[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"blog-post-nl-eendraadschema-nieuwbouw-checklist":3,"blog-alternates-blog-post-nl-eendraadschema-nieuwbouw-checklist-new-build-single-line-checklist":679,"blog-next-steps-blog-post-nl-eendraadschema-nieuwbouw-checklist-new-build-single-line-checklist":3028},{"id":4,"title":5,"articleId":6,"body":7,"category":655,"date":656,"description":657,"extension":658,"image":30,"lastUpdated":659,"locale":660,"meta":661,"navigation":456,"ogImage":662,"path":663,"publishDate":656,"readTime":664,"refreshInterval":665,"seo":666,"seoTitle":667,"slug":668,"stem":669,"tags":670,"__hash__":678},"blog\u002Fblog\u002Fnew-build-single-line-checklist.nl.md","Eendraadschema voor nieuwbouw: AREI-checklist tot aan de keuring","new-build-single-line-checklist",{"type":8,"value":9,"toc":633},"minimark",[10,15,24,31,34,38,151,155,158,177,180,183,187,190,213,216,220,223,243,246,250,253,256,276,279,283,286,289,309,317,321,324,327,347,350,354,357,360,363,367,374,377,395,398,402,405,408,428,431,435,438,441,445,525,529,532,535,539,542,545,549,552,569,573,576,579,583,621,627],[11,12,14],"h2",{"id":13},"wat-moet-een-eendraadschema-voor-nieuwbouw-bevatten","Wat moet een eendraadschema voor nieuwbouw bevatten?",[16,17,18,19,23],"p",{},"Een eendraadschema voor een Belgische nieuwbouw toont de ",[20,21,22],"strong",{},"werkelijk uitgevoerde"," installatie: een hoofding met nummer, versie, datum, adres en verantwoordelijke, spanning en aard van de stroom, elk verdeelbord, alle differentieel- en overstroombeveiligingen met hun kenmerken, type, doorsnede, aantal geleiders en plaatsingswijze van de leidingen, schakelaars, dozen, contactdozen, lichtpunten, vaste toestellen en bronnen. Het situatieplan toont dezelfde elementen met dezelfde referentie op hun plaats. De basis is AREI\u002FRGIE Boek 1 versie 06, van toepassing sinds 1 april 2026, vooral afdeling 3.1.2.",[16,25,26],{},[27,28],"img",{"alt":29,"src":30},"Elektriciens controleren de installatie in een nieuwbouwwoning.","\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fplanelec-new-build-single-line-checklist-editorial.webp",[16,32,33],{},"Eendraadschema en situatieplan worden opgesteld door de verantwoordelijke van de uitvoering van het werk (onderafdeling 3.1.2.1 a). Vóór de gelijkvormigheidscontrole kloppen ze met de werkelijke toestand, niet met het eerste ontwerp. Deze checklist brengt je daar in tien stappen. Ze behandelt het gebruikelijke AC-systeem; geaarde DC-systemen, die versie 06 nieuw regelt, zijn een apart vakgebied waarvoor je AC-geleiderrollen en -symbolen niet zomaar overneemt.",[11,35,37],{"id":36},"verplichte-gegevens-in-één-oogopslag","Verplichte gegevens in één oogopslag",[39,40,41,57],"table",{},[42,43,44],"thead",{},[45,46,47,51,54],"tr",{},[48,49,50],"th",{},"Gegeven",[48,52,53],{},"Waar gevraagd",[48,55,56],{},"Document",[58,59,60,72,82,91,101,111,121,130,140],"tbody",{},[45,61,62,66,69],{},[63,64,65],"td",{},"Nummer, versie en versiedatum",[63,67,68],{},"afdeling 3.1.2",[63,70,71],{},"eendraadschema en situatieplan",[45,73,74,77,80],{},[63,75,76],{},"Naam, hoedanigheid en btw-nummer van de verantwoordelijke",[63,78,79],{},"onderafdeling 3.1.2.1 a",[63,81,71],{},[45,83,84,87,89],{},[63,85,86],{},"Adres van de installatie",[63,88,79],{},[63,90,71],{},[45,92,93,96,98],{},[63,94,95],{},"Spanning en aard van de stroom",[63,97,79],{},[63,99,100],{},"eendraadschema",[45,102,103,106,108],{},[63,104,105],{},"Hoofdletter per elementaire stroombaan, volgnummer per punt",[63,107,79],{},[63,109,110],{},"eendraadschema, referentie op situatieplan",[45,112,113,116,119],{},[63,114,115],{},"Type, doorsnede, aantal geleiders en plaatsingswijze van de leidingen",[63,117,118],{},"onderafdeling 3.1.2.2 a",[63,120,100],{},[45,122,123,126,128],{},[63,124,125],{},"Type en kenmerken van differentieel- en overstroombeveiligingen",[63,127,118],{},[63,129,100],{},[45,131,132,135,138],{},[63,133,134],{},"Schakelaars, verbindings- en aftakdozen, contactdozen, lichtpunten, vaste toestellen, bronnen",[63,136,137],{},"onderafdelingen 3.1.2.2 a en 3.1.2.3 a",[63,139,71],{},[45,141,142,145,148],{},[63,143,144],{},"Symbolen volgens tabel 2.23 of een eenduidige legende",[63,146,147],{},"hoofdstuk 2.13, onderafdeling 3.1.2.1 a",[63,149,150],{},"beide documenten",[11,152,154],{"id":153},"_1-leg-hoofding-en-verantwoordelijkheid-vast","1. Leg hoofding en verantwoordelijkheid vast",[16,156,157],{},"Geef de documentenset een eenduidige identiteit voor je de eerste kring tekent:",[159,160,161,165,168,171,174],"ul",{},[162,163,164],"li",{},"documentnummer, versie en versiedatum;",[162,166,167],{},"adres van de installatie;",[162,169,170],{},"naam en hoedanigheid van de verantwoordelijke van de uitvoering, btw-nummer indien van toepassing;",[162,172,173],{},"velden voor datum en handtekeningen;",[162,175,176],{},"spanning en aard van de stroom op het eendraadschema.",[16,178,179],{},"Eendraadschema en situatieplan dragen dezelfde versie. Een bestandsnaam volstaat niet, want afdrukken en samengevoegde pdf's verliezen hem. Ook de exportdatum is niet de datum waarop de installatie werd opgenomen.",[16,181,182],{},"Handtekening en visum van het erkend organisme komen pas in de controleprocedure, wanneer de installatie conform is (onderafdeling 3.1.2.1 a). Een werkversie bevat dus geen vooraf ingevulde goedkeuring en geen vermelding “AREI-conform”.",[11,184,186],{"id":185},"_2-leg-de-voeding-vast","2. Leg de voeding vast",[16,188,189],{},"Het schema begint bij de echte voeding, niet bij een sjabloon. Noteer:",[159,191,192,195,198,201,204,207,210],{},[162,193,194],{},"een- of driefasige voeding;",[162,196,197],{},"nominale spanning en aard van de stroom;",[162,199,200],{},"nul- en beschermingsgeleider;",[162,202,203],{},"aansluiting en meteropstelling;",[162,205,206],{},"kaliber van de aansluitbeveiliging en de hoofdlastscheider;",[162,208,209],{},"netvorm en aardingsconcept, voor zover ontwerp en bescherming ze nodig hebben;",[162,211,212],{},"bijkomende bronnen zoals een PV-omvormer of transformator.",[16,214,215],{},"Of een aansluiting een 3×400 V-net met nulgeleider of een 3×230 V-net is, zie je aan geen enkel stopcontact. Een verkeerde aanname werkt door in poolaantal, nulgeleider, bedrading van de differentieelschakelaars en verbruikers. Vergelijk daarom aansluitcontract, bordopbouw en meting; bij twijfel bevestigt de netbeheerder de aansluitgegevens.",[11,217,219],{"id":218},"_3-neem-elk-verdeelbord-op-als-deel-van-de-beveiligingsketen","3. Neem elk verdeelbord op als deel van de beveiligingsketen",[16,221,222],{},"Teken hoofd- en onderverdeelborden met hun voeding en koppeling. Het pad van het voedingspunt tot elke eindstroombaan is volledig traceerbaar. Afhankelijk van de installatie hoort daarbij:",[159,224,225,228,231,234,237,240],{},[162,226,227],{},"hoofdschakelaar en voorgeschakelde beveiliging;",[162,229,230],{},"differentieelschakelaars met type, aanspreekstroom, nominale stroom en relevante karakteristiek;",[162,232,233],{},"smeltveiligheden of automaten met kaliber en curve;",[162,235,236],{},"rails, koppelingen en onderverdelingen die de structuur verklaren;",[162,238,239],{},"reserveautomaten als reserve, zonder verzonnen kabel of verbruiker;",[162,241,242],{},"een eenduidige naam voor elk bord en vertrek.",[16,244,245],{},"De reeks 300 mA en 30 mA bewijst op zich geen selectiviteit. Golfvormtype, verhoogde immuniteit en tijdvertraging zijn afzonderlijke eigenschappen. Kortsluitvoorwaarden, uitschakeltijden en coördinatie volgens de fabrikant horen bij het technische ontwerp.",[11,247,249],{"id":248},"_4-geef-elke-eindstroombaan-een-vaste-referentie","4. Geef elke eindstroombaan een vaste referentie",[16,251,252],{},"Elke elementaire stroombaan krijgt een hoofdletter. Lichtpunten, contactdozen en bedieningstoestellen nummer je in de volgorde waarin ze vanaf de voorgeschakelde overstroombeveiliging in de kring voorkomen (onderafdeling 3.1.2.1 a). Dezelfde code staat op het bordetiket.",[16,254,255],{},"Per vertrek beantwoordt de opname:",[159,257,258,261,264,267,270,273],{},[162,259,260],{},"Welk gebruik en welke verbruikers horen erbij?",[162,262,263],{},"Is het een licht-, stopcontact-, gemengde of toegewezen toestelkring?",[162,265,266],{},"Welke vaste toestellen zijn aangesloten?",[162,268,269],{},"Zijn er verbindings- of aftakdozen?",[162,271,272],{},"Welke differentieelschakelaar beveiligt de kring?",[162,274,275],{},"Kloppen schema, bordetiket en situatieplan?",[16,277,278],{},"“Keuken” is geen bruikbare naam wanneer verlichting, werkstopcontacten, vaatwasser en kookplaat elk een eigen kring hebben. Namen helpen bij de oriëntatie; eenduidig is pas de elektrische referentie.",[11,280,282],{"id":281},"_5-vermeld-alle-leidinggegevens","5. Vermeld alle leidinggegevens",[16,284,285],{},"Onderafdeling 3.1.2.2 a vraagt type, doorsnede, aantal geleiders en plaatsingswijze. Leg die vast per leidingdeel. Na een aftak- of verbindingsdoos kunnen kabel of plaatsingswijze veranderen; één kabeltekst aan het begin van de kring verbergt dat.",[16,287,288],{},"Het ontwerp achter het schema gaat verder. Controleer afzonderlijk:",[159,290,291,294,297,300,303,306],{},[162,292,293],{},"bedrijfsstroom, kaliber van de beveiliging en stroombelastbaarheid;",[162,295,296],{},"plaatsingswijze, groepering, omgevingstemperatuur en isolatie;",[162,298,299],{},"leidinglengte en spanningsval;",[162,301,302],{},"kortsluit- en foutlusvoorwaarden;",[162,304,305],{},"minimumdoorsneden en bijzondere kringregels;",[162,307,308],{},"de vermelde beschermingsgeleider tegenover de werkelijk geplaatste leiding.",[16,310,311,312,316],{},"Tabel 4.11 geeft voor huishoudelijke installaties het hoogste kaliber van smeltveiligheid of automaat per doorsnede, bijvoorbeeld een automaat van 20 A voor 2,5 mm². Dat is een bovengrens, geen volledige kabelberekening. Een keurig label ",[313,314,315],"code",{},"XVB 3G2,5"," is waardeloos als op de werf een andere leiding ligt.",[11,318,320],{"id":319},"_6-neem-verbruikers-dozen-en-bediening-op","6. Neem verbruikers, dozen en bediening op",[16,322,323],{},"Het eendraadschema bevat schakelaars, verbindings- en aftakdozen, contactdozen, lichtpunten en vaste machines en toestellen (onderafdeling 3.1.2.2 a). Gebruik de symbolen van tabel 2.23. Ontbreekt daar een teken, dan definieer je een eenduidig symbool in de legende.",[16,325,326],{},"Maak zichtbaar wat technisch telt:",[159,328,329,332,335,338,341,344],{},[162,330,331],{},"enkelvoudige of meervoudige contactdoos;",[162,333,334],{},"contactdoos met aardingscontact, geschakelde of bijzondere contactdoos;",[162,336,337],{},"lichtpunt en werkelijke schakelfunctie;",[162,339,340],{},"drukknop, relais, bewegingsmelder of domoticasturing;",[162,342,343],{},"vast aangesloten toestel of gewone stopcontactlast;",[162,345,346],{},"verbindingsdoos of aftakdoos.",[16,348,349],{},"Een algemeen toestelsymbool met duidelijke tekst is beter dan een verzonnen pictogram. Functie, referentie en aansluiting tellen.",[11,351,353],{"id":352},"_7-teken-bronnen-en-bijzondere-delen","7. Teken bronnen en bijzondere delen",[16,355,356],{},"PV-installatie, omvormer, batterij, generator en transformator horen in de elektrische structuur van het eendraadschema; het situatieplan toont hun plaats. Voor een huishoudelijke laagspannings-PV-installatie bevat het dossier bovendien bedienings- en onderhoudsinstructies, veiligheidsinstructies en de technische referenties en kenmerken van het geïnstalleerde materieel, zoals merk, model en vermogen (afdeling 9.1.2).",[16,358,359],{},"Een PV-pijl bij het hoofdbord beschrijft aansluitpunt noch beveiligingsketen. Teken welke bron kan injecteren, waar ze koppelt en welke componenten ertussen zitten. Of een batterij naar het net kan terugleveren, haal je uit de fabrikantgegevens in plaats van te gokken.",[16,361,362],{},"Zijn er veiligheids- of kritische installaties, dan komen er een lijst en een plan van die installaties bij; hun bronnen, kringen en verbruikers zijn op het eendraadschema duidelijk geïdentificeerd (onderafdeling 3.1.2.1 a).",[11,364,366],{"id":365},"_8-houd-het-situatieplan-synchroon","8. Houd het situatieplan synchroon",[16,368,369,370,373],{},"Elk bord, elke doos, contactdoos, lamp, bediening, elk vast toestel en elke bron van het eendraadschema staat op het situatieplan op zijn plaats (onderafdeling 3.1.2.3 a). De referentie ",[313,371,372],{},"C3"," betekent in beide documenten hetzelfde element. Schakelaars dragen de letter van hun kring en het nummer van het punt dat ze bedienen.",[16,375,376],{},"Controleer in beide richtingen:",[378,379,380,383,386,389,392],"ol",{},[162,381,382],{},"elk element van het schema op het situatieplan terugvinden;",[162,384,385],{},"elk plansymbool op het eendraadschema terugvinden;",[162,387,388],{},"letter en nummer vergelijken;",[162,390,391],{},"verdieping, ruimte en bordtoewijzing nakijken;",[162,393,394],{},"verborgen dozen en buitenelementen meenemen.",[16,396,397],{},"Onbekende kabelroutes teken je niet. Het situatieplan toont de ligging van de vereiste componenten; extra kabel- of aardingsplannen maak je alleen met betrouwbare gegevens.",[11,399,401],{"id":400},"_9-leg-de-werkelijke-toestand-vast-vóór-de-keuring","9. Leg de werkelijke toestand vast vóór de keuring",[16,403,404],{},"Vóór ingebruikname ondergaat de nieuwe installatie de gelijkvormigheidscontrole (hoofdstuk 6.4). Het erkend organisme meet de aardingsweerstand en het isolatieniveau en bevestigt in het verslag dat differentieelschakelaars en aardingsweerstand, en overstroombeveiligingen en leidingdelen op elkaar afgestemd zijn, en dat de installatie volgens eendraadschema en situatieplan is uitgevoerd. Het controleert ook de continuïteit van beschermings- en equipotentiale verbindingen (onderafdeling 6.4.6.4).",[16,406,407],{},"Zoek daarom vlak voor de afspraak naar echte afwijkingen, niet naar tikfouten:",[159,409,410,413,416,419,422,425],{},[162,411,412],{},"Werd een andere automaat of differentieelschakelaar geplaatst?",[162,414,415],{},"Is een kabeldoorsnede of leidingtype gewijzigd?",[162,417,418],{},"Kwam er een contactdoos, lamp of doos bij?",[162,420,421],{},"Werd een kring naar een andere differentieelschakelaar verhuisd?",[162,423,424],{},"Kloppen bordetiketten en referenties?",[162,426,427],{},"Horen alle bladen bij dezelfde versie?",[16,429,430],{},"Pas installatie en documenten samen aan. Een technische fout los je op, je retoucheert hem niet weg.",[11,432,434],{"id":433},"_10-organiseer-dossier-en-latere-wijzigingen","10. Organiseer dossier en latere wijzigingen",[16,436,437],{},"Het dossier van een huishoudelijke installatie bevat eendraadschema, situatieplan, de verslagen van de gelijkvormigheidscontrole, eventueel bewijsstukken over het materieel en later de documenten bij wijzigingen. De eigenaar bewaart het dossier in twee exemplaren en geeft het door aan een nieuwe eigenaar (afdeling 9.1.2).",[16,439,440],{},"Na de keuring houd je het schema bij. Belangrijke wijzigingen of uitbreidingen vragen aangepaste schema's en plannen; bij een niet-belangrijke wijziging volstaat een gedateerde en ondertekende bondige beschrijving, en het situatieplan toont altijd de actuele toestand (onderafdeling 3.1.2.1 a). Bewaar de gekeurde versie en elke latere versie traceerbaar.",[11,442,444],{"id":443},"eindcheck","Eindcheck",[159,446,449,459,465,471,477,483,489,495,501,507,513,519],{"className":447},[448],"contains-task-list",[162,450,453,458],{"className":451},[452],"task-list-item",[454,455],"input",{"disabled":456,"type":457},true,"checkbox"," documentnummer, versie, datum, adres en verantwoordelijke volledig",[162,460,462,464],{"className":461},[452],[454,463],{"disabled":456,"type":457}," spanning, aard van de stroom en werkelijke aansluiting vermeld",[162,466,468,470],{"className":467},[452],[454,469],{"disabled":456,"type":457}," alle borden en bronnen opgenomen",[162,472,474,476],{"className":473},[452],[454,475],{"disabled":456,"type":457}," differentieel- en overstroombeveiliging met kenmerken vermeld",[162,478,480,482],{"className":479},[452],[454,481],{"disabled":456,"type":457}," elke eindstroombaan eenduidig aangeduid",[162,484,486,488],{"className":485},[452],[454,487],{"disabled":456,"type":457}," kabeltype, doorsnede, aantal geleiders en plaatsingswijze volledig",[162,490,492,494],{"className":491},[452],[454,493],{"disabled":456,"type":457}," contactdozen, lichtpunten, dozen, schakelaars en vaste toestellen aanwezig",[162,496,498,500],{"className":497},[452],[454,499],{"disabled":456,"type":457}," symbolen volgens tabel 2.23 of eenduidig in de legende",[162,502,504,506],{"className":503},[452],[454,505],{"disabled":456,"type":457}," referenties gelijk aan bord en situatieplan",[162,508,510,512],{"className":509},[452],[454,511],{"disabled":456,"type":457}," werfwijzigingen in beide documenten verwerkt",[162,514,516,518],{"className":515},[452],[454,517],{"disabled":456,"type":457}," bijkomende stukken voor PV, veiligheids- of bijzondere installaties toegevoegd",[162,520,522,524],{"className":521},[452],[454,523],{"disabled":456,"type":457}," ontwerpberekeningen en metingen buiten het schema afgerond",[11,526,528],{"id":527},"ontwerp-werf-en-ingebruikname-afstemmen","Ontwerp, werf en ingebruikname afstemmen",[16,530,531],{},"Een nieuwbouw verandert bijna altijd tussen offerte en ingebruikname. Houd daarom een open afwijkingenlijst bij: geplande referentie, uitgevoerde aanpassing, wie besliste, betrokken plannen en ontbrekend bewijs. Typisch zijn een verplaatst bord, een extra buitenstopcontact, een ander vermogen van de warmtepomp of een later toegevoegde PV-omvormer. Pas als elke regel afgehandeld of uitdrukkelijk als niet uitgevoerd gemarkeerd is, wordt het ontwerpschema een as-built schema.",[16,533,534],{},"Loop daarna met etiketten en meetdocumenten door de installatie. Schakel kringen niet op basis van veronderstelde ruimtenamen. Vergelijk de markering in het bord met de referentie op het schema en het punt op het situatieplan. Veranderen geleiders, beveiligingen of instellingen tijdens de ingebruikname, dan werk je de documentatie bij; een vroege pdf-export is geen eindversie.",[11,536,538],{"id":537},"voorbeeld-een-nieuwe-eindstroombaan-voor-de-droogkast","Voorbeeld: een nieuwe eindstroombaan voor de droogkast",[16,540,541],{},"Voor een vast aangesloten droogkast volstaat “wasplaats” niet. Het dossier toont uit welk bord en achter welke beveiligingen de kring vertrekt, welke referentie hij draagt, welke leiding met hoeveel geleiders en welke doorsnede er ligt en welk toestel aan het einde hangt. Wasmachine, droogkast en vaatwasser krijgen elk een eigen kring (onderafdeling 5.2.1.2) en hangen achter een differentieelschakelaar met hoge of zeer hoge gevoeligheid (onderafdeling 4.2.4.3 b). Op het situatieplan staat dezelfde referentie op de werkelijke aansluitplaats. Handleiding, toestelwaarden en instellingen bewaar je als technische documentatie.",[16,543,544],{},"Controleer daarna de raakvlakken: is het traject van de beschermingsgeleider traceerbaar? Komt de aansluitwijze overeen met de tekening? Werd een aparte voeding op de werf toch een gedeelde leiding? Ontbreekt er een aftakdoos op het schema? Die vragen voorkomen dat formeel volledige bladen een verouderde ontwerpstaat tonen.",[11,546,548],{"id":547},"een-beheerste-documentenset-overdragen","Een beheerste documentenset overdragen",[16,550,551],{},"Benoem de einduitgave eenduidig met project, adres, revisie en exportdatum. Bundel eendraadschema, situatieplan, keuringsverslag en technische documenten in een geordend dossier. Werkversies en vervangen revisies markeer je apart als historiek. Zo weet de eigenaar welke bestanden actueel zijn en dat latere wijzigingen opnieuw gedocumenteerd worden.",[16,553,554,555,562,563,568],{},"De ",[556,557,561],"a",{"href":558,"rel":559},"https:\u002F\u002Feconomie.fgov.be\u002Ffr\u002Fthemes\u002Fenergie\u002Fsources-et-vecteurs-denergie\u002Felectricite\u002Fsecurite-et-controle-des\u002Fcontrole-des-installations",[560],"nofollow","officiële FOD-pagina over de controle van huishoudelijke installaties"," noemt de minimaal voor te leggen plannen en vat hun inhoud samen. De gedetailleerde bepalingen staan in ",[556,564,567],{"href":565,"rel":566},"https:\u002F\u002Feconomie.fgov.be\u002Fnl\u002Fpublicaties\u002Falgemeen-reglement-op-de",[560],"AREI Boek 1, versie 06",".",[11,570,572],{"id":571},"voorbereiden-met-planelec","Voorbereiden met PlanElec",[16,574,575],{},"PlanElec beheert grondplan, elektrische topologie en bordgegevens in één project. Eendraadschema en situatieplan ontstaan uit hetzelfde model, dragen dezelfde referenties en gaan de deur uit als pdf of als samengesteld installatiedossier met voorblad en documentenlijst. De AREI\u002FRGIE-zelfcontrole toetst de ondersteunde regels aan je projectgegevens en toont open punten voordat de keurder ze vindt.",[16,577,578],{},"De rollen zijn duidelijk verdeeld: PlanElec structureert en controleert de documentatie. Aansluitcontrole, kabelberekening, werfopname en metingen blijven het werk van de vakmensen ter plaatse, en de officiële gelijkvormigheidscontrole doet het erkend organisme.",[11,580,582],{"id":581},"verder-lezen","Verder lezen",[159,584,585,591,597,603,609,615],{},[162,586,587],{},[556,588,590],{"href":589},"\u002Fblog\u002Feendraadschema-vs-situatieschema","Eendraadschema en situatieplan samen gebruiken",[162,592,593],{},[556,594,596],{"href":595},"\u002Fblog\u002Farei-elektrische-symbolen-overzicht","AREI-symbolen uitgelegd",[162,598,599],{},[556,600,602],{"href":601},"\u002Fblog\u002Felektrische-keuring","Elektrische keuring voorbereiden",[162,604,605],{},[556,606,608],{"href":607},"\u002Fblog\u002Fhoofdschakelaar-verplicht-arei","Is een hoofdschakelaar verplicht volgens het AREI?",[162,610,611],{},[556,612,614],{"href":613},"\u002Fblog\u002Fmateriaallijst-elektrische-installatie","Materiaallijst van een elektrische installatie opstellen",[162,616,617],{},[556,618,620],{"href":619},"\u002Fblog\u002Frookmelder-verplicht-belgie","Rookmelder verplicht in België: de regels per gewest",[16,622,623],{},[556,624,626],{"href":625},"\u002F","Start een nieuwbouwproject in PlanElec →",[16,628,629],{},[630,631,632],"em",{},"Regelbasis: AREI Boek 1 V06, vooral hoofdstuk 2.13, afdeling 3.1.2, tabel 4.11, onderafdeling 4.2.4.3, onderafdeling 5.2.1.2, hoofdstuk 6.4 en afdeling 9.1.2. De officiële tekst en de uitgevoerde installatie zijn doorslaggevend.",{"title":634,"searchDepth":635,"depth":635,"links":636},"",2,[637,638,639,640,641,642,643,644,645,646,647,648,649,650,651,652,653,654],{"id":13,"depth":635,"text":14},{"id":36,"depth":635,"text":37},{"id":153,"depth":635,"text":154},{"id":185,"depth":635,"text":186},{"id":218,"depth":635,"text":219},{"id":248,"depth":635,"text":249},{"id":281,"depth":635,"text":282},{"id":319,"depth":635,"text":320},{"id":352,"depth":635,"text":353},{"id":365,"depth":635,"text":366},{"id":400,"depth":635,"text":401},{"id":433,"depth":635,"text":434},{"id":443,"depth":635,"text":444},{"id":527,"depth":635,"text":528},{"id":537,"depth":635,"text":538},{"id":547,"depth":635,"text":548},{"id":571,"depth":635,"text":572},{"id":581,"depth":635,"text":582},"tutorial","2026-08-29","Wat een eendraadschema voor nieuwbouw moet bevatten: hoofding, voeding, beveiligingen, leidingen, verbruikers, bronnen en de afstemming met het situatieplan volgens AREI Boek 1 V06.","md","2026-10-05","nl",{},"\u002Fimages\u002Fblog\u002Feditorial-2026-10-13\u002Fshare\u002Fplanelec-new-build-single-line-checklist-editorial.jpg","\u002Fblog\u002Fnew-build-single-line-checklist.nl","11 min",12,{"title":5,"description":657},"Eendraadschema nieuwbouw: AREI-checklist tot keuring","eendraadschema-nieuwbouw-checklist","blog\u002Fnew-build-single-line-checklist.nl",[671,672,673,100,674,675,676,677],"AREI","RGIE","nieuwbouw","checklist","situatieplan","gelijkvormigheidscontrole","België","niCXggFt7k_2JLjFYtruJ7cASTpBsqskc85vmM_ljzk",[680,1316,1950,2583],{"id":681,"title":682,"articleId":6,"body":683,"category":655,"date":656,"description":1301,"extension":658,"image":30,"lastUpdated":659,"locale":1302,"meta":1303,"navigation":456,"ogImage":662,"path":1304,"publishDate":656,"readTime":664,"refreshInterval":665,"seo":1305,"seoTitle":1306,"slug":1307,"stem":1308,"tags":1309,"__hash__":1315},"blog\u002Fblog\u002Fnew-build-single-line-checklist.de.md","Eindrahtschema im Neubau: AREI-Checkliste bis zur Abnahme",{"type":8,"value":684,"toc":1281},[685,689,696,701,704,708,815,819,822,839,842,845,849,852,875,878,882,885,905,908,912,915,918,938,941,945,948,951,971,977,981,984,987,1007,1010,1014,1017,1020,1023,1027,1033,1036,1053,1056,1060,1063,1066,1086,1089,1093,1096,1099,1103,1178,1182,1185,1188,1192,1195,1198,1202,1205,1218,1222,1225,1228,1232,1270,1276],[11,686,688],{"id":687},"was-muss-ein-eindrahtschema-im-neubau-enthalten","Was muss ein Eindrahtschema im Neubau enthalten?",[16,690,691,692,695],{},"Ein Eindrahtschema für einen belgischen Neubau zeigt die ",[20,693,694],{},"tatsächlich ausgeführte"," Anlage: Kopfangaben mit Nummer, Fassung, Datum, Adresse und Verantwortlichem, Spannung und Stromart, jeden Verteiler, alle Differenzial- und Überstromschutzgeräte mit ihren Eigenschaften, Leitungstyp, Querschnitt, Leiterzahl und Verlegeart, Schalter, Dosen, Steckdosen, Lichtpunkte, ortsfeste Geräte und Quellen. Der Positionsplan zeigt dieselben Elemente mit derselben Referenz an ihrem Ort. Grundlage ist AREI\u002FRGIE Buch 1 Version 06, anwendbar seit dem 1. April 2026, vor allem Abschnitt 3.1.2.",[16,697,698],{},[27,699],{"alt":700,"src":30},"Elektrofachkräfte prüfen die Installation in einem Neubau.",[16,702,703],{},"Erstellt werden Eindrahtschema und Positionsplan vom Verantwortlichen für die Ausführung der Arbeit (Unterabschnitt 3.1.2.1 Buchstabe a). Vor der Konformitätsprüfung stimmen sie mit dem Ist-Zustand überein, nicht mit dem ersten Entwurf. Diese Checkliste führt dich in zehn Schritten dorthin. Sie behandelt den üblichen Wechselstromfall; geerdete Gleichstromsysteme, die Version 06 neu regelt, sind ein eigener Fachbereich, für den du AC-Rollen und -Symbole nicht einfach übernimmst.",[11,705,707],{"id":706},"pflichtangaben-auf-einen-blick","Pflichtangaben auf einen Blick",[39,709,710,723],{},[42,711,712],{},[45,713,714,717,720],{},[48,715,716],{},"Angabe",[48,718,719],{},"Wo verlangt",[48,721,722],{},"Dokument",[58,724,725,736,746,755,765,775,785,794,804],{},[45,726,727,730,733],{},[63,728,729],{},"Nummer, Fassung und Datum der Fassung",[63,731,732],{},"Abschnitt 3.1.2",[63,734,735],{},"Eindrahtschema und Positionsplan",[45,737,738,741,744],{},[63,739,740],{},"Name, Eigenschaft, MwSt.-Nummer des Verantwortlichen",[63,742,743],{},"Unterabschnitt 3.1.2.1 a",[63,745,735],{},[45,747,748,751,753],{},[63,749,750],{},"Adresse der Anlage",[63,752,743],{},[63,754,735],{},[45,756,757,760,762],{},[63,758,759],{},"Spannung und Stromart",[63,761,743],{},[63,763,764],{},"Eindrahtschema",[45,766,767,770,772],{},[63,768,769],{},"Großbuchstabe je Elementarstromkreis, laufende Nummer je Punkt",[63,771,743],{},[63,773,774],{},"Eindrahtschema, Referenz im Positionsplan",[45,776,777,780,783],{},[63,778,779],{},"Leitungstyp, Querschnitt, Anzahl Leiter, Verlegeart",[63,781,782],{},"Unterabschnitt 3.1.2.2 a",[63,784,764],{},[45,786,787,790,792],{},[63,788,789],{},"Typ und Eigenschaften der Differenzial- und Überstromschutzgeräte",[63,791,782],{},[63,793,764],{},[45,795,796,799,802],{},[63,797,798],{},"Schalter, Verbindungs- und Abzweigdosen, Steckdosen, Lichtpunkte, ortsfeste Geräte, Quellen",[63,800,801],{},"Unterabschnitte 3.1.2.2 a und 3.1.2.3 a",[63,803,735],{},[45,805,806,809,812],{},[63,807,808],{},"Symbole nach Tabelle 2.23 oder eindeutige Legende",[63,810,811],{},"Kapitel 2.13, Unterabschnitt 3.1.2.1 a",[63,813,814],{},"beide Dokumente",[11,816,818],{"id":817},"_1-dokumentkopf-und-verantwortung-festlegen","1. Dokumentkopf und Verantwortung festlegen",[16,820,821],{},"Gib dem Dokumentensatz eine eindeutige Identität, bevor du den ersten Stromkreis zeichnest:",[159,823,824,827,830,833,836],{},[162,825,826],{},"Nummer des Dokuments, Fassung und Datum dieser Fassung;",[162,828,829],{},"Adresse der Installation;",[162,831,832],{},"Name und Eigenschaft des Verantwortlichen für die Ausführung, Mehrwertsteuernummer falls anwendbar;",[162,834,835],{},"Felder für Datum und Unterschriften;",[162,837,838],{},"Spannung und Stromart auf dem Eindrahtschema.",[16,840,841],{},"Eindrahtschema und Positionsplan tragen dieselbe Fassung. Der Dateiname reicht dafür nicht, denn Ausdrucke und zusammengeführte PDFs verlieren ihn. Auch das Exportdatum ist nicht das Datum, an dem die Anlage aufgenommen wurde.",[16,843,844],{},"Unterschrift und Visum der zugelassenen Stelle kommen erst im Kontrollverfahren dazu, wenn die Anlage konform ist (Unterabschnitt 3.1.2.1 Buchstabe a). Ein Arbeitsstand enthält deshalb weder eine vorweggenommene Freigabe noch den Vermerk „AREI-konform“.",[11,846,848],{"id":847},"_2-versorgung-und-anschlussdaten-klären","2. Versorgung und Anschlussdaten klären",[16,850,851],{},"Das Schema beginnt bei der realen Versorgung, nicht bei einer Vorlage. Halte fest:",[159,853,854,857,860,863,866,869,872],{},[162,855,856],{},"ein- oder dreiphasige Versorgung;",[162,858,859],{},"Nennspannung und Stromart;",[162,861,862],{},"Neutral- und Schutzleiter;",[162,864,865],{},"Anschluss- und Zähleranordnung;",[162,867,868],{},"Nennwert des Anschlussschutzes und Haupt-Lasttrennschalter;",[162,870,871],{},"Netzform und Erdungskonzept, soweit Planung und Schutz sie brauchen;",[162,873,874],{},"weitere Quellen wie PV-Wechselrichter oder Transformator.",[16,876,877],{},"Ob ein Anschluss ein 3×400-V-Netz mit Neutralleiter oder ein 3×230-V-Netz ist, siehst du an keiner Steckdose. Eine falsche Annahme wirkt sich auf Polzahl, Neutralleiter, Verdrahtung der Differenzialschalter und Verbraucher aus. Gleiche deshalb Anschlussvertrag, Verteileraufbau und Messung miteinander ab; im Zweifel klärt der Netzbetreiber die Anschlussdaten.",[11,879,881],{"id":880},"_3-jeden-verteiler-als-teil-der-schutzkette-erfassen","3. Jeden Verteiler als Teil der Schutzkette erfassen",[16,883,884],{},"Nimm Haupt- und Unterverteiler mit ihrer Einspeisung und Verbindung auf. Der Pfad vom Speisepunkt bis zu jedem Endstromkreis ist lückenlos nachvollziehbar. Dazu gehören je nach Anlage:",[159,886,887,890,893,896,899,902],{},[162,888,889],{},"Hauptschalter und vorgeschaltete Schutzorgane;",[162,891,892],{},"Differenzialschalter mit Typ, Bemessungsdifferenzstrom, Bemessungsstrom und relevanter Charakteristik;",[162,894,895],{},"Sicherungen oder Leitungsschutzschalter mit Nennstrom und Kennlinie;",[162,897,898],{},"Sammelschienen, Verbindungen und Unterverteiler, soweit sie die Struktur erklären;",[162,900,901],{},"Reserveschalter als Reserve, ohne erfundenes Kabel oder erfundenen Verbraucher;",[162,903,904],{},"eine eindeutige Bezeichnung für jeden Verteiler und Abgang.",[16,906,907],{},"Die Folge 300 mA und 30 mA belegt allein keine Selektivität. Wellenformtyp, erhöhte Störfestigkeit und Zeitverzögerung sind getrennte Eigenschaften. Kurzschlussbedingungen, Abschaltzeiten und die Koordination nach Herstellerangaben gehören in die fachliche Auslegung.",[11,909,911],{"id":910},"_4-endstromkreise-eindeutig-benennen","4. Endstromkreise eindeutig benennen",[16,913,914],{},"Jeder Elementarstromkreis erhält einen Großbuchstaben. Lichtpunkte, Steckdosen und Steuerwerke nummerierst du in der Reihenfolge, in der sie ab dem vorgeschalteten Überstromschutz im Stromkreis vorkommen (Unterabschnitt 3.1.2.1 Buchstabe a). Dieselbe Bezeichnung steht am Verteiler.",[16,916,917],{},"Für jeden Abgang beantwortet die Aufnahme:",[159,919,920,923,926,929,932,935],{},[162,921,922],{},"Welche Nutzung und welche Verbraucher gehören dazu?",[162,924,925],{},"Ist es ein Licht-, Steckdosen-, Misch- oder eigener Gerätestromkreis?",[162,927,928],{},"Welche ortsfesten Geräte sind angeschlossen?",[162,930,931],{},"Gibt es Verbindungs- oder Abzweigdosen?",[162,933,934],{},"Welcher Differenzialschalter schützt den Kreis?",[162,936,937],{},"Stimmen Schema, Verteileretikett und Positionsplan überein?",[16,939,940],{},"„Küche“ reicht als Bezeichnung nicht, wenn Beleuchtung, Arbeitssteckdosen, Geschirrspüler und Kochfeld getrennt versorgt werden. Namen helfen bei der Orientierung; eindeutig ist erst die elektrische Referenz.",[11,942,944],{"id":943},"_5-leitungsdaten-vollständig-angeben","5. Leitungsdaten vollständig angeben",[16,946,947],{},"Unterabschnitt 3.1.2.2 Buchstabe a verlangt Typ, Querschnitt, Anzahl Leiter und Verlegeart. Erfasse diese Daten je Leitungsabschnitt. Hinter einer Abzweig- oder Verbindungsdose können Kabel oder Verlegeart wechseln; ein einziger Kabeltext am Anfang des Stromkreises verdeckt solche Unterschiede.",[16,949,950],{},"Die Auslegung dahinter reicht weiter als das Schema. Prüfe getrennt:",[159,952,953,956,959,962,965,968],{},[162,954,955],{},"Betriebsstrom, Nennstrom des Schutzorgans und Strombelastbarkeit;",[162,957,958],{},"Verlegeart, Häufung, Umgebungstemperatur und Wärmedämmung;",[162,960,961],{},"Leitungslänge und Spannungsfall;",[162,963,964],{},"Kurzschluss- und Fehlerschleifenbedingungen;",[162,966,967],{},"Mindestquerschnitte und besondere Stromkreisregeln;",[162,969,970],{},"Schutzleiterangabe gegen die tatsächlich verlegte Leitung.",[16,972,973,974,976],{},"Tabelle 4.11 nennt für hauswirtschaftliche Anlagen den höchsten Nennstrom von Sicherung oder Leitungsschutzschalter je Leiterquerschnitt, etwa 20 A Leitungsschutzschalter für 2,5 mm². Sie ist eine Obergrenze, keine vollständige Kabelberechnung. Ein sauberer Text wie ",[313,975,315],{}," ist wertlos, wenn auf der Baustelle eine andere Leitung liegt.",[11,978,980],{"id":979},"_6-verbraucher-dosen-und-steuerungen-aufnehmen","6. Verbraucher, Dosen und Steuerungen aufnehmen",[16,982,983],{},"Das Eindrahtschema enthält Schalter, Verbindungs- und Abzweigdosen, Steckdosen, Lichtpunkte sowie ortsfeste Maschinen und Geräte (Unterabschnitt 3.1.2.2 Buchstabe a). Verwende die Symbole aus Tabelle 2.23. Fehlt dort ein Zeichen, definierst du ein eindeutiges Symbol in der Legende.",[16,985,986],{},"Mach sichtbar, was fachlich zählt:",[159,988,989,992,995,998,1001,1004],{},[162,990,991],{},"Einzel- und Mehrfachsteckdose;",[162,993,994],{},"Steckdose mit Schutzkontakt, geschaltete oder spezielle Steckdose;",[162,996,997],{},"Lichtpunkt und tatsächliche Schaltfunktion;",[162,999,1000],{},"Taster, Relais, Bewegungsmelder oder Domotiksteuerung;",[162,1002,1003],{},"fest angeschlossenes Gerät oder gewöhnliche Steckdosenlast;",[162,1005,1006],{},"Verbindungsdose oder Abzweigdose.",[16,1008,1009],{},"Ein allgemeines Geräte-Rechteck mit klarer Beschriftung ist besser als ein erfundenes Piktogramm. Es zählen Funktion, Referenz und Anschluss.",[11,1011,1013],{"id":1012},"_7-quellen-und-besondere-anlagenteile-einzeichnen","7. Quellen und besondere Anlagenteile einzeichnen",[16,1015,1016],{},"PV-Anlage, Wechselrichter, Batterie, Generator und Transformator gehören in die elektrische Struktur des Eindrahtschemas; der Positionsplan zeigt ihre Lage. Bei einer hauswirtschaftlichen Niederspannungs-PV-Anlage umfasst die Anlagenakte zusätzlich Betriebsanleitungen, Sicherheitshinweise sowie technische Referenzen und Eigenschaften der installierten Betriebsmittel wie Marke, Modell und Leistung (Abschnitt 9.1.2).",[16,1018,1019],{},"Ein PV-Pfeil am Hauptverteiler beschreibt weder Anschlussstelle noch Schutzkette. Zeichne, welche Quelle einspeisen kann, wo sie koppelt und welche Komponenten dazwischen liegen. Ob eine Batterie ins Netz zurückspeisen kann, klärst du mit den Herstellerunterlagen statt zu raten.",[16,1021,1022],{},"Gibt es Sicherheits- oder kritische Anlagen, kommen eine Liste und ein Plan dieser Anlagen hinzu; ihre Quellen, Stromkreise und Verbraucher sind auf dem Eindrahtschema eindeutig gekennzeichnet (Unterabschnitt 3.1.2.1 Buchstabe a).",[11,1024,1026],{"id":1025},"_8-positionsplan-synchron-halten","8. Positionsplan synchron halten",[16,1028,1029,1030,1032],{},"Jeder Verteiler, jede Dose, Steckdose, Leuchte, Steuerung, jedes ortsfeste Gerät und jede Quelle aus dem Eindrahtschema erscheint im Positionsplan an seiner Position (Unterabschnitt 3.1.2.3 Buchstabe a). Die Referenz ",[313,1031,372],{}," meint in beiden Dokumenten dasselbe Element. Schalter tragen den Buchstaben ihres Stromkreises und die Nummer des Punktes, den sie steuern.",[16,1034,1035],{},"Gleiche in beide Richtungen ab:",[378,1037,1038,1041,1044,1047,1050],{},[162,1039,1040],{},"jedes Schemaelement im Positionsplan suchen;",[162,1042,1043],{},"jedes Plansymbol im Eindrahtschema suchen;",[162,1045,1046],{},"Buchstabe und Nummer vergleichen;",[162,1048,1049],{},"Geschoss, Raum und Verteilerzuordnung prüfen;",[162,1051,1052],{},"verdeckte Dosen und Außenbereiche mitnehmen.",[16,1054,1055],{},"Unbekannte Kabelwege zeichnest du nicht. Der Positionsplan zeigt die Lage der geforderten Komponenten; zusätzliche Kabel- oder Erdungspläne entstehen nur aus belastbaren Daten.",[11,1057,1059],{"id":1058},"_9-vor-der-konformitätsprüfung-den-ist-stand-festschreiben","9. Vor der Konformitätsprüfung den Ist-Stand festschreiben",[16,1061,1062],{},"Vor der Ingebrauchnahme wird die neue Anlage der Konformitätsprüfung unterzogen (Kapitel 6.4). Die zugelassene Stelle misst Erdungswiderstand und Isolationspegel und bescheinigt im Bericht, dass Differenzialschalter und Erdungswiderstand sowie Überstromschutz und Leitungsabschnitte aufeinander abgestimmt sind und dass die Anlage gemäß Eindrahtschema und Positionsplan ausgeführt ist. Dazu prüft sie die Durchgängigkeit von Schutz- und Potentialausgleichsleitern (Unterabschnitt 6.4.6.4).",[16,1064,1065],{},"Such deshalb kurz vor dem Termin nach echten Abweichungen, nicht nach Tippfehlern:",[159,1067,1068,1071,1074,1077,1080,1083],{},[162,1069,1070],{},"Wurde ein anderer Leitungsschutzschalter oder Differenzialschalter eingebaut?",[162,1072,1073],{},"Hat sich ein Kabelquerschnitt oder Leitungstyp geändert?",[162,1075,1076],{},"Kam eine Steckdose, Leuchte oder Dose hinzu?",[162,1078,1079],{},"Wurde ein Stromkreis auf einen anderen Differenzialschalter umgeklemmt?",[162,1081,1082],{},"Stimmen Verteilerbeschriftung und Referenzen?",[162,1084,1085],{},"Gehören alle Seiten zur selben Fassung?",[16,1087,1088],{},"Korrigiere Anlage und Dokumente gemeinsam. Ein technischer Fehler wird behoben, nicht wegretuschiert.",[11,1090,1092],{"id":1091},"_10-dossier-und-künftige-änderungen-organisieren","10. Dossier und künftige Änderungen organisieren",[16,1094,1095],{},"Zur Akte einer hauswirtschaftlichen Anlage gehören Eindrahtschema, Positionsplan, die Berichte der Konformitätsprüfung, gegebenenfalls Nachweise zu den Betriebsmitteln und später die Unterlagen zu Änderungen. Der Eigentümer bewahrt die Akte in zweifacher Ausfertigung auf und übergibt sie bei einem Eigentümerwechsel (Abschnitt 9.1.2).",[16,1097,1098],{},"Nach der Abnahme pflegst du das Schema weiter. Wesentliche Änderungen oder Erweiterungen verlangen aktualisierte Schemata und Pläne; bei unwesentlichen genügt eine datierte und unterschriebene Kurzbeschreibung, und der Positionsplan zeigt jederzeit den aktuellen Zustand (Unterabschnitt 3.1.2.1 Buchstabe a). Bewahre den geprüften Stand und jede spätere Fassung nachvollziehbar auf.",[11,1100,1102],{"id":1101},"kompakte-endkontrolle","Kompakte Endkontrolle",[159,1104,1106,1112,1118,1124,1130,1136,1142,1148,1154,1160,1166,1172],{"className":1105},[448],[162,1107,1109,1111],{"className":1108},[452],[454,1110],{"disabled":456,"type":457}," Dokumentnummer, Fassung, Datum, Adresse und Verantwortlicher vollständig",[162,1113,1115,1117],{"className":1114},[452],[454,1116],{"disabled":456,"type":457}," Spannung, Stromart und reale Anschlusskonfiguration angegeben",[162,1119,1121,1123],{"className":1120},[452],[454,1122],{"disabled":456,"type":457}," alle Verteiler und Quellen enthalten",[162,1125,1127,1129],{"className":1126},[452],[454,1128],{"disabled":456,"type":457}," Differenzial- und Überstromschutz mit Eigenschaften erfasst",[162,1131,1133,1135],{"className":1132},[452],[454,1134],{"disabled":456,"type":457}," jeder Endstromkreis eindeutig bezeichnet",[162,1137,1139,1141],{"className":1138},[452],[454,1140],{"disabled":456,"type":457}," Leitungstyp, Querschnitt, Leiterzahl und Verlegeart vollständig",[162,1143,1145,1147],{"className":1144},[452],[454,1146],{"disabled":456,"type":457}," Steckdosen, Lichtpunkte, Dosen, Schalter und feste Geräte vorhanden",[162,1149,1151,1153],{"className":1150},[452],[454,1152],{"disabled":456,"type":457}," Symbole nach Tabelle 2.23 oder in der Legende eindeutig definiert",[162,1155,1157,1159],{"className":1156},[452],[454,1158],{"disabled":456,"type":457}," Referenzen stimmen mit Verteiler und Positionsplan überein",[162,1161,1163,1165],{"className":1162},[452],[454,1164],{"disabled":456,"type":457}," Baustellenänderungen in beiden Dokumenten nachgeführt",[162,1167,1169,1171],{"className":1168},[452],[454,1170],{"disabled":456,"type":457}," Zusatzunterlagen für PV, Sicherheits- oder Sonderanlagen ergänzt",[162,1173,1175,1177],{"className":1174},[452],[454,1176],{"disabled":456,"type":457}," Auslegung und Messungen außerhalb des Schemas erledigt",[11,1179,1181],{"id":1180},"planung-baustelle-und-inbetriebnahme-abgleichen","Planung, Baustelle und Inbetriebnahme abgleichen",[16,1183,1184],{},"Ein Neubau ändert sich zwischen Ausschreibung und Inbetriebnahme fast immer. Führe deshalb eine offene Abweichungsliste: geplante Referenz, ausgeführte Änderung, wer entschieden hat, betroffene Pläne und noch fehlender Nachweis. Typisch sind ein versetzter Verteiler, eine zusätzliche Außensteckdose, eine geänderte Wärmepumpenleistung oder ein später ergänzter PV-Wechselrichter. Erst wenn jede Zeile erledigt oder ausdrücklich als nicht ausgeführt markiert ist, wird aus dem Planungsschema ein Ist-Schema.",[16,1186,1187],{},"Geh danach mit Beschriftung und Messunterlagen durch die Anlage. Schalte Stromkreise nicht nach vermuteten Raumnamen. Vergleiche die Kennzeichnung im Verteiler mit der Referenz im Schema und dem Punkt im Positionsplan. Ändern sich bei der Inbetriebnahme Leiter, Schutzorgane oder Einstellungen, ziehst du die Dokumentation nach; ein früher PDF-Export ist keine Schlussfassung.",[11,1189,1191],{"id":1190},"beispiel-ein-neuer-endstromkreis-für-den-trockner","Beispiel: ein neuer Endstromkreis für den Trockner",[16,1193,1194],{},"Für einen fest angeschlossenen Trockner reicht die Zeile „Waschküche“ nicht. Die Akte zeigt, aus welchem Verteiler und hinter welchen Schutzgeräten der Stromkreis kommt, welche Referenz er trägt, welche Leitung mit wie vielen Leitern und welchem Querschnitt liegt und welches Gerät am Ende angeschlossen ist. Waschmaschine, Wäschetrockner und Geschirrspüler erhalten jeweils einen eigenen Stromkreis (Unterabschnitt 5.2.1.2) und hängen hinter einem Differenzialschalter mit hoher oder sehr hoher Empfindlichkeit (Unterabschnitt 4.2.4.3 Buchstabe b). Auf dem Positionsplan steht dieselbe Referenz an der tatsächlichen Anschlussstelle. Geräteanleitung, Bemessungsdaten und Einstellungen bewahrst du als technische Unterlage auf.",[16,1196,1197],{},"Prüfe danach die Schnittstellen: Ist der Schutzleiterpfad nachvollziehbar? Stimmt die Anschlussart mit der Zeichnung überein? Wurde aus einer geplanten Einzelversorgung auf der Baustelle eine gemeinsame Leitung? Fehlt im Schema eine Abzweigdose? Diese Fragen verhindern, dass formal vollständige Blätter einen überholten Planungsstand zeigen.",[11,1199,1201],{"id":1200},"übergabe-als-kontrollierter-dokumentensatz","Übergabe als kontrollierter Dokumentensatz",[16,1203,1204],{},"Benenne die finale Ausgabe eindeutig mit Projekt, Adresse, Revisionsstand und Exportdatum. Lege Eindrahtschema, Positionsplan, Kontrollbericht und technische Unterlagen geordnet ab. Arbeitskopien und frühere Revisionen kennzeichnest du getrennt als Historie. Der Eigentümer weiß so, welche Dateien aktuell sind und dass spätere Änderungen erneut dokumentiert werden.",[16,1206,1207,1208,1212,1213,568],{},"Die ",[556,1209,1211],{"href":558,"rel":1210},[560],"amtliche FÖD-Seite zur Kontrolle von Wohnanlagen"," nennt die mindestens vorzulegenden Pläne und fasst ihren Inhalt zusammen. Die Detailvorgaben stehen im ",[556,1214,1217],{"href":1215,"rel":1216},"https:\u002F\u002Feconomie.fgov.be\u002Fde\u002Fpublication\u002Fallgemeine-vorschriften-fuer",[560],"AREI\u002FRGIE Buch 1, Version 06",[11,1219,1221],{"id":1220},"vorbereitung-mit-planelec","Vorbereitung mit PlanElec",[16,1223,1224],{},"PlanElec führt Grundriss, elektrische Topologie und Verteilerdaten in einem Projekt. Eindrahtschema und Positionsplan entstehen aus demselben Modell, tragen dieselben Referenzen und gehen als PDF oder als auswählbares Installationsdossier mit Deckblatt und Dokumentverzeichnis hinaus. Der AREI\u002FRGIE-Selbstcheck prüft die unterstützten Regeln anhand deiner Projektdaten und zeigt offene Punkte, bevor der Kontrolleur sie findet.",[16,1226,1227],{},"Die Rollen sind klar verteilt: PlanElec strukturiert und prüft die Dokumentation. Anschlussklärung, Leitungsberechnung, Baustellenaufnahme und Messungen bleiben Aufgabe der Fachleute vor Ort, und die offizielle Konformitätsprüfung macht die zugelassene Stelle.",[11,1229,1231],{"id":1230},"weiterführende-artikel","Weiterführende Artikel",[159,1233,1234,1240,1246,1252,1258,1264],{},[162,1235,1236],{},[556,1237,1239],{"href":1238},"\u002Fde\u002Fblog\u002Feindrahtschema-vs-situationsplan","Eindrahtschema und Positionsplan richtig verbinden",[162,1241,1242],{},[556,1243,1245],{"href":1244},"\u002Fde\u002Fblog\u002Farei-elektrosymbole-uebersicht","AREI-Elektrosymbole im Überblick",[162,1247,1248],{},[556,1249,1251],{"href":1250},"\u002Fde\u002Fblog\u002Felektrische-abnahme","Stromabnahme in Belgien vorbereiten",[162,1253,1254],{},[556,1255,1257],{"href":1256},"\u002Fde\u002Fblog\u002Fhauptschalter-pflicht-arei","Ist ein Hauptschalter nach AREI Pflicht?",[162,1259,1260],{},[556,1261,1263],{"href":1262},"\u002Fde\u002Fblog\u002Fmaterialliste-elektroinstallation","Materialliste einer Elektroinstallation erstellen",[162,1265,1266],{},[556,1267,1269],{"href":1268},"\u002Fde\u002Fblog\u002Frauchmelder-pflicht-belgien","Rauchmelder-Pflicht in Belgien: die Regeln je Region",[16,1271,1272],{},[556,1273,1275],{"href":1274},"\u002Fde","Neubauprojekt in PlanElec anlegen →",[16,1277,1278],{},[630,1279,1280],{},"Regelgrundlage: AREI\u002FRGIE Buch 1 V06, insbesondere Kapitel 2.13, Abschnitt 3.1.2, Tabelle 4.11, Unterabschnitt 4.2.4.3, Unterabschnitt 5.2.1.2, Kapitel 6.4 und Abschnitt 9.1.2. Maßgeblich sind die amtliche Fassung und die ausgeführte Anlage.",{"title":634,"searchDepth":635,"depth":635,"links":1282},[1283,1284,1285,1286,1287,1288,1289,1290,1291,1292,1293,1294,1295,1296,1297,1298,1299,1300],{"id":687,"depth":635,"text":688},{"id":706,"depth":635,"text":707},{"id":817,"depth":635,"text":818},{"id":847,"depth":635,"text":848},{"id":880,"depth":635,"text":881},{"id":910,"depth":635,"text":911},{"id":943,"depth":635,"text":944},{"id":979,"depth":635,"text":980},{"id":1012,"depth":635,"text":1013},{"id":1025,"depth":635,"text":1026},{"id":1058,"depth":635,"text":1059},{"id":1091,"depth":635,"text":1092},{"id":1101,"depth":635,"text":1102},{"id":1180,"depth":635,"text":1181},{"id":1190,"depth":635,"text":1191},{"id":1200,"depth":635,"text":1201},{"id":1220,"depth":635,"text":1221},{"id":1230,"depth":635,"text":1231},"Was ein Eindrahtschema im Neubau enthalten muss: Kopfangaben, Versorgung, Schutzgeräte, Leitungen, Verbraucher, Quellen und der Abgleich mit dem Positionsplan nach AREI Buch 1 V06.","de",{},"\u002Fblog\u002Fnew-build-single-line-checklist.de",{"title":682,"description":1301},null,"eindrahtschema-neubau-checkliste","blog\u002Fnew-build-single-line-checklist.de",[671,672,1310,764,1311,1312,1313,1314],"Neubau","Checkliste","Situationsplan","Konformitätsprüfung","Belgien","tVB-AHoVBeEITTnUFkzGDKIpMhOIzacpCSQKSMmfSiw",{"id":1317,"title":1318,"articleId":6,"body":1319,"category":655,"date":656,"description":1936,"extension":658,"image":30,"lastUpdated":659,"locale":1937,"meta":1938,"navigation":456,"ogImage":662,"path":1939,"publishDate":656,"readTime":664,"refreshInterval":665,"seo":1940,"seoTitle":1941,"slug":1942,"stem":1943,"tags":1944,"__hash__":1949},"blog\u002Fblog\u002Fnew-build-single-line-checklist.en.md","Single-Line Diagram for a New Build: The AREI Checklist up to Inspection",{"type":8,"value":1320,"toc":1916},[1321,1325,1332,1337,1340,1344,1450,1454,1457,1474,1477,1480,1484,1487,1510,1513,1517,1520,1540,1543,1547,1550,1553,1573,1576,1580,1583,1586,1606,1612,1616,1619,1622,1642,1645,1649,1652,1655,1658,1662,1668,1671,1688,1691,1695,1698,1701,1721,1724,1728,1731,1734,1738,1813,1817,1820,1823,1827,1830,1833,1837,1840,1853,1857,1860,1863,1867,1905,1911],[11,1322,1324],{"id":1323},"what-must-a-new-build-single-line-diagram-contain","What must a new-build single-line diagram contain?",[16,1326,1327,1328,1331],{},"A single-line diagram for a Belgian new build shows the installation ",[20,1329,1330],{},"as actually built",": a title block with number, version, date, address and responsible person, the voltage and type of current, every distribution board, all residual current and overcurrent devices with their characteristics, cable type, cross-section, number of conductors and installation method, switches, boxes, socket outlets, lighting points, fixed appliances and sources. The situation plan shows the same elements with the same reference at their location. The basis is AREI\u002FRGIE Book 1 version 06, applicable since 1 April 2026, above all Section 3.1.2.",[16,1333,1334],{},[27,1335],{"alt":1336,"src":30},"Electricians check the installation in a newly built home.",[16,1338,1339],{},"The single-line diagram and the situation plan are drawn up by the person responsible for carrying out the work (Subsection 3.1.2.1 a). Before the conformity inspection they match the installed state, not the first design. This checklist takes you there in ten steps. It covers the usual AC case; earthed DC systems, which version 06 now regulates, are a separate field where you do not simply carry over AC conductor roles and symbols.",[11,1341,1343],{"id":1342},"mandatory-content-at-a-glance","Mandatory content at a glance",[39,1345,1346,1358],{},[42,1347,1348],{},[45,1349,1350,1353,1356],{},[48,1351,1352],{},"Item",[48,1354,1355],{},"Required by",[48,1357,56],{},[58,1359,1360,1371,1381,1390,1400,1410,1420,1429,1439],{},[45,1361,1362,1365,1368],{},[63,1363,1364],{},"Number, version and version date",[63,1366,1367],{},"Section 3.1.2",[63,1369,1370],{},"single-line diagram and situation plan",[45,1372,1373,1376,1379],{},[63,1374,1375],{},"Name, capacity and VAT number of the responsible person",[63,1377,1378],{},"Subsection 3.1.2.1 a",[63,1380,1370],{},[45,1382,1383,1386,1388],{},[63,1384,1385],{},"Address of the installation",[63,1387,1378],{},[63,1389,1370],{},[45,1391,1392,1395,1397],{},[63,1393,1394],{},"Voltage and type of current",[63,1396,1378],{},[63,1398,1399],{},"single-line diagram",[45,1401,1402,1405,1407],{},[63,1403,1404],{},"Capital letter per elementary circuit, sequence number per point",[63,1406,1378],{},[63,1408,1409],{},"single-line diagram, reference on the plan",[45,1411,1412,1415,1418],{},[63,1413,1414],{},"Cable type, cross-section, number of conductors and installation method",[63,1416,1417],{},"Subsection 3.1.2.2 a",[63,1419,1399],{},[45,1421,1422,1425,1427],{},[63,1423,1424],{},"Type and characteristics of residual current and overcurrent devices",[63,1426,1417],{},[63,1428,1399],{},[45,1430,1431,1434,1437],{},[63,1432,1433],{},"Switches, junction and branch boxes, socket outlets, lighting points, fixed appliances, sources",[63,1435,1436],{},"Subsections 3.1.2.2 a and 3.1.2.3 a",[63,1438,1370],{},[45,1440,1441,1444,1447],{},[63,1442,1443],{},"Symbols from Table 2.23 or an unambiguous legend",[63,1445,1446],{},"Chapter 2.13, Subsection 3.1.2.1 a",[63,1448,1449],{},"both documents",[11,1451,1453],{"id":1452},"_1-set-the-title-block-and-responsibility","1. Set the title block and responsibility",[16,1455,1456],{},"Give the document set a clear identity before you draw the first circuit:",[159,1458,1459,1462,1465,1468,1471],{},[162,1460,1461],{},"document number, version and the date of that version;",[162,1463,1464],{},"address of the installation;",[162,1466,1467],{},"name and capacity of the person responsible for the work, VAT number where applicable;",[162,1469,1470],{},"fields for dates and signatures;",[162,1472,1473],{},"voltage and type of current on the single-line diagram.",[16,1475,1476],{},"The single-line diagram and the situation plan carry the same version. A file name is not enough, because printouts and merged PDFs lose it. Nor is the export date the date on which the installation was surveyed.",[16,1478,1479],{},"The signature and visa of the approved body are only added during inspection, once the installation is found compliant (Subsection 3.1.2.1 a). A working version therefore carries no anticipated approval and no “AREI-compliant” statement.",[11,1481,1483],{"id":1482},"_2-establish-the-supply","2. Establish the supply",[16,1485,1486],{},"The diagram starts from the real supply, not from a template. Record:",[159,1488,1489,1492,1495,1498,1501,1504,1507],{},[162,1490,1491],{},"single-phase or three-phase supply;",[162,1493,1494],{},"nominal voltage and type of current;",[162,1496,1497],{},"neutral and protective conductor;",[162,1499,1500],{},"connection and meter arrangement;",[162,1502,1503],{},"rating of the supply protection and the main switch-disconnector;",[162,1505,1506],{},"earthing system and earthing concept, as far as design and protection need them;",[162,1508,1509],{},"additional sources such as a PV inverter or transformer.",[16,1511,1512],{},"No socket outlet tells you whether a supply is a 3×400 V network with neutral or a 3×230 V network. A wrong assumption carries through to the number of poles, the neutral, the wiring of the RCDs and the loads. Compare the connection contract, the board layout and a measurement; when in doubt, the grid operator confirms the supply data.",[11,1514,1516],{"id":1515},"_3-capture-every-board-as-part-of-the-protection-chain","3. Capture every board as part of the protection chain",[16,1518,1519],{},"Record the main board and sub-boards with their feeds and interconnections. The path from the origin to every final circuit is fully traceable. Depending on the installation, this includes:",[159,1521,1522,1525,1528,1531,1534,1537],{},[162,1523,1524],{},"main switch and upstream protection;",[162,1526,1527],{},"RCDs with type, rated residual current, rated current and relevant characteristic;",[162,1529,1530],{},"fuses or circuit breakers with rating and curve;",[162,1532,1533],{},"busbars, links and sub-boards that explain the structure;",[162,1535,1536],{},"spare breakers shown as spares, without an invented cable or load;",[162,1538,1539],{},"a unique name for every board and outgoing way.",[16,1541,1542],{},"A 300 mA device followed by a 30 mA device does not prove selectivity on its own. Waveform type, increased immunity and time delay are separate properties. Short-circuit conditions, disconnection times and coordination according to the manufacturer belong to the technical design.",[11,1544,1546],{"id":1545},"_4-give-every-final-circuit-a-stable-reference","4. Give every final circuit a stable reference",[16,1548,1549],{},"Each elementary circuit gets a capital letter. You number lighting points, socket outlets and control devices in the order in which they occur in the circuit, starting from the upstream overcurrent device (Subsection 3.1.2.1 a). The same reference appears on the board label.",[16,1551,1552],{},"For every outgoing way the survey answers:",[159,1554,1555,1558,1561,1564,1567,1570],{},[162,1556,1557],{},"Which use and which loads belong to it?",[162,1559,1560],{},"Is it a lighting, socket, mixed or dedicated appliance circuit?",[162,1562,1563],{},"Which fixed appliances are connected?",[162,1565,1566],{},"Are there junction or branch boxes?",[162,1568,1569],{},"Which RCD protects the circuit?",[162,1571,1572],{},"Do the diagram, board label and situation plan agree?",[16,1574,1575],{},"“Kitchen” is not a usable name when lighting, worktop sockets, dishwasher and hob each have their own circuit. Names help orientation; only the electrical reference is unambiguous.",[11,1577,1579],{"id":1578},"_5-state-all-cable-data","5. State all cable data",[16,1581,1582],{},"Subsection 3.1.2.2 a requires type, cross-section, number of conductors and installation method. Record them per cable section. After a branch or junction box, the cable or installation method can change; a single cable label at the start of the circuit hides that.",[16,1584,1585],{},"The design behind the diagram goes further. Check separately:",[159,1587,1588,1591,1594,1597,1600,1603],{},[162,1589,1590],{},"design current, protective-device rating and current-carrying capacity;",[162,1592,1593],{},"installation method, grouping, ambient temperature and thermal insulation;",[162,1595,1596],{},"cable length and voltage drop;",[162,1598,1599],{},"short-circuit and fault-loop conditions;",[162,1601,1602],{},"minimum cross-sections and specific circuit rules;",[162,1604,1605],{},"the stated protective conductor against the cable actually installed.",[16,1607,1608,1609,1611],{},"Table 4.11 gives, for domestic installations, the highest fuse or circuit-breaker rating per cross-section, for example a 20 A circuit breaker for 2.5 mm². It is a ceiling, not a complete cable calculation. A neat label such as ",[313,1610,315],{}," is worthless if a different cable was installed on site.",[11,1613,1615],{"id":1614},"_6-record-loads-boxes-and-controls","6. Record loads, boxes and controls",[16,1617,1618],{},"The single-line diagram contains switches, junction and branch boxes, socket outlets, lighting points and fixed machines and appliances (Subsection 3.1.2.2 a). Use the symbols from Table 2.23. Where a sign is missing, define an unambiguous symbol in the legend.",[16,1620,1621],{},"Make visible what matters technically:",[159,1623,1624,1627,1630,1633,1636,1639],{},[162,1625,1626],{},"single or multiple socket outlet;",[162,1628,1629],{},"socket with earth contact, switched or special socket;",[162,1631,1632],{},"lighting point and actual switching function;",[162,1634,1635],{},"push button, relay, motion detector or home-automation control;",[162,1637,1638],{},"permanently connected appliance or ordinary socket load;",[162,1640,1641],{},"junction box or branch box.",[16,1643,1644],{},"A generic appliance symbol with clear text is better than an invented pictogram. Function, reference and connection are what count.",[11,1646,1648],{"id":1647},"_7-draw-sources-and-special-parts","7. Draw sources and special parts",[16,1650,1651],{},"PV installation, inverter, battery, generator and transformer belong in the electrical structure of the single-line diagram; the situation plan shows where they are. For a domestic low-voltage PV installation, the installation file additionally contains operating and maintenance instructions, safety instructions and the technical references and characteristics of the installed equipment such as make, model and power (Section 9.1.2).",[16,1653,1654],{},"A PV arrow next to the main board describes neither the connection point nor the protection chain. Draw which source can feed in, where it connects and which components lie in between. Whether a battery can export to the grid is something you take from the manufacturer documentation rather than guess.",[16,1656,1657],{},"Where safety or critical installations exist, a list and a plan of those installations are added; their sources, circuits and loads are clearly identified on the single-line diagram (Subsection 3.1.2.1 a).",[11,1659,1661],{"id":1660},"_8-keep-the-situation-plan-in-sync","8. Keep the situation plan in sync",[16,1663,1664,1665,1667],{},"Every board, box, socket outlet, luminaire, control, fixed appliance and source on the single-line diagram appears at its location on the situation plan (Subsection 3.1.2.3 a). The reference ",[313,1666,372],{}," means the same element in both documents. Switches carry the letter of their circuit and the number of the point they control.",[16,1669,1670],{},"Check in both directions:",[378,1672,1673,1676,1679,1682,1685],{},[162,1674,1675],{},"find every diagram element on the situation plan;",[162,1677,1678],{},"find every plan symbol on the single-line diagram;",[162,1680,1681],{},"compare letter and number;",[162,1683,1684],{},"confirm floor, room and board assignment;",[162,1686,1687],{},"include concealed boxes and outdoor elements.",[16,1689,1690],{},"You do not draw unknown cable routes. The situation plan locates the required components; additional cable or earthing plans are only produced from reliable data.",[11,1692,1694],{"id":1693},"_9-freeze-the-installed-state-before-the-conformity-inspection","9. Freeze the installed state before the conformity inspection",[16,1696,1697],{},"Before it is put into use, the new installation undergoes the conformity inspection (Chapter 6.4). The approved body measures the earth resistance and the insulation level and certifies in its report that the RCDs match the earth resistance, that the overcurrent devices match the circuit sections they protect and that the installation was built according to the single-line diagram and situation plan. It also checks the continuity of bonding and protective conductors (Subsection 6.4.6.4).",[16,1699,1700],{},"Shortly before the appointment, look for real deviations, not typos:",[159,1702,1703,1706,1709,1712,1715,1718],{},[162,1704,1705],{},"Was a different circuit breaker or RCD installed?",[162,1707,1708],{},"Did a cable cross-section or type change?",[162,1710,1711],{},"Was a socket outlet, luminaire or box added?",[162,1713,1714],{},"Was a circuit moved to a different RCD?",[162,1716,1717],{},"Do board labels and references match?",[162,1719,1720],{},"Do all pages belong to the same version?",[16,1722,1723],{},"Correct the installation and the documents together. A technical fault gets fixed, not airbrushed out of the drawing.",[11,1725,1727],{"id":1726},"_10-organise-the-file-and-future-changes","10. Organise the file and future changes",[16,1729,1730],{},"The file of a domestic installation contains the single-line diagram, the situation plan, the conformity inspection reports, any evidence about the equipment and, later, the documents for alterations. The owner keeps the file in two copies and hands it over to a new owner (Section 9.1.2).",[16,1732,1733],{},"After the inspection you keep the diagram up to date. Substantial alterations or extensions require updated diagrams and plans; for a non-substantial one, a short dated and signed description is enough, and the situation plan always shows the current state (Subsection 3.1.2.1 a). Keep the inspected version and every later version traceable.",[11,1735,1737],{"id":1736},"final-check","Final check",[159,1739,1741,1747,1753,1759,1765,1771,1777,1783,1789,1795,1801,1807],{"className":1740},[448],[162,1742,1744,1746],{"className":1743},[452],[454,1745],{"disabled":456,"type":457}," document number, version, date, address and responsible person complete",[162,1748,1750,1752],{"className":1749},[452],[454,1751],{"disabled":456,"type":457}," voltage, type of current and real supply configuration stated",[162,1754,1756,1758],{"className":1755},[452],[454,1757],{"disabled":456,"type":457}," all boards and sources included",[162,1760,1762,1764],{"className":1761},[452],[454,1763],{"disabled":456,"type":457}," residual current and overcurrent protection with characteristics recorded",[162,1766,1768,1770],{"className":1767},[452],[454,1769],{"disabled":456,"type":457}," every final circuit uniquely referenced",[162,1772,1774,1776],{"className":1773},[452],[454,1775],{"disabled":456,"type":457}," cable type, cross-section, number of conductors and installation method complete",[162,1778,1780,1782],{"className":1779},[452],[454,1781],{"disabled":456,"type":457}," socket outlets, lighting points, boxes, switches and fixed appliances present",[162,1784,1786,1788],{"className":1785},[452],[454,1787],{"disabled":456,"type":457}," symbols from Table 2.23 or unambiguously defined in the legend",[162,1790,1792,1794],{"className":1791},[452],[454,1793],{"disabled":456,"type":457}," references match the board and the situation plan",[162,1796,1798,1800],{"className":1797},[452],[454,1799],{"disabled":456,"type":457}," site changes reflected in both documents",[162,1802,1804,1806],{"className":1803},[452],[454,1805],{"disabled":456,"type":457}," additional documents for PV, safety or special installations added",[162,1808,1810,1812],{"className":1809},[452],[454,1811],{"disabled":456,"type":457}," design calculations and measurements completed outside the diagram",[11,1814,1816],{"id":1815},"align-design-site-and-commissioning","Align design, site and commissioning",[16,1818,1819],{},"A new build almost always changes between tender and commissioning. Keep an open deviation list: planned reference, executed change, who decided, affected plans and missing evidence. Typical cases are a relocated board, an extra outdoor socket, a different heat pump rating or a PV inverter added late. Only when every line is closed or explicitly marked as not executed does the design diagram become an as-built diagram.",[16,1821,1822],{},"Then walk through the installation with labels and measurement records. Do not switch circuits based on assumed room names. Compare the marking in the board with the reference on the diagram and the point on the situation plan. If conductors, protective devices or settings change during commissioning, the documentation follows; an early PDF export is not a final version.",[11,1824,1826],{"id":1825},"example-a-new-final-circuit-for-the-tumble-dryer","Example: a new final circuit for the tumble dryer",[16,1828,1829],{},"For a permanently connected tumble dryer, “utility room” is not enough. The file shows which board and which protective devices the circuit comes from, which reference it carries, which cable with how many conductors and which cross-section is installed and which appliance sits at the end. Washing machine, tumble dryer and dishwasher each get a dedicated circuit (Subsection 5.2.1.2) and are protected by an RCD of high or very high sensitivity (Subsection 4.2.4.3 b). The same reference appears at the real connection point on the situation plan. Appliance manual, ratings and settings are kept as technical documentation.",[16,1831,1832],{},"Then check the interfaces: is the protective-conductor path traceable? Does the connection method match the drawing? Did a dedicated supply become a shared run on site? Is a branch box missing from the diagram? These questions stop formally complete pages from preserving an outdated design state.",[11,1834,1836],{"id":1835},"hand-over-a-controlled-document-set","Hand over a controlled document set",[16,1838,1839],{},"Identify the final issue clearly with project, address, revision and export date. File the single-line diagram, situation plan, inspection report and technical documents in an ordered dossier. Mark working copies and superseded revisions separately as history. The owner then knows which files are current and that later changes have to be documented again.",[16,1841,1842,1843,1847,1848,568],{},"The ",[556,1844,1846],{"href":558,"rel":1845},[560],"official FPS Economy page on domestic electrical inspections"," lists the minimum plans to present and summarises their content. The detailed requirements are in ",[556,1849,1852],{"href":1850,"rel":1851},"https:\u002F\u002Feconomie.fgov.be\u002Ffr\u002Fpublications\u002Freglement-general-sur-les",[560],"AREI\u002FRGIE Book 1, version 06",[11,1854,1856],{"id":1855},"preparing-with-planelec","Preparing with PlanElec",[16,1858,1859],{},"PlanElec keeps the floor plan, electrical topology and board data in one project. The single-line diagram and situation plan come from the same model, carry the same references and leave as PDFs or as a compiled installation dossier with cover sheet and document index. The AREI\u002FRGIE self-check tests the supported rules against your project data and shows open points before the inspector finds them.",[16,1861,1862],{},"The roles are clearly split: PlanElec structures and checks the documentation. Supply verification, cable design, site survey and measurements remain the work of the professionals on site, and the approved body carries out the official conformity inspection.",[11,1864,1866],{"id":1865},"related-guidance","Related guidance",[159,1868,1869,1875,1881,1887,1893,1899],{},[162,1870,1871],{},[556,1872,1874],{"href":1873},"\u002Fen\u002Fblog\u002Fsingle-line-diagram-vs-situation-plan","Coordinate the single-line and situation plans",[162,1876,1877],{},[556,1878,1880],{"href":1879},"\u002Fen\u002Fblog\u002Farei-electrical-symbols-overview","Understand AREI electrical symbols",[162,1882,1883],{},[556,1884,1886],{"href":1885},"\u002Fen\u002Fblog\u002Felectrical-inspection","Prepare for electrical inspection",[162,1888,1889],{},[556,1890,1892],{"href":1891},"\u002Fen\u002Fblog\u002Fmain-switch-mandatory-arei","Is a main switch mandatory under AREI?",[162,1894,1895],{},[556,1896,1898],{"href":1897},"\u002Fen\u002Fblog\u002Fbill-of-materials-electrical-installation","Drawing up a bill of materials for an electrical installation",[162,1900,1901],{},[556,1902,1904],{"href":1903},"\u002Fen\u002Fblog\u002Fsmoke-detector-mandatory-belgium","Smoke detectors in Belgium: the rules per region",[16,1906,1907],{},[556,1908,1910],{"href":1909},"\u002Fen","Start a new-build project in PlanElec →",[16,1912,1913],{},[630,1914,1915],{},"Basis: AREI\u002FRGIE Book 1 V06, particularly Chapter 2.13, Section 3.1.2, Table 4.11, Subsection 4.2.4.3, Subsection 5.2.1.2, Chapter 6.4 and Section 9.1.2. The official text and the installed system remain decisive.",{"title":634,"searchDepth":635,"depth":635,"links":1917},[1918,1919,1920,1921,1922,1923,1924,1925,1926,1927,1928,1929,1930,1931,1932,1933,1934,1935],{"id":1323,"depth":635,"text":1324},{"id":1342,"depth":635,"text":1343},{"id":1452,"depth":635,"text":1453},{"id":1482,"depth":635,"text":1483},{"id":1515,"depth":635,"text":1516},{"id":1545,"depth":635,"text":1546},{"id":1578,"depth":635,"text":1579},{"id":1614,"depth":635,"text":1615},{"id":1647,"depth":635,"text":1648},{"id":1660,"depth":635,"text":1661},{"id":1693,"depth":635,"text":1694},{"id":1726,"depth":635,"text":1727},{"id":1736,"depth":635,"text":1737},{"id":1815,"depth":635,"text":1816},{"id":1825,"depth":635,"text":1826},{"id":1835,"depth":635,"text":1836},{"id":1855,"depth":635,"text":1856},{"id":1865,"depth":635,"text":1866},"What a new-build single-line diagram must contain: title block, supply, protective devices, cables, loads, sources and the match with the situation plan under AREI Book 1 V06.","en",{},"\u002Fblog\u002Fnew-build-single-line-checklist.en",{"title":1318,"description":1936},"New Build Single-Line Diagram: AREI Checklist","new-build-single-line-diagram-checklist","blog\u002Fnew-build-single-line-checklist.en",[671,672,1945,1399,674,1946,1947,1948],"new build","position plan","conformity inspection","Belgium","_NE74mM_A50gmii--mWJXxRA3GfgQEVV5P6HezQ-KS0",{"id":1951,"title":1952,"articleId":6,"body":1953,"category":655,"date":656,"description":2569,"extension":658,"image":30,"lastUpdated":659,"locale":2570,"meta":2571,"navigation":456,"ogImage":662,"path":2572,"publishDate":656,"readTime":664,"refreshInterval":665,"seo":2573,"seoTitle":2574,"slug":2575,"stem":2576,"tags":2577,"__hash__":2582},"blog\u002Fblog\u002Fnew-build-single-line-checklist.fr.md","Schéma unifilaire en construction neuve : checklist RGIE jusqu’au contrôle",{"type":8,"value":1954,"toc":2549},[1955,1959,1966,1971,1974,1978,2084,2088,2091,2108,2111,2114,2118,2121,2144,2147,2151,2154,2174,2177,2181,2184,2187,2207,2210,2214,2217,2220,2240,2246,2250,2253,2256,2276,2279,2283,2286,2289,2292,2296,2302,2305,2322,2325,2329,2332,2335,2355,2358,2362,2365,2368,2372,2447,2451,2454,2457,2461,2464,2467,2471,2474,2486,2490,2493,2496,2500,2538,2544],[11,1956,1958],{"id":1957},"que-doit-contenir-le-schéma-unifilaire-dune-construction-neuve","Que doit contenir le schéma unifilaire d’une construction neuve ?",[16,1960,1961,1962,1965],{},"Le schéma unifilaire d’une construction neuve en Belgique décrit l’installation ",[20,1963,1964],{},"réellement exécutée"," : un cartouche avec numéro, version, date, adresse et responsable, la tension et la nature du courant, chaque tableau, tous les dispositifs différentiels et de protection contre les surintensités avec leurs caractéristiques, le type, la section, le nombre de conducteurs et le mode de pose des canalisations, les interrupteurs, boîtes, prises, points lumineux, appareils fixes et sources. Le plan de position montre les mêmes éléments, avec le même repère, à leur emplacement. La base est le RGIE Livre 1 version 06, applicable depuis le 1er avril 2026, en particulier la section 3.1.2.",[16,1967,1968],{},[27,1969],{"alt":1970,"src":30},"Des électriciens vérifient l’installation d’une maison neuve.",[16,1972,1973],{},"Le schéma unifilaire et le plan de position sont établis par le responsable de l’exécution des travaux (sous-section 3.1.2.1, a). Avant le contrôle de conformité, ils correspondent à l’état réel, pas au premier projet. Cette checklist vous y conduit en dix étapes. Elle traite le cas AC habituel ; les systèmes DC mis à la terre, que la version 06 encadre désormais, forment un domaine distinct pour lequel on ne transpose pas simplement les rôles de conducteurs et les symboles AC.",[11,1975,1977],{"id":1976},"les-mentions-obligatoires-en-un-coup-dœil","Les mentions obligatoires en un coup d’œil",[39,1979,1980,1992],{},[42,1981,1982],{},[45,1983,1984,1987,1990],{},[48,1985,1986],{},"Mention",[48,1988,1989],{},"Où elle est exigée",[48,1991,56],{},[58,1993,1994,2005,2015,2024,2034,2044,2054,2063,2073],{},[45,1995,1996,1999,2002],{},[63,1997,1998],{},"Numéro, version et date de la version",[63,2000,2001],{},"section 3.1.2",[63,2003,2004],{},"schéma unifilaire et plan de position",[45,2006,2007,2010,2013],{},[63,2008,2009],{},"Nom, qualité et numéro de TVA du responsable",[63,2011,2012],{},"sous-section 3.1.2.1, a",[63,2014,2004],{},[45,2016,2017,2020,2022],{},[63,2018,2019],{},"Adresse de l’installation",[63,2021,2012],{},[63,2023,2004],{},[45,2025,2026,2029,2031],{},[63,2027,2028],{},"Tension et nature du courant",[63,2030,2012],{},[63,2032,2033],{},"schéma unifilaire",[45,2035,2036,2039,2041],{},[63,2037,2038],{},"Lettre majuscule par circuit élémentaire, numéro d’ordre par point",[63,2040,2012],{},[63,2042,2043],{},"schéma unifilaire, repère sur le plan",[45,2045,2046,2049,2052],{},[63,2047,2048],{},"Type, section, nombre de conducteurs et mode de pose des canalisations",[63,2050,2051],{},"sous-section 3.1.2.2, a",[63,2053,2033],{},[45,2055,2056,2059,2061],{},[63,2057,2058],{},"Type et caractéristiques des dispositifs différentiels et de protection contre les surintensités",[63,2060,2051],{},[63,2062,2033],{},[45,2064,2065,2068,2071],{},[63,2066,2067],{},"Interrupteurs, boîtes de jonction et de dérivation, prises, points lumineux, appareils fixes, sources",[63,2069,2070],{},"sous-sections 3.1.2.2, a et 3.1.2.3, a",[63,2072,2004],{},[45,2074,2075,2078,2081],{},[63,2076,2077],{},"Symboles du tableau 2.23 ou légende univoque",[63,2079,2080],{},"chapitre 2.13, sous-section 3.1.2.1, a",[63,2082,2083],{},"les deux documents",[11,2085,2087],{"id":2086},"_1-fixer-le-cartouche-et-la-responsabilité","1. Fixer le cartouche et la responsabilité",[16,2089,2090],{},"Donnez une identité claire à la série de documents avant de tracer le premier circuit :",[159,2092,2093,2096,2099,2102,2105],{},[162,2094,2095],{},"numéro du document, version et date de cette version ;",[162,2097,2098],{},"adresse de l’installation ;",[162,2100,2101],{},"nom et qualité du responsable de l’exécution, numéro de TVA le cas échéant ;",[162,2103,2104],{},"emplacements pour la date et les signatures ;",[162,2106,2107],{},"tension et nature du courant sur le schéma unifilaire.",[16,2109,2110],{},"Le schéma unifilaire et le plan de position portent la même version. Un nom de fichier ne suffit pas : les impressions et les PDF fusionnés le perdent. La date d’export n’est pas non plus la date du relevé de l’installation.",[16,2112,2113],{},"La signature et le visa de l’organisme agréé n’interviennent que lors du contrôle, si l’installation est conforme (sous-section 3.1.2.1, a). Une version de travail ne porte donc ni approbation anticipée ni mention « conforme au RGIE ».",[11,2115,2117],{"id":2116},"_2-établir-lalimentation","2. Établir l’alimentation",[16,2119,2120],{},"Le schéma part de l’alimentation réelle, pas d’un modèle. Notez :",[159,2122,2123,2126,2129,2132,2135,2138,2141],{},[162,2124,2125],{},"alimentation monophasée ou triphasée ;",[162,2127,2128],{},"tension nominale et nature du courant ;",[162,2130,2131],{},"conducteur neutre et conducteur de protection ;",[162,2133,2134],{},"disposition du raccordement et du compteur ;",[162,2136,2137],{},"calibre de la protection de raccordement et interrupteur-sectionneur général ;",[162,2139,2140],{},"schéma de liaison à la terre et concept de mise à la terre, dans la mesure où l’étude et la protection en ont besoin ;",[162,2142,2143],{},"sources supplémentaires, comme un onduleur PV ou un transformateur.",[16,2145,2146],{},"Aucune prise ne vous dit si le raccordement est un réseau 3×400 V avec neutre ou un réseau 3×230 V. Une hypothèse erronée se répercute sur le nombre de pôles, le neutre, le câblage des différentiels et les récepteurs. Confrontez donc contrat de raccordement, composition du tableau et mesure ; en cas de doute, le gestionnaire de réseau confirme les données de raccordement.",[11,2148,2150],{"id":2149},"_3-intégrer-chaque-tableau-à-la-chaîne-de-protection","3. Intégrer chaque tableau à la chaîne de protection",[16,2152,2153],{},"Relevez tableaux principal et divisionnaires avec leur alimentation et leur liaison. Le chemin du point d’alimentation jusqu’à chaque circuit terminal est entièrement traçable. Selon l’installation, cela comprend :",[159,2155,2156,2159,2162,2165,2168,2171],{},[162,2157,2158],{},"interrupteur général et protection amont ;",[162,2160,2161],{},"dispositifs différentiels avec type, courant différentiel assigné, courant assigné et caractéristique utile ;",[162,2163,2164],{},"fusibles ou disjoncteurs avec calibre et courbe ;",[162,2166,2167],{},"barres, liaisons et tableaux divisionnaires qui expliquent la structure ;",[162,2169,2170],{},"disjoncteurs de réserve indiqués comme réserve, sans câble ni récepteur inventé ;",[162,2172,2173],{},"un nom univoque pour chaque tableau et chaque départ.",[16,2175,2176],{},"L’enchaînement 300 mA puis 30 mA ne prouve pas à lui seul la sélectivité. Classe de forme d’onde, immunité renforcée et temporisation sont des propriétés distinctes. Conditions de court-circuit, temps de coupure et coordination selon le fabricant relèvent de l’étude technique.",[11,2178,2180],{"id":2179},"_4-donner-un-repère-stable-à-chaque-circuit-terminal","4. Donner un repère stable à chaque circuit terminal",[16,2182,2183],{},"Chaque circuit élémentaire reçoit une lettre majuscule. Points lumineux, prises et organes de commande sont numérotés dans l’ordre où ils apparaissent dans le circuit à partir de la protection contre les surintensités placée en amont (sous-section 3.1.2.1, a). Le même repère figure sur l’étiquette du tableau.",[16,2185,2186],{},"Pour chaque départ, le relevé répond à ces questions :",[159,2188,2189,2192,2195,2198,2201,2204],{},[162,2190,2191],{},"Quel usage et quels récepteurs ?",[162,2193,2194],{},"Circuit d’éclairage, de prises, mixte ou dédié à un appareil ?",[162,2196,2197],{},"Quels appareils fixes sont raccordés ?",[162,2199,2200],{},"Y a-t-il des boîtes de jonction ou de dérivation ?",[162,2202,2203],{},"Quel différentiel protège le circuit ?",[162,2205,2206],{},"Schéma, étiquette du tableau et plan de position concordent-ils ?",[16,2208,2209],{},"« Cuisine » ne suffit pas quand éclairage, prises du plan de travail, lave-vaisselle et table de cuisson ont chacun leur circuit. Le nom aide à s’orienter ; seul le repère électrique est univoque.",[11,2211,2213],{"id":2212},"_5-indiquer-toutes-les-données-de-canalisation","5. Indiquer toutes les données de canalisation",[16,2215,2216],{},"La sous-section 3.1.2.2, a, exige le type, la section, le nombre de conducteurs et le mode de pose. Notez-les pour chaque tronçon. Après une boîte de dérivation ou de jonction, le câble ou le mode de pose peut changer ; un seul libellé au début du circuit masque ces différences.",[16,2218,2219],{},"L’étude derrière le schéma va plus loin. Vérifiez séparément :",[159,2221,2222,2225,2228,2231,2234,2237],{},[162,2223,2224],{},"courant d’emploi, calibre de la protection et courant admissible ;",[162,2226,2227],{},"mode de pose, groupement, température ambiante et isolation thermique ;",[162,2229,2230],{},"longueur et chute de tension ;",[162,2232,2233],{},"conditions de court-circuit et de boucle de défaut ;",[162,2235,2236],{},"sections minimales et règles particulières de circuit ;",[162,2238,2239],{},"conducteur de protection indiqué par rapport à la canalisation réellement posée.",[16,2241,2242,2243,2245],{},"Le tableau 4.11 donne, pour les installations domestiques, le calibre maximal du fusible ou du disjoncteur par section, par exemple un disjoncteur de 20 A pour 2,5 mm². C’est un plafond, pas un calcul complet de câble. Un libellé propre comme ",[313,2244,315],{}," ne vaut rien si une autre canalisation a été posée sur chantier.",[11,2247,2249],{"id":2248},"_6-relever-récepteurs-boîtes-et-commandes","6. Relever récepteurs, boîtes et commandes",[16,2251,2252],{},"Le schéma unifilaire comprend interrupteurs, boîtes de jonction et de dérivation, prises, points lumineux ainsi que machines et appareils fixes (sous-section 3.1.2.2, a). Utilisez les symboles du tableau 2.23. Si un signe y manque, définissez un symbole univoque dans la légende.",[16,2254,2255],{},"Rendez visible ce qui compte techniquement :",[159,2257,2258,2261,2264,2267,2270,2273],{},[162,2259,2260],{},"prise simple ou multiple ;",[162,2262,2263],{},"prise avec contact de terre, prise commandée ou spéciale ;",[162,2265,2266],{},"point lumineux et fonction de commande réelle ;",[162,2268,2269],{},"bouton-poussoir, relais, détecteur ou commande domotique ;",[162,2271,2272],{},"appareil raccordé à demeure ou simple charge sur prise ;",[162,2274,2275],{},"boîte de jonction ou boîte de dérivation.",[16,2277,2278],{},"Un symbole d’appareil générique accompagné d’un texte clair vaut mieux qu’un pictogramme inventé. Comptent la fonction, le repère et le raccordement.",[11,2280,2282],{"id":2281},"_7-dessiner-les-sources-et-les-parties-particulières","7. Dessiner les sources et les parties particulières",[16,2284,2285],{},"Installation PV, onduleur, batterie, groupe électrogène et transformateur font partie de la structure électrique du schéma unifilaire ; le plan de position indique leur emplacement. Pour une installation photovoltaïque domestique basse tension, le dossier comprend en outre les instructions de service et d’entretien, les consignes de sécurité et les références et caractéristiques techniques du matériel installé, comme la marque, le modèle et la puissance (section 9.1.2).",[16,2287,2288],{},"Une flèche PV près du tableau principal ne décrit ni le point de raccordement ni la chaîne de protection. Dessinez quelle source peut injecter, où elle se raccorde et quels composants se trouvent entre les deux. Si une batterie peut réinjecter sur le réseau, vous le vérifiez dans la documentation du fabricant au lieu de le supposer.",[16,2290,2291],{},"En présence d’installations de sécurité ou critiques, une liste et un plan de ces installations s’ajoutent ; leurs sources, circuits et récepteurs sont clairement identifiés sur le schéma unifilaire (sous-section 3.1.2.1, a).",[11,2293,2295],{"id":2294},"_8-garder-le-plan-de-position-synchronisé","8. Garder le plan de position synchronisé",[16,2297,2298,2299,2301],{},"Chaque tableau, boîte, prise, luminaire, commande, appareil fixe et source du schéma unifilaire figure à son emplacement sur le plan de position (sous-section 3.1.2.3, a). Le repère ",[313,2300,372],{}," désigne le même élément dans les deux documents. Les interrupteurs portent la lettre de leur circuit et le numéro du point qu’ils commandent.",[16,2303,2304],{},"Contrôlez dans les deux sens :",[378,2306,2307,2310,2313,2316,2319],{},[162,2308,2309],{},"retrouver chaque élément du schéma sur le plan de position ;",[162,2311,2312],{},"retrouver chaque symbole du plan sur le schéma unifilaire ;",[162,2314,2315],{},"comparer lettre et numéro ;",[162,2317,2318],{},"vérifier étage, pièce et tableau d’origine ;",[162,2320,2321],{},"ne pas oublier les boîtes cachées et les éléments extérieurs.",[16,2323,2324],{},"Vous ne dessinez pas un cheminement de câble inconnu. Le plan de position situe les composants exigés ; des plans de câblage ou de mise à la terre supplémentaires ne s’établissent qu’à partir de données fiables.",[11,2326,2328],{"id":2327},"_9-figer-létat-réel-avant-le-contrôle-de-conformité","9. Figer l’état réel avant le contrôle de conformité",[16,2330,2331],{},"Avant sa mise en usage, la nouvelle installation est soumise au contrôle de conformité (chapitre 6.4). L’organisme agréé mesure la résistance de dispersion de la prise de terre et le niveau d’isolement, et atteste dans le rapport que les différentiels sont adaptés à la valeur de la prise de terre, que les protections contre les surintensités sont adaptées aux canalisations qu’elles protègent et que l’installation est réalisée conformément au schéma unifilaire et au plan de position. Il vérifie aussi la continuité des liaisons équipotentielles et des conducteurs de protection (sous-section 6.4.6.4).",[16,2333,2334],{},"Juste avant le rendez-vous, cherchez donc de vrais écarts, pas des fautes de frappe :",[159,2336,2337,2340,2343,2346,2349,2352],{},[162,2338,2339],{},"Un autre disjoncteur ou différentiel a-t-il été posé ?",[162,2341,2342],{},"Une section ou un type de câble a-t-il changé ?",[162,2344,2345],{},"Une prise, un luminaire ou une boîte a-t-il été ajouté ?",[162,2347,2348],{},"Un circuit a-t-il été déplacé vers un autre différentiel ?",[162,2350,2351],{},"Étiquettes du tableau et repères concordent-ils ?",[162,2353,2354],{},"Toutes les pages appartiennent-elles à la même version ?",[16,2356,2357],{},"Corrigez l’installation et les documents ensemble. Un défaut technique se corrige ; il ne se gomme pas sur le dessin.",[11,2359,2361],{"id":2360},"_10-organiser-le-dossier-et-les-modifications-futures","10. Organiser le dossier et les modifications futures",[16,2363,2364],{},"Le dossier d’une installation domestique comprend le schéma unifilaire, le plan de position, les rapports de contrôle de conformité, le cas échéant les justificatifs relatifs au matériel et, plus tard, les documents liés aux modifications. Le propriétaire conserve ce dossier en deux exemplaires et le transmet au nouveau propriétaire (section 9.1.2).",[16,2366,2367],{},"Après le contrôle, vous continuez à tenir le schéma à jour. Une modification ou extension importante exige des schémas et plans mis à jour ; pour une modification non importante, une description succincte datée et signée suffit, et le plan de position montre à tout moment l’état actuel (sous-section 3.1.2.1, a). Conservez de manière traçable la version contrôlée et chaque version ultérieure.",[11,2369,2371],{"id":2370},"vérification-finale","Vérification finale",[159,2373,2375,2381,2387,2393,2399,2405,2411,2417,2423,2429,2435,2441],{"className":2374},[448],[162,2376,2378,2380],{"className":2377},[452],[454,2379],{"disabled":456,"type":457}," numéro, version, date, adresse et responsable complets",[162,2382,2384,2386],{"className":2383},[452],[454,2385],{"disabled":456,"type":457}," tension, nature du courant et raccordement réel indiqués",[162,2388,2390,2392],{"className":2389},[452],[454,2391],{"disabled":456,"type":457}," tous les tableaux et toutes les sources présents",[162,2394,2396,2398],{"className":2395},[452],[454,2397],{"disabled":456,"type":457}," protections différentielles et contre les surintensités avec caractéristiques",[162,2400,2402,2404],{"className":2401},[452],[454,2403],{"disabled":456,"type":457}," chaque circuit terminal repéré de façon univoque",[162,2406,2408,2410],{"className":2407},[452],[454,2409],{"disabled":456,"type":457}," type de câble, section, nombre de conducteurs et mode de pose complets",[162,2412,2414,2416],{"className":2413},[452],[454,2415],{"disabled":456,"type":457}," prises, points lumineux, boîtes, interrupteurs et appareils fixes présents",[162,2418,2420,2422],{"className":2419},[452],[454,2421],{"disabled":456,"type":457}," symboles du tableau 2.23 ou légende univoque",[162,2424,2426,2428],{"className":2425},[452],[454,2427],{"disabled":456,"type":457}," repères identiques au tableau et au plan de position",[162,2430,2432,2434],{"className":2431},[452],[454,2433],{"disabled":456,"type":457}," modifications de chantier reportées dans les deux documents",[162,2436,2438,2440],{"className":2437},[452],[454,2439],{"disabled":456,"type":457}," pièces complémentaires pour le PV et les installations de sécurité ou particulières ajoutées",[162,2442,2444,2446],{"className":2443},[452],[454,2445],{"disabled":456,"type":457}," calculs d’étude et mesures réalisés en dehors du schéma",[11,2448,2450],{"id":2449},"accorder-étude-chantier-et-mise-en-service","Accorder étude, chantier et mise en service",[16,2452,2453],{},"Une construction neuve change presque toujours entre l’offre et la mise en service. Tenez donc une liste d’écarts ouverte : repère prévu, modification exécutée, auteur de la décision, plans concernés et preuve manquante. Exemples typiques : tableau déplacé, prise extérieure supplémentaire, puissance de pompe à chaleur modifiée ou onduleur PV ajouté tardivement. Le schéma d’étude ne devient un schéma conforme à l’exécution que lorsque chaque ligne est réglée ou marquée explicitement comme non exécutée.",[16,2455,2456],{},"Parcourez ensuite l’installation avec les étiquettes et les documents de mesure. Ne manœuvrez pas les circuits d’après des noms de pièces supposés. Comparez le marquage réel au tableau avec le repère du schéma et le point du plan de position. Si des conducteurs, protections ou réglages changent pendant la mise en service, la documentation suit ; un premier export PDF n’est pas une version finale.",[11,2458,2460],{"id":2459},"exemple-un-nouveau-circuit-terminal-pour-le-sèche-linge","Exemple : un nouveau circuit terminal pour le sèche-linge",[16,2462,2463],{},"Pour un sèche-linge raccordé à demeure, « buanderie » ne suffit pas. Le dossier montre de quel tableau et derrière quelles protections part le circuit, quel repère il porte, quelle canalisation avec combien de conducteurs et quelle section est posée et quel appareil se trouve en bout de ligne. Lave-linge, sèche-linge et lave-vaisselle disposent chacun d’un circuit dédié (sous-section 5.2.1.2) et sont protégés par un différentiel à haute ou très haute sensibilité (sous-section 4.2.4.3, b). Le même repère figure à l’emplacement réel sur le plan de position. Notice, caractéristiques et réglages de l’appareil sont conservés comme documentation technique.",[16,2465,2466],{},"Contrôlez ensuite les interfaces : le chemin du conducteur de protection est-il traçable ? Le mode de raccordement correspond-il au dessin ? Une alimentation individuelle prévue est-elle devenue une ligne partagée sur chantier ? Une boîte de dérivation manque-t-elle sur le schéma ? Ces questions évitent que des pages formellement complètes conservent un état d’étude dépassé.",[11,2468,2470],{"id":2469},"remettre-une-série-documentaire-maîtrisée","Remettre une série documentaire maîtrisée",[16,2472,2473],{},"Identifiez l’édition finale par projet, adresse, indice de révision et date d’export. Classez schéma unifilaire, plan de position, rapport de contrôle et documents techniques dans un dossier ordonné. Les copies de travail et les révisions remplacées sont marquées séparément comme historique. Le propriétaire sait ainsi quels fichiers sont actuels et que toute modification ultérieure devra être documentée.",[16,2475,2476,2477,2481,2482,568],{},"La ",[556,2478,2480],{"href":558,"rel":2479},[560],"page officielle du SPF Économie sur le contrôle des installations domestiques"," énumère les plans à fournir au minimum et en résume le contenu. Les prescriptions détaillées figurent dans le ",[556,2483,2485],{"href":1850,"rel":2484},[560],"RGIE Livre 1, version 06",[11,2487,2489],{"id":2488},"préparer-avec-planelec","Préparer avec PlanElec",[16,2491,2492],{},"PlanElec réunit fond de plan, topologie électrique et données des tableaux dans un même projet. Le schéma unifilaire et le plan de position naissent du même modèle, portent les mêmes repères et sortent en PDF ou sous forme de dossier d’installation composé, avec page de garde et table des documents. L’autocontrôle RGIE vérifie les règles prises en charge à partir des données de votre projet et signale les points ouverts avant que le contrôleur ne les trouve.",[16,2494,2495],{},"Les rôles sont clairement répartis : PlanElec structure et vérifie la documentation. La vérification du raccordement, le calcul des câbles, le relevé de chantier et les mesures restent le travail des professionnels sur place, et le contrôle de conformité officiel est réalisé par l’organisme agréé.",[11,2497,2499],{"id":2498},"guides-liés","Guides liés",[159,2501,2502,2508,2514,2520,2526,2532],{},[162,2503,2504],{},[556,2505,2507],{"href":2506},"\u002Ffr\u002Fblog\u002Fschema-unifilaire-vs-plan-situation","Coordonner unifilaire et plan de position",[162,2509,2510],{},[556,2511,2513],{"href":2512},"\u002Ffr\u002Fblog\u002Fsymboles-electriques-rgie","Comprendre les symboles RGIE",[162,2515,2516],{},[556,2517,2519],{"href":2518},"\u002Ffr\u002Fblog\u002Fcontrole-electrique","Préparer le contrôle électrique",[162,2521,2522],{},[556,2523,2525],{"href":2524},"\u002Ffr\u002Fblog\u002Finterrupteur-general-obligatoire-rgie","L’interrupteur général est-il obligatoire selon le RGIE ?",[162,2527,2528],{},[556,2529,2531],{"href":2530},"\u002Ffr\u002Fblog\u002Fliste-de-materiel-installation-electrique","Établir la liste de matériel d’une installation électrique",[162,2533,2534],{},[556,2535,2537],{"href":2536},"\u002Ffr\u002Fblog\u002Fdetecteur-fumee-obligatoire-belgique","Détecteur de fumée obligatoire en Belgique : les règles par Région",[16,2539,2540],{},[556,2541,2543],{"href":2542},"\u002Ffr","Démarrer un projet neuf dans PlanElec →",[16,2545,2546],{},[630,2547,2548],{},"Référence : RGIE Livre 1 V06, notamment chapitre 2.13, section 3.1.2, tableau 4.11, sous-section 4.2.4.3, sous-section 5.2.1.2, chapitre 6.4 et section 9.1.2. Le texte officiel et l’installation exécutée restent déterminants.",{"title":634,"searchDepth":635,"depth":635,"links":2550},[2551,2552,2553,2554,2555,2556,2557,2558,2559,2560,2561,2562,2563,2564,2565,2566,2567,2568],{"id":1957,"depth":635,"text":1958},{"id":1976,"depth":635,"text":1977},{"id":2086,"depth":635,"text":2087},{"id":2116,"depth":635,"text":2117},{"id":2149,"depth":635,"text":2150},{"id":2179,"depth":635,"text":2180},{"id":2212,"depth":635,"text":2213},{"id":2248,"depth":635,"text":2249},{"id":2281,"depth":635,"text":2282},{"id":2294,"depth":635,"text":2295},{"id":2327,"depth":635,"text":2328},{"id":2360,"depth":635,"text":2361},{"id":2370,"depth":635,"text":2371},{"id":2449,"depth":635,"text":2450},{"id":2459,"depth":635,"text":2460},{"id":2469,"depth":635,"text":2470},{"id":2488,"depth":635,"text":2489},{"id":2498,"depth":635,"text":2499},"Ce que doit contenir le schéma unifilaire d’une construction neuve : cartouche, alimentation, protections, canalisations, récepteurs, sources et concordance avec le plan de position selon le RGIE Livre 1 V06.","fr",{},"\u002Fblog\u002Fnew-build-single-line-checklist.fr",{"title":1952,"description":2569},"Unifilaire en construction neuve : checklist RGIE","schema-unifilaire-construction-neuve-checklist","blog\u002Fnew-build-single-line-checklist.fr",[671,672,2578,2033,674,2579,2580,2581],"construction neuve","plan de position","contrôle de conformité","Belgique","bpdaYx3Pnb8TEQGYPjB2OQqcWqDuji4i2WB4usrtalo",{"id":4,"title":5,"articleId":6,"body":2584,"category":655,"date":656,"description":657,"extension":658,"image":30,"lastUpdated":659,"locale":660,"meta":3025,"navigation":456,"ogImage":662,"path":663,"publishDate":656,"readTime":664,"refreshInterval":665,"seo":3026,"seoTitle":667,"slug":668,"stem":669,"tags":3027,"__hash__":678},{"type":8,"value":2585,"toc":3005},[2586,2588,2592,2596,2598,2600,2686,2688,2690,2702,2704,2706,2708,2710,2726,2728,2730,2732,2746,2748,2750,2752,2754,2768,2770,2772,2774,2776,2790,2794,2796,2798,2800,2814,2816,2818,2820,2822,2824,2826,2830,2832,2844,2846,2848,2850,2852,2866,2868,2870,2872,2874,2876,2939,2941,2943,2945,2947,2949,2951,2953,2955,2963,2965,2967,2969,2971,2997,3001],[11,2587,14],{"id":13},[16,2589,18,2590,23],{},[20,2591,22],{},[16,2593,2594],{},[27,2595],{"alt":29,"src":30},[16,2597,33],{},[11,2599,37],{"id":36},[39,2601,2602,2612],{},[42,2603,2604],{},[45,2605,2606,2608,2610],{},[48,2607,50],{},[48,2609,53],{},[48,2611,56],{},[58,2613,2614,2622,2630,2638,2646,2654,2662,2670,2678],{},[45,2615,2616,2618,2620],{},[63,2617,65],{},[63,2619,68],{},[63,2621,71],{},[45,2623,2624,2626,2628],{},[63,2625,76],{},[63,2627,79],{},[63,2629,71],{},[45,2631,2632,2634,2636],{},[63,2633,86],{},[63,2635,79],{},[63,2637,71],{},[45,2639,2640,2642,2644],{},[63,2641,95],{},[63,2643,79],{},[63,2645,100],{},[45,2647,2648,2650,2652],{},[63,2649,105],{},[63,2651,79],{},[63,2653,110],{},[45,2655,2656,2658,2660],{},[63,2657,115],{},[63,2659,118],{},[63,2661,100],{},[45,2663,2664,2666,2668],{},[63,2665,125],{},[63,2667,118],{},[63,2669,100],{},[45,2671,2672,2674,2676],{},[63,2673,134],{},[63,2675,137],{},[63,2677,71],{},[45,2679,2680,2682,2684],{},[63,2681,144],{},[63,2683,147],{},[63,2685,150],{},[11,2687,154],{"id":153},[16,2689,157],{},[159,2691,2692,2694,2696,2698,2700],{},[162,2693,164],{},[162,2695,167],{},[162,2697,170],{},[162,2699,173],{},[162,2701,176],{},[16,2703,179],{},[16,2705,182],{},[11,2707,186],{"id":185},[16,2709,189],{},[159,2711,2712,2714,2716,2718,2720,2722,2724],{},[162,2713,194],{},[162,2715,197],{},[162,2717,200],{},[162,2719,203],{},[162,2721,206],{},[162,2723,209],{},[162,2725,212],{},[16,2727,215],{},[11,2729,219],{"id":218},[16,2731,222],{},[159,2733,2734,2736,2738,2740,2742,2744],{},[162,2735,227],{},[162,2737,230],{},[162,2739,233],{},[162,2741,236],{},[162,2743,239],{},[162,2745,242],{},[16,2747,245],{},[11,2749,249],{"id":248},[16,2751,252],{},[16,2753,255],{},[159,2755,2756,2758,2760,2762,2764,2766],{},[162,2757,260],{},[162,2759,263],{},[162,2761,266],{},[162,2763,269],{},[162,2765,272],{},[162,2767,275],{},[16,2769,278],{},[11,2771,282],{"id":281},[16,2773,285],{},[16,2775,288],{},[159,2777,2778,2780,2782,2784,2786,2788],{},[162,2779,293],{},[162,2781,296],{},[162,2783,299],{},[162,2785,302],{},[162,2787,305],{},[162,2789,308],{},[16,2791,311,2792,316],{},[313,2793,315],{},[11,2795,320],{"id":319},[16,2797,323],{},[16,2799,326],{},[159,2801,2802,2804,2806,2808,2810,2812],{},[162,2803,331],{},[162,2805,334],{},[162,2807,337],{},[162,2809,340],{},[162,2811,343],{},[162,2813,346],{},[16,2815,349],{},[11,2817,353],{"id":352},[16,2819,356],{},[16,2821,359],{},[16,2823,362],{},[11,2825,366],{"id":365},[16,2827,369,2828,373],{},[313,2829,372],{},[16,2831,376],{},[378,2833,2834,2836,2838,2840,2842],{},[162,2835,382],{},[162,2837,385],{},[162,2839,388],{},[162,2841,391],{},[162,2843,394],{},[16,2845,397],{},[11,2847,401],{"id":400},[16,2849,404],{},[16,2851,407],{},[159,2853,2854,2856,2858,2860,2862,2864],{},[162,2855,412],{},[162,2857,415],{},[162,2859,418],{},[162,2861,421],{},[162,2863,424],{},[162,2865,427],{},[16,2867,430],{},[11,2869,434],{"id":433},[16,2871,437],{},[16,2873,440],{},[11,2875,444],{"id":443},[159,2877,2879,2884,2889,2894,2899,2904,2909,2914,2919,2924,2929,2934],{"className":2878},[448],[162,2880,2882,458],{"className":2881},[452],[454,2883],{"disabled":456,"type":457},[162,2885,2887,464],{"className":2886},[452],[454,2888],{"disabled":456,"type":457},[162,2890,2892,470],{"className":2891},[452],[454,2893],{"disabled":456,"type":457},[162,2895,2897,476],{"className":2896},[452],[454,2898],{"disabled":456,"type":457},[162,2900,2902,482],{"className":2901},[452],[454,2903],{"disabled":456,"type":457},[162,2905,2907,488],{"className":2906},[452],[454,2908],{"disabled":456,"type":457},[162,2910,2912,494],{"className":2911},[452],[454,2913],{"disabled":456,"type":457},[162,2915,2917,500],{"className":2916},[452],[454,2918],{"disabled":456,"type":457},[162,2920,2922,506],{"className":2921},[452],[454,2923],{"disabled":456,"type":457},[162,2925,2927,512],{"className":2926},[452],[454,2928],{"disabled":456,"type":457},[162,2930,2932,518],{"className":2931},[452],[454,2933],{"disabled":456,"type":457},[162,2935,2937,524],{"className":2936},[452],[454,2938],{"disabled":456,"type":457},[11,2940,528],{"id":527},[16,2942,531],{},[16,2944,534],{},[11,2946,538],{"id":537},[16,2948,541],{},[16,2950,544],{},[11,2952,548],{"id":547},[16,2954,551],{},[16,2956,554,2957,562,2960,568],{},[556,2958,561],{"href":558,"rel":2959},[560],[556,2961,567],{"href":565,"rel":2962},[560],[11,2964,572],{"id":571},[16,2966,575],{},[16,2968,578],{},[11,2970,582],{"id":581},[159,2972,2973,2977,2981,2985,2989,2993],{},[162,2974,2975],{},[556,2976,590],{"href":589},[162,2978,2979],{},[556,2980,596],{"href":595},[162,2982,2983],{},[556,2984,602],{"href":601},[162,2986,2987],{},[556,2988,608],{"href":607},[162,2990,2991],{},[556,2992,614],{"href":613},[162,2994,2995],{},[556,2996,620],{"href":619},[16,2998,2999],{},[556,3000,626],{"href":625},[16,3002,3003],{},[630,3004,632],{},{"title":634,"searchDepth":635,"depth":635,"links":3006},[3007,3008,3009,3010,3011,3012,3013,3014,3015,3016,3017,3018,3019,3020,3021,3022,3023,3024],{"id":13,"depth":635,"text":14},{"id":36,"depth":635,"text":37},{"id":153,"depth":635,"text":154},{"id":185,"depth":635,"text":186},{"id":218,"depth":635,"text":219},{"id":248,"depth":635,"text":249},{"id":281,"depth":635,"text":282},{"id":319,"depth":635,"text":320},{"id":352,"depth":635,"text":353},{"id":365,"depth":635,"text":366},{"id":400,"depth":635,"text":401},{"id":433,"depth":635,"text":434},{"id":443,"depth":635,"text":444},{"id":527,"depth":635,"text":528},{"id":537,"depth":635,"text":538},{"id":547,"depth":635,"text":548},{"id":571,"depth":635,"text":572},{"id":581,"depth":635,"text":582},{},{"title":5,"description":657},[671,672,673,100,674,675,676,677],[]]