123,219],{},[11,2125,222],{},[183,2127,2128,2130,2132,2134,2136,2138,2140],{},[133,2129,227],{},[133,2131,230],{},[133,2133,233],{},[133,2135,236],{},[133,2137,239],{},[133,2139,242],{},[133,2141,245],{},[11,2143,248,2144,253],{},[37,2145,252],{"href":251},[29,2147,257],{"id":256},[11,2149,260],{},[183,2151,2152,2154,2156,2158,2160],{},[133,2153,265],{},[133,2155,268],{},[133,2157,271],{},[133,2159,274],{},[133,2161,277],{},[11,2163,280],{},[29,2165,284],{"id":283},[11,2167,287],{},[11,2169,290,2170,295],{},[37,2171,294],{"href":293},[11,2173,298],{},[183,2175,2176,2178,2180,2182,2184],{},[133,2177,303],{},[133,2179,306],{},[133,2181,309],{},[133,2183,312],{},[133,2185,315],{},[11,2187,318],{},[29,2189,322],{"id":321},[11,2191,325],{},[11,2193,328],{},[29,2195,332],{"id":331},[11,2197,335],{},[11,2199,338],{},[183,2201,2202,2204,2206,2208,2210,2212],{},[133,2203,343],{},[133,2205,346],{},[133,2207,349],{},[133,2209,352],{},[133,2211,355],{},[133,2213,358],{},[29,2215,362],{"id":361},[11,2217,365,2218,370],{},[37,2219,369],{"href":368},[11,2221,373],{},[183,2223,2224,2226,2228,2230,2232,2234],{},[133,2225,378],{},[133,2227,381],{},[133,2229,384],{},[133,2231,387],{},[133,2233,390],{},[133,2235,393],{},[11,2237,396],{},[11,2239,399],{},[29,2241,403],{"id":402},[11,2243,406],{},[11,2245,409],{},[11,2247,412],{},[29,2249,416],{"id":415},[11,2251,419],{},[11,2253,422],{},[130,2255,2256,2258,2260,2262,2264],{},[133,2257,427],{},[133,2259,430],{},[133,2261,433],{},[133,2263,436],{},[133,2265,439],{},[11,2267,442],{},[29,2269,446],{"id":445},[11,2271,449,2272,370],{},[37,2273,453],{"href":452},[11,2275,456],{},[11,2277,459],{},[11,2279,462],{},[29,2281,466],{"id":465},[11,2283,469,2284,474],{},[37,2285,473],{"href":472},[29,2287,478],{"id":477},[183,2289,2290,2295],{},[133,2291,2292,489],{},[37,2293,488],{"href":485,"rel":2294},[487],[133,2296,2297,497],{},[37,2298,496],{"href":494,"rel":2299},[487],[11,2301,500],{},{"title":168,"searchDepth":502,"depth":502,"links":2303},[2304,2305,2306,2307,2308,2309,2310,2311,2312,2313,2314,2315,2316,2317,2318],{"id":31,"depth":502,"text":32},{"id":124,"depth":502,"text":125},{"id":156,"depth":502,"text":157},{"id":177,"depth":502,"text":178},{"id":215,"depth":502,"text":216},{"id":256,"depth":502,"text":257},{"id":283,"depth":502,"text":284},{"id":321,"depth":502,"text":322},{"id":331,"depth":502,"text":332},{"id":361,"depth":502,"text":362},{"id":402,"depth":502,"text":403},{"id":415,"depth":502,"text":416},{"id":445,"depth":502,"text":446},{"id":465,"depth":502,"text":466},{"id":477,"depth":502,"text":478},{},{"title":5,"description":521},[536,537,538,539,540,541,542],[2323,2328,2332],{"articleId":2324,"locale":524,"slug":2325,"title":2326,"date":2327,"publishDate":2327},"pv-system-documentation","zonnepanelen-schema","Zonnepanelen op het eendraadschema: documentatie voor installateurs","2026-04-21",{"articleId":2329,"locale":524,"slug":2330,"title":2331,"date":520,"publishDate":520},"pv-situation-plan","zonnepanelen-situatieschema","Zonnepanelen op het situatieplan: modules, omvormer en kabeltraject",{"articleId":2333,"locale":524,"slug":2334,"title":2335,"date":2336,"publishDate":2336},"cable-cross-section-breaker","kabeldoorsnede-automaat","Kabeldoorsnede per automaat: welke kabel bij welke zekering?","2026-03-18"]